DNEPROPETROVSK AUTOMOBILE PLANT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R008800080004-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 17, 2012
Sequence Number: 
4
Case Number: 
Publication Date: 
November 15, 1951
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R008800080004-7.pdf658.83 KB
Body: 
Declassified in Part kv ~ ( ~" / , ( 1 JN-LUCFAX 8, N'1't=1 1 t(;FN('.I= Af FN(V RrpnpT I WOR IOIN REPORT CD NO. COUNTRY U:S (Ukrainian 'cm) SUBJECT ' Dnepropetrrovsk Autoa~ obilo plant PLACE ACQUIRED DATE OF INFO. DATE DISTR. 15 Nov. 1951 NO. OF PAGES 6 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION OP 5'88 CWTSD $?ATS?P 614111: 9113 m'=m09 0P 91113 23r'M GZ AC? so 0.8. C.. 81 AND $2. AO ACRD D. 1Y$ T2ANO $10510..3 On 7K13 N .AT2M1 1. - Lo ati on : The plant is located on a hill near the village of Krasnonolyo about I mile east of the village between the erropetrovsk-A7)osto ovo- arson railroad line and the tcra.voi Rog line branching off south of the plant. It presumably extends on both sides of the Dnepropetrovsk-'"a;,.-srozh+ .-Romakovka high- way. A ' 23--foot wide asphalt highway and a double-track streetcar line leads from the plant to the town. the p t is located in the oven country and surrounded by kolkhozy. An airfield is said to be north of the plant which allegedly has several hangars with curve ing and a radio direction-finder control station A six track loading station is at the Dnepropetrovsk-,Apostolovo railroad line. This station has a sour track to the plant . with sidings to the different departments I. 1'. cant lax: Construction of the plant started in 1945 The foundations of some workshops, already built before the Gerr:azi occuxation and which remained after the workshops were blasted by the retreating Gernans, were allegedly utilized in the new construction work. The first building series is scheduled to be completed by 1950 the construction of sore workshops, including workshop building No,, 1, is projected in the current Five-Year Plan. However, the final bui l activities will 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM presumably extend into the following Five-tear Plan diction 50X1-HUM work was especially Pushed with all available means In 1945 The ?Yushavtostroi Trust is in charge of the plant construction The plant includes the pomstroi I Plant (the proper automobile plant) and the ?'omstrol II Plant, which comprises the auxiliary ) denarbse7t~ such as the sawmill, concrete plant, and the slegbiock factory The distance between the Pr,rnstroi I and the Pometroi II 50X1-HUM 50X1-HUM 50X1-HUM Document No. ------------------- '"1-HUM Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 CLASSIFICATION nlrrr~v AIR X FC RI A~r "o .Change In Mass. [] Declassified \ ~- Itla= CIS fed To: TS S NFL, 7pi-2 \`ae:_, AUG 1978 P ' 11 011TROL-US GF I'. I.. 11 DISTRIBUTION +1~ '50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 '' Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 ' .A ,to.:Umi on in Zvi ohs (N51WnndererA udi ,1.GRET/CONVRt7L-US 'ICIAIS ONLY ,'&4L INTELLIGENCE AGENCY The 50X1-HUM Pomstroi I .. 50X1-HUM Plants i s about I.. to 2 males The warkshopa are iron , and con crete structures built on ron.conorete fousdatione 50X1-HUM 50X1-HUM A great number of 4meriean machines as .well as machines di miantledl in 50X1-HUM the Soviet Zone of ' Germany were used as equ4pmerrt in the plant. The German machines allegedly origins follawi tied 50X1-HUM antsy u palm . Benz0 Gloeeknser Krupp, Siemens-Schueke> t and Brawn..' Work.. Opel. in Sonnet E j M53 d06 g~tto-Videwn -4 fl mrdta ( fW66} 50X1-HUM Platinstallations: The, entire building project (including settlement offYoe and Workshop No, 10 Souse ? deparrtments are '50X1-HUM intercch~ane a an underground chann,a sy em (for long..distaursce heat. i ~ . chit es) All departments of the Pomstrcn . II ~tst Warne 50X1 -HU M in operation. p !o. oundry) Workshop No. A oo woe department 50X1-HUM ? W X0 16 ork op (boiler bou e) Workshop No. 7 (b ildingF^.,4 shop (173) 'the wheell, department (81), the instrument department, and 50X1-HUM the punching shop (81) ? W orkahop No; 2 (forge) Worksho 50X 1-H U M Plant were ins; operation shop No. 1 (c6assis de can which includes thift and awdliarsy plants) cover ",area area of about 1,000 acre plant exterW 2, 5, miles . The follows work sh a of the The. n'omstro I Automobile Plant includes the workshop buildings No, 1 to 10 and 17 to 19, while the nomatro TI Auxili~_ MM- of comprised of workshop buildings No. U to 3.6 6, The fo r0, _ t. T ho building is an iron-concrete structure with 6 It is 10,600 feet in length' and 1 000 50X1-HUM $ feet wide a This structures which is on a cons foundations ours-HUM in about. 3 feet 3 inches thick On with longitudinal side 50X1-HUM of the workshop is a canal lfnod .with. cement slabs which is 10 feet wide and 8 feet deep. Outside the i tilding the canals ea 50X1-HUM ti=0 as tunnels in both dirdeti 32 to 50 feet a e r_ .. 50X1-HUM case leads to the bottom of canal These ceirsala are pro b assembly pits. Also nng the longitudinal side of the workshop is a conveyor belt abou 650 feet long, and four feet t4de running at a height of about two feat orted3,ys 50X1-HUM 'traveling crabs are located in this w katsop The work- shop is partitions wa1 .s [ Theme is one,section for 50X1-HUM the administration one section for the millin and drib 50X1-HUM ice.:. shop, and one se on for the hardening shop 77 The won ?. 50X1-HUM shop Vas completed The 00 or:,belt. was still under corsstruc on and was tested after 50X1-HUM Production n s workshop started ao ?auinment: The following nachins+a were installed turret lathes and vertical turnine and bori welding apparatus?_Jcar body presses and eig t maonlnesi PuM rss crru.ling machines grinding machines milling machines plate saes 77 r vatin ha sera fi~c3a~ fo~gaes 5nxl-J-ii inn 50X1-HUM 50X1-HUM OUA I -riUIvi 50X1-HUM 50X1-HUM 50X1-HUM 5 UX1-HUM bQ rods tion Items produced included gear wheels, min es izs liar titer (nor manshift- 1 m: 4Q pieces per pieces per manshif' t) ston pi x~nsgs 50X1-HUM and nuts., mfting tools or ragUne tools in the P 50X1-HUM and sepia and mill cutterp, The aces ; of trucks = . delivered - wag ~s 50X1 HUM - SECREP/C tOL-tTS OFFICIALS ONLY Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 the aatte desipn as Workshon no_ ,1 CEg'TRAL I?1TELLIGEPQi AGEY4'CI (2) The building is an iron-co ncree structure It has ui jent: Consists of German and American m chines. It includes cis extre neiy heavy and two mediurd'-size eumatio hommers$ eight electric forge Baas our auto enone welding 50X1-HUM installations and iron shears for all garages b. . ' ction: Soning -plates { t) Foa? ' .qdjZt It is housed in an iron-concrete ntrimt.1-1yom oducti ri t Single ')arts mep 00AC3-Lats of arc thr workshots buildings. They are iron..concreto s ec The roof i e covered 'with slag L- ~Or concrete slabs A e?#,rack nlrint tai lroad line rues betwtezi the taar1cceho bui Binge This de mane it wan norni AtAA~ - f7P_iC8'trtr 4PFSi $ 4'non .risww .9 ..~~~1 4 ~~ 5) b 1.0 T kh-b7o or de artmen t This depart.. t ' on with workshop No. 4 DOTS are ou. ed In the sa.e workshop Wilding. the foundry and the forge {department No 2)~ the _aurtd tree war's oti buildings situated 'side by side rn 'as excavato aces two furnaces, each 10 feet high and 4 feet in acne er, were under construction. Each kurnace has a fir') olaca and a metal woke. stack rising 6.5 feet above the roofing r b. o eta ort According to Its dosignation, the foundry orodaces snare Harts for repairs, a? fo the basement for three Ea 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM ?'y .n : This foundry- was under construotion 1 50X1-HUM 1t[a4Ta r_ l mall-on, al -1-- (6) Boiler housot It has a high smoke stack. Construction was conpleted T {i) {) entire plant. Nildina office :'EGRET/CO THOL?-US OFFICIALS ONLY his installation was scheduled to heat the A two-story brickwork building Wopkah!)p- buildings The steel. "tractions for this buildin and h 'Lions for the n chiney were completed A foasaclry will alle dl ge y be housed in this building Workshop building: This building had only one large f rnaes Workshop buildino: It was almoat completed ? ~..4.~u~. 'Ry udSeTi3 `60 for three furnaces have been eaxcavated {tea.) C e e f`eoi.a a ezo..Hetau i akh) a The concrete factory was one of the rat buildings completed The produced concrete is used for plant construction work In the northwest of the plant area i s the mixing mill wi e _ o owing mixers one large mixer for two mixtures, one medium mixer for one m tutee - a one email, mixer for One- half to th a? quarter n, I xture. one sidxture consists of one wheelbarrow-load of cement,, three vhselt owx .loads of gravel, two' -wheolbarrow.?loada of mod, and two wheelbarrow ioada of slag. The actual time consumed filling the rimer is appr imate1 ' five minutes, while the mixing operation.. lasts from two to three minutes. Detwovn $20 and 190 mixtures were t'aduced.daily. Most of the work wary done in two shifts of about 30 men' each. The concrete is shipped in four dump trucks (during rush hours in six dump trucks) to the. varl pas The forge was ')u Into onefttlon It allegedly. has rail conneb.. 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM SE CM/CONTROL-GS OFFICIALS ONLY Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 SECU"T/CA I' O -IIS CreICIALS Y Work is done in two asbif is of thirty men eat, CENTRAL ELT TGENCE AGENCY departments of the. plant , Each track cores four mixture oads 50X1 -HUM Of tm without gra a9nd five mixture-loads of concrete with gravel Concrete slabs measuring 92 x 20 inches and 60 x 22 Inches were 50X1 -HUM Produced (12) Saraiu (tap. Tsekh) Stone building a. Acadwasts Equipment in the plant includes four verttaai . The shift-norm was 76 Cubto motors 2 aflt ' Boards and planks, one. to five 11~&es think 50X1-HUM ,(13) Carpenta (R:P.Ps Dok . Work is done in two shifts mien each, >ir C on included windows and door (14) S1Fa faoto s as Ei menu two presses. b. Pro onion, It includes the ,roduotion of a Eficlal stones made produce. The hollow at-mia weighed 3?4 kg; ile the valght of the solid stones was 24 kg A31egediT, the daily output was 5,000 50X1 -HUM . also housed in this building _ factory is to be rased , after c p s or the plant con oticn o ect to make way for workshop buildings of the automo .e `plant 50X1-HUM (15) .,.,. tL of thus,. '.~..... (1b) Truck rei a . vehicles and 70, t aentt Garage and re,aaif'shou for plant-owned V&G dedgaa A ('1) according to Jiou (1?) W? rksh buildings 4 B etmetuire was campia' in rough No interior equipment had been installed yet (18) a eE nta A cantonment building F hon ng an >a.ectr~.c workshop for plat require emte, . 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM (19) 1orkahoa bui3dis : Only the . steel structure was con plated t(ir July 1948.50X1-HUM (20) Aa:9uss o 1 41 oQk _Bi i ,a structure had two-stories 50X1-HUM T h e haueinp . ee t t 7 . e m e M consisted o f t h r e e stone bull 1 ' Ju3y. .1948.' Foss builciings-were ntiU under cobstruotion Former bujld.?5OX1-HUM were allegedly razed in 391x7 to make wasp far, workshop buildings 50X1-HUM ~DuAI-nuivi (21) Sous' f.C ? s ' This group e?naais 20, to 30sssiagie?a Itorr _ hausee 50X1-HUM v i r ~ o o n p l e t e d J u l y 3948 These hcnzs gez"d as ng quarters for, the technical pereonaie~. about 300 sprenticea were housed in ch Ish Before was desisted Komsomolska settlement; the asad ins tration 50X1-HUM was hged in. this block. A ssettle~ is pro3ected with hour for 50,000 1aorkmen including'a hospital, clubhouse,, a 50X1-HUM (22) f a r. l3 di ,,.e'G~` ~4,1~rYY!_ station the Z `syshe Power F 1G i no sac y 5 0 o ]mesa am led from this a op 50X1-HUM to the automobile plant. w- 1 1 1-1 Lang dia mission lines are also 50 X1-HUM connooted with Krivoi ' Rog and Kirovograd Tht-noles of the over. heard system eupporh three two.4nch. gunge cables 50X1-HUM T",6- " a3tr " ): The' Wirer station was still under cosstraeitan in Deco" air 2948 W Cam N0 732,54 SECT /C0NTRcL.US cFFICM.LS COY Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 SE T/GON LROL-US OFFICIALS ONLY CEAITI~AL IN'Th 10, GE AGENCY b. Automobile park 7. The following installations e, Engine departncnt F were mentianedt 50X1-HUM of about 306 trizoks (US make) in need of repair. q Technical designinp office u ? d. Four bunkers (fuel dumps?) were built about eight feet underground with a concrete bottom. Track installations to the bunker entrances were under construction The roof consisted of a protmed up 12-inch bee r? supOrim,oe a 12,-to 16~,nah -concrete layer and od:~ covered with 6.5 .feet of earth Pipe line 8 to 32 inches ? thi This pine line system was probably tu~. It is locatsd about 20 feet underground and allegedly will interconnecctt all buildings (49)(long- distance heating) 14 fa .ckiaorks, connected with the plant by a cable way L g. Cement works. It Is housed in workeh building No, 34 slabs and cement bricks were produced h. Locksmith's ashen working for pl -nt requirer^ents L 3. Kitchen house and several achniniastration buildings. Warehouse I and storage places for building material end crated machines of Germn and allegedly also ftrerican origin, 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM a. Kind oduat on. The assembly of aalks started about the middle of 1947.- Until then on1v work and tooling of material. 50X1 -HU M .for plant cons? otic L wwas done, Tools and single p u a xch as 50X1-HUM +cy3inders steering gear as, Oardan shafts, front axles, rear 50X1-HUM' axle parts, and brake levers were produced. The first test tr+uak model "DAZ 150'? was (assembled fry 50X1-HUM single parts sunpli by the 6scow Stalin-Plant), The "DAZ.150" built by the. Stalin Plant under the designation "ZIZ 150" as ' a u improved vary Yt Of the old "ZIZ 5" id a truck with a closed driver4 a cabin It. ice . a 50X1-H U M 90 H" vehicle with two axles. It is equipped with a saaix cylinder Otto engine and carries a useful load of 3.5 tons This truck is ache-, 50X1-HUM doled to be built pair ly in Noccoi, but mainly n the Kuxaiajannd 50X1-HUM Dnepropetrorra AntomolAle T-]ante. 'The rodu;ti on of three.-ton - auto- 50X1-HUM mobile cranes , type 9K.31" was started 50X1-HUM Mass production o a type started after it had passed govegument toot, The cranes are mounted' on completed ZIZ `trsiakas 0, These 50X1-HUM ape ruc can be used for repair work in garages (lifting of es 50X1-HUM and of.tractors) and for planting large trees in forest reserves 50X1-HUM ?Mass production of them truck cranes reportedly started in the Lvov Aesembly Plant This plant will also vrroduoe truck cranes with a load 50X1-HUM capacity of f Ve tonss ~ b- Amt of product n (1) oduc.on of trucks: The monthly assembly capacity was 500 .unite tirxtnaesem o When moat deDartinents are in op 50X1-HUM be assumed that the trucks will be tmaanufaetured. in the plant; The 50X1-HUM schedule r-ao es for a xroduction of 25?000 units. The 50X1-HUM annual plant capacity will be 60,000 units (presussably to be reached in 1955), (2) m taartas The first seric a of cranes (5o unite) was cop.. plated between and a half tines scheduled cranes were corn et The output increased two Five hundred units ware 50X1 -HUM canine estimated that about 130 swm/bomot.us CIALS ONLY Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 n Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7 'sjsWT/C0NTR0L-US OFFICIALS MY CENTRAL IRTEXLIGENCE AMM Y 9. materials and rarer. Power 1#i. A plant-ojned TETs paver station was under cons truotian Power for thb Pomstroi II Plant is allegedly tenaicn system !'fort the ow 0 Dmpropetrovsk Power Plant b. Steel is supplied by the ZaTorcahatal Steelworks Steel and- iron structure* required for plant Bonn tsuction t from the M lotov Pl t i D an n nepropetrowek oQ Sbtpprents ofL~building_,material, such as bricks,, cement, slag and tim.. bar erne in by q%.4 9 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM 50X1-HUM d. Parts are delivered by the Stalin Plant in oseoy Completed 50X1-HUM trucks also core from the Moscow Plant k They are converted into e tru 50X1-HUM 100 Work LOW The work force employed in the production de Darteents probably numbers about 3,000 men, Almost all We. are assigned to building work, Part of the Sbviet 8411" workmen art Juveniles trained for their assignments 50X1-HUM in rush revs The FW engineers enrloyed in construction work. were in leading Positions. Soviet convicts were also employed in the plant, Work was done in two and sometir.-es in three shifts of eight hours each, 316 Semis The pant is g rded by military sentries. rECG/Ct ROL. uS OFFICIALS ONLY Declassified in Part - Sanitized Copy Approved for Release 2012/10/17: CIA-RDP82-00457R008800080004-7