MEETING AT WESTINGHOUSE REGARDING (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89B00487R000300600009-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
September 21, 2011
Sequence Number:
9
Case Number:
Publication Date:
May 14, 1956
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP89B00487R000300600009-8.pdf | 125.78 KB |
Body:
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
SAPC-6194
Copyt of 3
14 May 1956
SUBJECT : Meeting At Westin_7honse Regarding APQ-56 Radar
1. Time and Place of Meeting:
The meeting was held on 9 May 1956 in the engineering office
of Westinghouse Air Arm, Friendship Airport.
2. Attendance:
Westinghouse
Project Staff
3.
A written concurrence was forwarded to
Discussion:
a. The first item of discussion was the instructions for
delivery of spares. was informed of Project con-
currence with his of posing delivery procedure.
b. Regarding the total quantity of spares, feels
that the present spares list, ded, W111 e adequate to
support both the AQUATONE and requirements for a period of
one year. As a result, it was agreed that two-thirds of the
spares (groups 1 and 2) should be charged and delivered
AQTTATONE and group 3 should be charged and delivered to
In addition i was geed that three AQUATONE flyaway
be made up at out of the group 2 spares, and
would make up a single FAK out of their group 3 spares. Wes ng-
house is to supply, when able, a recommended list for FAK content.
This will be based on maintenance experience gained during the
Watertown training phase. Additional FAKs will be required by
JBINCLUDE and the USAF projects and should be covered in future
procurement contracts,
c. The delivery of item #1 appears to be on schedule and the
equipment should be installed in the Westinghouse DC-3 before
1 June. All bailment obstacles preventing transfer of B-17
antenna etc., have been removed and the transfer is being made.
R me 3M
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
~rp
d. requested a waiver of the final portion of
the exp os on tests. This test is designed to prove the
presence of an explosive mixture in the explosion chamber.
While the "proof" explosion is meant to be contained in a
wire cage, recent tests have resulted in overall flame pro-
pagation and equipment destruction. A waiver of this portion
of the test specification will be sent to Westinghouse by the
Contracting Officer.
e. The future procurement schedule was the final item discussed.
Attachments A and B show the schedule requested by the Project.
Underlined items are already covered in the existing contract.
Subscripts a, p, u indicated AQUATONE, and USAF equipment
respectively. FAK items in parenthesis are to be made up by
AQUATONE and out of items G and H. Question marks
in these columns indicate times for reconsideration of the
depot supply level.
f.l Iwas informed that Colonel Geary was working on a
priority request for the Westinghouse TWX equipment installation,
g. The in-flight processing equipment being developed for the
APQ-56 by Photo-Mechanisms and Eastman appears to be progressing
very satisfactorily. As a result
(EK) will visit Lockheed 114 May to investigate installation on
a retro-fit basis.
RAK:vd (14 May 1956)
Distribution:
1 - EQUINE MASTER
2 - Chrono
3 - Reading
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8
O'
A
B
p
C
D
)
m
H
E
A
O
c1
F
03
ca m
A u-
40 v
r-1
G
62
43
A `~
v
H
m
a) m
A
O v
\c10
TOTALS
19'
5
8
7
7
12
1
1
1
May 1956
la
la
la
(1)a
la
June
la
la
la
la
July
ip
lP
Aug.
la
la
(1)a
Sept.
lp
(1)p
Oct.
la
P
Nov.
1S
?
Dec,
la
la
Jan, 1957
2p
2p
1P
2P
P
Feb.
2p
lp
lp
lp
lp
u =-
u
Mar.
2p
lu
lp
lu
2p
?
lu
U \
P
u
Apr.
3u-,,,
lu
lp
lu
lu
2p
P
P
P
May
3u
2p
2u
lp
Sanitized C
opy Appr
oved for
Release
2011/09/2
1: CIA-R
DP89B0
0487R00
0300600
009-8