REQUEST FOR ADDITIONAL SUPPORT FOR REDESIGN AND MODIFICATION OF THE TSS HYDROGEN GENERATOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001300030039-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 2, 2012
Sequence Number: 
39
Case Number: 
Publication Date: 
January 21, 1958
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001300030039-2.pdf82.11 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2 w CONFIDENTIAL 0 21. January 1958 M~RtAi FOR: Chief, Technical Services Staff SUBJECT : Request for Additional Support for Redesign and Modification of the TBS Hydrogen Generator RHPCS : A. Memorandum dated 21 August 1957 for C/T$S, Subject: Request for Initiation of Test and Evaluation of Subject Generator Be Memorandum dated 10 December 1957 for C/TSS, Subject: Request for Extension of T&E and for Redesign Generator Doe I' REV DATtIT oRIG CCMP On TYPI CRIG CLASS ...5_ PA011 ISV CLASS s 1. Description of the Project Lusi NIXT Riv -. ~ AUTHI HR 704 This is an existing project that is concerned with the test and evalua- tion and redesign and modification of a TSS developed Mobile Hydrogen Generator. The generator produces hydrogen from the disassociation of ammonia and the product gas is intended to meet the needs of Area Division propaganda balloon operations. The test and evaluation and the redesign and modification of the generator are well undervay. The testing un- covered a design fault that involves high temperature metallurgy and re- design of a basic generator part is necessary. 2. Purpose of the Project The purpose of this part of the project is twofold. One, a contractor that is an expert in the field of high temperature metallurgy will be brought into the program and lend assistance to the testing group and to the original contractor. Two, the results of this study wort will not only be applied to the immediate redesign butt will form the basis for the design of replacement retorts which are intended for subsequent shipment to the generator operations site. 3. Recommended Contractor Me recommend& contractor for this part of the wort is0 The field of high temperature metallurgy is one in VbIGIL this organ za ion has a very high level of technical coapetance. The testing will continue to be under the guidance of the Industrial Gas Branch, Mechanical Division, I. Total Cost CONFIDFNTtAI 25X1 25X1 25)25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2 Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2 w CONFIDENTIAL Support Requirements Liaison vill be maintained for the testing and with when ownership transfer of the generator takes place. 6. Project Engineer The project engineer for this program is West Outbuilding., 7. Security Inforsation Chief 8/Engineering Division DD/P/T8S/ED Distribution: Orig - ED-139 when ret'd from C/ma 1 -= File 1 - ED Chrono CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2012/05/02 : CIA-RDP78-03642AO01300030039-2