LETTER TO (SANITIZED) FROM (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03424A000500100012-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 11, 2012
Sequence Number: 
12
Case Number: 
Publication Date: 
September 22, 1958
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03424A000500100012-4.pdf118.89 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 Q-/ September 22, 1958 SECRET - Registered Mail Return Receipt L Aam 2.5X1 2188 Per recent request of your technical monitor, we are submitting our pro- posal for the fabrication of fifteen (15) TEM units. These units will be the same as the prototype now in your possession. We propose to perform this work on a cost-plus-fixed-fee, one year contract. As shown in attached cost estimate sheet, we expect to incur expenses in the amount of $31,440.42. 0 .30 Very truly yours, 25X1 ? as ___L__ REV DATE 8 = By OG . o eRIO COMP DSO, DPI _f2;! TYPE G f ORIO CLASS ..S PAGES _ K REV CLASS C. JYlT -?- NEXT REV _2-45/0 AUTN1 MR 16-S ROS/cr CCCRIM 'a TI DOWUEIIT ODNTADM DWOlIAT1011 A1FOC1111C THR IMTRHIAL DEFENSE IF THE UNITED STATES WRHHI THE MEANING OP THE ESPIONAGE LAWS. ft11E 13. L S. C . SECINNIS TS3 AND Ti4. ' * THE MANILA IOH OR RE/EIJ .ATNIN OF WIn IN ANT DLIOMO TO AN UNAUTNOR?ED PERSON IS MONIBhTU R LAW. CONFIfFNTI I Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 '0S'T B5TDMMTM 15 TU DEI OU Pro3oot 3nginsring Labor, 700 hours Toshnioian Labor 600 hours Modal Yak., 2000 hours 9 Auoably.Tost Labor, 1000 hours Porahaso parts and at.riaL ............................. 0 & .I ~ ......................................... 0 $ 31,hho.bt 843$31 9/17/58 Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 0 is Work Statement: Fabricate and test fifteen prototype units based on designs of initial prototype unit, using techniques developed during manufacture, assembly and test of this unit. Operational Sequence: A signal from an external source operates a stepping switch which moves through 24 contact positions, presenting at the output a serial binary coded signal representing the time in minutes since the device was started. The stepping switch is driven by a transistorized multivibrator circuit operating a solenoid driven ratchet. The binary code is picked up by the stepping switch from three calendar discs which are solenoid operated, and receive their time base from a watch. A detailed description of operation is given in Appendix I. Specification: Running Time: 60 Day Calendar Run 1"0 TEM readouts. Power Source: External battery supply of 5.5 to 6.5 volts. Manually wound mainspring. Initiation of Readout: Negative 6 volts minimum duration 10 milliseconds and maxdmnim duration 2 seconds. Excitation for readout: 1000 cycles A.C., 6 volts peak to peak, or Environment Temperature Humidity Reports: Bi-monthly reports will be written covering the progress of the work. A final report summarizing the work, relating con- clusions and recommendations will also be written. Five copies of each report will be submitted. CONFIDENTIAL ? P R O P O S A L TIME EVENT MARKER 6 volts D.C. (These are recommended, but other frequencies and voltages can be used). Storage Operating -40? +70?C -30? +70?C 100% R.H. 4 hours 100% R.H. Operating instructions: 'Fifteen sets of operating instructions will be submitted. 113~1 - L - CONFIG~:NTIA(Allr_ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4 CONFIDENTIAL Work Schedules We propose to build the test sixteen prototype units and to furnish a final engineering report, within nine months of the date of the contract. We plan to build the first model in three months, but there will be considerable fabrication of parts for the fifteen units during this same period so that the effort will be divided. over the nine months period, and not concentrated during the last six months. 0 or 9/22/58 a Declassified in Part - Sanitized Copy Approved for Release 2012/06/12 : CIA-RDP78-03424A000500100012-4