NAN CHUNG PETROLEUM REFINERY NAN CHUNG, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010011-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
12
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
11
Case Number: 
Publication Date: 
June 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010011-9.pdf1006.2 KB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 l op Secret Industrial Facilities (Non-Military) DIRECTORATE OF INTELLIGENCE Basic Imagery Interpretation Report Nan Chung Petroleum Refinery Nan Chung, China Top Secret RCS 13/0181/6 25X1 DATE JUNE 1969 copy 101 PAGES 9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF Nan Chung Petroleum Refinery CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service UTM COORDINATES GEOGRAPHIC COORDINATES 48RXK049100 30-49-ION 106-06-IOE MAP REFERENCE AC-P I C N0.25X1 0495-55E 15th RTS. USATC 200, Sheet M0495-9HL, 2nd edition May 65, Scale 1:200,000 (SECRET Not Required This report provides a detailed imagery-derived analysis of the Nan Chung Petroleum Refinery, China, from January 1963 to June 1969. The refinery appeared to be operating when first seen in June 1963 and on all subsequent photography. Products include gasoline, kerosene, diesel and fuel oils, and residuum. The report includes a detailed line drawing, a photograph of the refinery, mensuration of the storage facilities, a discussion of physical features and operational functions, a construction chronology, and reference data. -1- TOP SECRET RUFF RCS - 13/0181/69 25X1 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF 25X1 25X1 -2- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF The Nan Chung Petroleum Refinery is located in the Szechwan Basin, Szechwan Province, 2 nautical miles (nm) north-northeast of Nan Chunq and approximately 105 nm east of Cheng-tu. The refinery is in an agri- cultural area on the flood plain of the Chia-ling River. Crude oil for charging the refinery is probably brought in from the Szechwan Basin oil fields by truck. Products and crude oil in excess of that used locally are probably transported by barge from the Nan Chung area. A small transshipment facility is located on the river I nm south- east of the refinery. No pipeline or rail line has been constructed to the Nan Chung area. The nearest points of access to rail facilities are at Chung-ching 80 nm to the south, and at Cheng-tu about 105 nm to the west. The Nan Chung Thermal Power Plant Refinery) lis collocated with and furnishes electric power and steam to the refinery. Physical Features The refinery area measures approximately 1,800 by 1,500 feet, is irregularly shaped, and occupies approximately 65 acres. It is secured by a wall. Operation Functions The major products are refined petroleum products, primarily gasoline, kerosene, diesel and fuel oils, and residuum. The residuum is probably used for fuel in the pipe furnaces, as reserve fuel at the thermal power plant, and for road surface treatment. Construction Status and Activity January 1963 -- The basic refinery components including the crude distillation unit, the secondary processing units, the thermal power plant, and several products storage tanks were present. The refinery appeared to be in production and the power plant spray pond was in operation. June 1963 -- One covered crude oil storage reservoir and an open water pond had been added. The spray pond at the thermal power plant appeared to be in use. May 1966 -- The following significant expansion was apparent: the addition of two open water ponds in the crude oil storage area; 30 cylin- drical tanks, one piece of U/I processing equipment, and one pumphouse in -3- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF the intermediates storage area; 13 buildings, eight cylindrical tanks and two horizontal tanks in the packaging and shipping area; 12 buildings in the maintenance and support area; and four cylindrical tanks in the products storage area. The plant appeared to be in production and the power plant spray pond was in operation. August 1968 -- Two additional warehouses had been built i.n the main- tenance and support area, and a large area of unidentified material was in open storage next to the larger storage building in the products storage area. The refinery appeared to be active. January 1969 -- A heavy haze prohibited a detailed analysis, but the spray pond was in use, indicating that the refinery was probably in opera- tion. June 1969 -- Two cylindrical crude oil storage tanks had been built in the crude oil storage area. The refinery appeared to be in operation. Facilities and Equipment The following table lists the functional areas and equipment within the refinery. All items are keyed to Figure 3. EQUIPMENT AND FACILITIES AT THE NAN CHUNG PETROLEUM REFINERY Description Equipment Crude Oil Storage 3 irregularly shaped water ponds 2 rectangular water treatment ponds 3 pumphouses 7 covered crude oil reservoirs each measure -4- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF Area Description Equipment B Crude Oil Distillation I atmospheric fractionating column I redistillation column I compressor building I pipe furnace I control building 2 banks heat exchanges/cooling coils 2 horizontal tanks C Intermediates Storage 4 cylindrical tanks 4 - 10 feet diameter I U/I building with at least 4 column/tank foundations I possible stack foundation 2 miscellaneous buildings 39 cylindrical tanks I piece U/I process equipment I pumphouse 3 miscellaneous buildings D Packaging and Shipping 2 packaging buildings II storage buildings I possible office building 2 possible pumphouses 8 cylindrical tanks 8 - 15 feet diameter 2 horizontal tanks 2 ~ E Maintenance and Support 2 maintenance buildings 9 warehouses I possible forge foundry 8 small miscellaneous buildings 2 stockpiles of maintenance/ engineering material TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 25X1 TOP SECRET RUFF -w W NOTE: THIS DRAWING IS BASED ON UNRECTIFIED PHOTOGRAPHY 0 0 MOD EEI FED ?O AND REFLECTS THE LATEST IMAGERY DERIVED INFORMATION AVAILABLE w - - O AREA C b[ o III= :X000 1 .0000 00 :0 P Q O ? O O J~RO ~J 8 ~ ,/ ~OoO 1 1 00 KEY TO ANNOTATIONS AREA DESCRIPTION A CRUDE OIL STORAGE B CRUDE OIL DISTILLATION C INTERMEDIATES STORAGE D PACKAGINGAND SHIPPING E MAINTENANCE AND SUPPORT F U/I SECONDARY PROCESSING G THERMAL POWER PLANT H PRODUCTS STORAGE 0 0000 moo CIO 0 EE:13 dP t~ L-i ^ DA a LEGEND HORIZONTAL TANKS PIPE FURNACES 1 HEAT EXCHANGERS, COOLING COILS, -6- 25X1 TOP SECRET RUFF OR ACCUMULATORS PROCESSING EQUIPMENT FILTER AND TREATMENT BASINS BUILDING STRUCTURES UNDER CONSTRUCTION STORAGE TANKS STACK WALL FENCE Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF -7- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Area Description TOP SECRET RUFF Equipment F U/I Secondary Processing 3 U/I processing units (columns/reactors) 2 pipe furnaces I processing building with 6 rows of probable equipment on the roof 2 banks U/I processing equipment I bank heat exchanging cooling coils, or accumulators 18 associated buildings 23 cylindrical processing/storage 2 horizontal storage tanks 2 - 20 feet long by 8 feet diameter G Thermal Power Plant I boilerhouse I generator hall I control building and transformer substation 2 coal preparation buildings I water tower 25 feet diameter I large spray pond 5 cylindrical tanks H Products Storage 2 storage buildings 5 possible pumphouses I water pond NOTE: Diameter measurements of the storage tanks are approximate. TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 TOP SECRET RUFF Map 15th RTS. US Air Target Chart 200, Sheet M0495-9HL 2nd edition May 65, Scale 1:200,000 (SECRE Requirement TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 25X1 25X1 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010011-9