KUYBYSHEV PETROLEUM REFINERY NO,. 2 NOVOKUYBYSHEVSK, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79T00909A000500010001-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
29
Document Creation Date:
December 28, 2016
Document Release Date:
June 18, 2008
Sequence Number:
1
Case Number:
Publication Date:
May 1, 1971
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP79T00909A000500010001-0.pdf | 997.79 KB |
Body:
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Top Secret
Industrial Facilities
(Non-Military)
DIRECTORATE OF
INTELLIGENCE
Basic Imageiy Interpretation Report
Kuybyshev Petroleum Refinery. No. 2
Novokuybyshevsk, USSR
Top Secret
RCS 13/0042/71
25X1
DATE
copy 117
PAGES 28
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
CENTRAL INTELLIGENCE AGENCY
Directorate of Intelligence
Imagery Analysis Service
Kuybyshev Petroleum Refinery No. 2
RCS - 13/0042/71
MAP REFERENCE
8th RTS. USATC, Series 200, Sheet M0165-17HL 5th ed. Noy 67, snaip.1.2no-noo
(SECRET
25X1
LJ/~ I
25X1
25X1
Kuybyshev Petroleum Refinery No. 2 is the largest single refinery in the Soviet
Union with respect to charge capacity. It is one of two petroleum refineries in the
Kuybyshev area.
The major production facilities of the refinery include crude oil distillation
units, desalting units, thermal and catalytic cracking units, gas fractionation
and probable gas processing units, lubricating oil plants, blending and treating
units, alkylation and probable thermal alkylation units, probable catalytic reform-
ing-hydrotreating units, possible hydrotreating units, and possible polymerization
and extraction units. Several unidentified processing units are also present. In
January 1971 one processing unit was under construction.
The products include straight-run, cracked and blended gasolines with a wide
range of octane ratings, kerosene, diesel and fuel oils, lubricating oils, waxes,
asphaltic materials, and probably petrochemicals or petrochemical feedstocks.
The refinery was in operation on all photographic coverage from April 1962
through January 1971.
This report includes a location map, two line drawings, three photographs
of the refinery, mensuration of storage tanks, and a discussion of the status
of facilities.
-1-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
25X1
LJ/~ I
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Kuybyshev Petroleum Refinery No. 2 is the largest single refinery in the
Soviet Union with respect to charge capacity. It is one of two petroleum
refineries in the Kuybyshev Area and is situated on the southwest bank of
the Volga River, about 12 nautical miles (nm) southwest of Kuybyshev (see
Figure 1). The refinery reportedly was started in 1950 and began partial
operation in 1952. 1/
The refinery is served by a rail spur from the main line between
Kuybyshev and Syzran. Most of the crude oil to charge the refinery comes
by pipeline from the Makhanovo oil field. Smaller amounts are supplied
by the oil fields at Romaskino and Tuymazy. All three of these oil fields
are in the Volga-Urals production region. 1/
Electric power and steam for the refiner nrndw-Pd at the collocated
Kuybyshev Heat and Thermal Power Plant TETS 2 e adjacent 25X1
Kuybyshev Synthetic Alcohol Plant Novokuybyshevsk is connected 25X1
y pipelines. The Kuybyshev Petroleum Refinery Lend Lease 3
25X1
s located 5 nm east of the refinery.
Physical Features
This refinery occupies an area 14,000 by 8,500 feet and covers about
2,700 acres (see Figures 2-6). It is partially secured by walls and fences.
Operational Functions
The major refining units presently in operation at this refinery include
ten crude oil distillation units, ten desalting units, five thermal cracking
units, three catalytic cracking units, one gas fractionation unit, one probable
gas processing unit, two lubricating oil plants, several blending and treating
units, one alkylation unit and one probable thermal alkylation unit, three
probable catalytic reforming-hydrotreating (CR-HT) units, three possible polymer -
zation and extraction units, and two possible hydrotreating units. Also, there
are several unidentified processing units, including some which probably produce
petrochemicals or petrochemical feedstocks.
Based on the identification of processing units, the products of the
refinery include straight-run, cracked, and blended gasolines in a wide range
of octane ratings, kerosene, diesel and fuel oils, lubricating oils, waxes,
asphaltic materials, and probably petrochemicals or petrochemical feedstocks.
Construction and Operational Status
The earliest good-quality photography used in this study is from September
1962. At that time approximately 90 percent of the present processing equipment
and storage tanks were in place. The only units not in place were the three
probable CR-HT units, the sulfuric acid plant, a possible blending unit, and four
unidentified processing units.
On photography of February 1'964, the three probable CR-HT units (Area B,
Figure 4) were under construction, the sulfuric acid plant was complete, and the
possible blending unit (Area JJ, Figure 6) was complete. Two of the unidentified
processing units (Areas II and QQ) were complete and one was under construction
(Area J).
By May 1965 one of the probable CR-HT units was complete and the other two
were nearly complete. Construction was continuing on the unidentified processing
units.
-3-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Photography of June 1966 revealed that the other two probable CR-HT units
were complete. The unidentified processing unit in Area J was nearly complete.
The unidentified unit in Area C was in the early stages of construction.
By April 1970 the unidentified processing units in Areas C and J were complete.
The probable thermal alkylation unit in Area CC3 was being dismantled. Construction
had started on a processing unit just southeast of Area J (Figure 4).
By January 1971, little additional construction was apparent on the processing
unit southeast of Area J. No other construction was noted in the refinery.
Facilities and Equipment
Tables 1 and 2 list the functional areas and equipment in the refinery, and
are keyed to Figures 4 and 6 respectively. The buildings and processing equip-
ment in the unidentified unit southeast of Area J are not listed in the tables.
All measurements in the tables are rounded to the nearest half-meter.
Table 1. Equipment and Facilities at Kuybyshev Petroleum Refinery No. 2
Northeast Section (Keyed to Figure 4)
Area Functional Description Equipment and Facilities
A Storage 2 Probable pump buildings
1 Support building
51 Cylindrical storage tanks
7 19.5-meter-diameter
11 15-meter-diameter
9 12-meter-diameter
8 9-meter-diameter
11 6-meter-diameter
Probable Catalytic Reforming- 2 Units, each with
Hydrotreating 4 reactors
7 columns
4 banks of heat exchangers/
cooling coils/accumulators
4 pipe furnaces
1 processing building with
4 horizontal and 1
cylindrical treating
tanks
7 small processing/support
buildings
2 pump buildings
11 cylindrical storage tanks
(not measured)
1 Unit with
4 reactors
11 columns
1 bank of heat exchangers/
cooling coils/accumulators
3 pipe furnaces
5 processing buildings
3 pump buildings
2 support buildings
2 cylindrical storage tanks
3 meters in diameter
10 Support buildings
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Q
Next 1 Page(s) In Document Denied
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
25X1
25X1
Functional Description Equipment and Facilities
Unidentified Secondary 1 Unit with
Processing 9 columns
1 large cluster of processing
equipment
2 processing/pump buildings
1 horizontal storage tank
12 meters long
14 support buildings
Storage and Unidentified
Secondary Processing
(1) Unidentified Secondary 1
Processing
(2) Storage
1 qasholder,
Unit with
8 columns
1 processing building
3 support bud" inriq
2 Probable pump buildings
73 Cylindrical storage tanks
4 15-meter-diameter
12 6-meter-diameter
13 Horizontal storage tanks,
13.5 meters long
25X1
Unidentified Secondary 1 Unit with
ns
m
Processing
18 9-meter- lame er
7 co u
1 cluster of processing
equipment
1 bank of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
2 cylindrical storage tanks
3 meters in diameter
1 Unit with
8 columns
1 cluster of processing
equipment
1 bank of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 processing building with
5 horizontal and 1
cylindrical treating tanks
4 processing buildings
1 pump building
1 cylindrical storage tank,
3 meters in diameter
Probable Gas Processing and
Unidentified Secondary
Processing
(1) Unidentified Secondary 2
Processing
Units, each with
2 columns
1 cluster of processing
equipment
2 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 compressor building
-8-
~..., rr1'e[T DIICG
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Probable Dewaxing and
Unidentified Secondary
Processing
(1) Probable Dewaxing
F (Cont) (2) Probable Gas Processing 1 Unit with
30 columns
4 clusters of processing
equipment
2 banks of heat exchangers/
cooling coils/accumulators
4 processing buildings (one
with 3 horizontal tanks)
1 pump building
2 cylindrical storage tanks
25X1
1 Unit with
3 columns
2 clusters of processing
equipment
1 processing building with
12 horizontal tanks
2 processing buildings (one
with 12 cylindrical tanks
and 1 bank of heat exchang-
ers/cooling coils/accumu-
lators on the roof)
1 cylindrical storage tank,
3 meters in diameter
(2) Unidentified Secondary 1 Unit with
Processing 2 columns
1 processing building
1 support building
3 cylindrical storanA tanks,____
H Water Cooling 17 Cooling towers
16 Miscellaneous buildings
27 Cylindrical storace tanks
7 12-meter-diameter
5 9-meter-diameter
9 6-meter-diameter
9 Horizontal storage tanks,
Shipping and Probable 1 Large probable blending/
Blending/Treating treating building with
3 clusters of processing
equipment
1 pipe furnace
1 cooling tower
3 cylindrical storage tanks
2 3-meter-diameter
7 Support buildings (one under
construction)
39 Cylindrical storage tanks
1 Processing building
4 Shipping buildings
1 Loading rack
7 9-meter-diameter
8 3-meter-diameter
4, Horizontal storace tanks
-9-
TOP..SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
25X1
25X1
25X1
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
J Unidentified Secondary 1 Unit with
Processing 6 columns (one very large
diameter)
6 banks of heat exchangers/
cooling coils/accumulators
(one on top of a building)
2 pipe furnaces
1 processing building
2 pump buildings
2 support buildings
2 cylindrical storage tanks
3 meters in diameter
Unidentified Secondary 1 Unit with
Processing 4 columns
2 clusters of processing
equipment
1 bank of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 pump building
1 support building
2 cylindrical storage tanks,
3 meters in diameter
Crude Oil Distillation and
Desalting
(1) Crude Oil Distillation
1 atmospheric column
1 vacuum column
8 other columns (4 are
probably recycle columns)
2 clusters of processing
equipment
3 banks of heat exchangers/
cooling coils/accumulators
3 pipe furnaces
3 processing buildings (one
with 6 horizontal tanks)
1 pump building
8 cylindrical storage tanks
(2) Desalting
-10-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
M Storage and Shipping 2 Loading racks
24 Miscellaneous buildings
247 Cvlindrical StnranP tanks
25X1
1 Unit with
2 dehydrating spheres
4 horizontal desalting drums
5 horizontal settling drums
1 bank of heat exchangers
2 processing buildings
1 pump building
2 cylindrical storage tanks,
3 meters in diameter
29 9-meter-diameter
25X1
25X1
25X1
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
Support and Unidentified
Secondary Processing
(1) Support
(2) Unidentified Secondary
Processing
34 Miscellaneous support buildings
(two with overhead cranes)
1 Unit with
6 columns
1 processing building
2 horizontal storage tanks,
25X1
Thermal Cracking
Possible Hydrotreating and
Unidentified Secondary
Processing
1 Support building
3 Units, each with
5 columns (one for vapor
recovery)
4 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 pump building
1 compressor building
1 support building
2 cylindrical storage tanks,
3 meters in diameter
4 horizontal Stnrana tanks,
1 Possible hydrotreating unit with
7 columns
3 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
1 compressor building
5 processing buildings (one
with 4 horizontal tanks on
the roof)
2 c lindrical sto ks,
25X1
4 horizontal storage tanks
25X1
1 U/I secondary processing unit with
4 columns
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
1 support building
1 U/I secondary processing unit with
4 columns
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
2 support buildings
3 horizontal tanks
-11-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
Lubricating Oil Plant
(1) Solvent Extraction 5 Units, each with
6 columns
2 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 pump building
one unit has a support building
3 cylindrical storage tanks,
3 meters in diameter
4 horizontal storage tanks,
9 meters long
17 Support buildings
3 Cylindrical storage tanks,
6 meters in diameter
(2) Deasphalting
2 Units, each with
6 columns
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
4 cylindrical storage tanks,
3 meters in diameter
3 horizontal storage tanks,
6 meters long
4 Support buildings
(3) Probable Solvent Recovery 1 Unit with
2 columns
2 bank of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
1 support building
2 cylindrical storage tanks,
3 meters in diameter
(4) Dewaxing
3 Units, each with
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
2 processing buildings
1 support building
1 overhead crane
1 cylindrical storage tank,
25X1
(5) Probable Dewaxing 1 Unit with
4 columns
1.cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
3 processing buildings
2 support buildings
1 overhead crane
-12-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
25X1
25X1
Area Functional Description Equipment and Facilities
Q (Cont)
1 Unit with
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
3 processing buildings
5 cylindrical processing/
storage tanks
1 overhead crane
1 cylindrical storage tank,
(6) Clay Treatment
diameter
2 Support buildings
14 Cvlindrical storane tanks,
25X1
1 Loading building with 2 cylindri-
cal storage tanks, 25X1
2 Units, each with
4 columns
14 cylindrical treating tanks
2 pipe furnaces
1 processing building (one has
a clay receiving section)
1 support building
4 cylindrical storage tanks
R Desalting and Storage
(1) Desalting
(2) Storage
4 Units, each with
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
4 horizontal processing/
settling tanks
1 cylindrical storage tank,
3 meters in diameter (one unit
has one additional storage
tank)
25 Miscellaneous buildings
271 Cylindrical storage tanks
20 33-meter-diameter
1 27-meter diameter
36 9-meter-diameter
84 6-meter-diameter
65 Horizontal storage tanks
4 24-mPtPr-Innn
15 12-meter-long
3 Spherical storage tanks,
12 meters in diameter
-13-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
25X1
25X1
25X1
25X1
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
horizontal storage tanks
Area Functional Description Equipment and Facilities
S Crude Oil Distillation 2 Units, each with
1 atmospheric column
1 vacuum column
8 other columns (4 are prob-
ably rerun columns)
2 banks of heat exchangers/
cooling coils/accumulators
1 processing building with 7
horizontal tanks
2 pipe furnaces
1 pump building
one unit has 1 support building
4 cylindrical storage tanks,
3 meters in diameter
1 Unit with
1 atmospheric column
1 vacuum column
3 other columns
3 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
2 cylindrical storage tanks,
3 meters in diameter
1 Unit with
25X1
1 atmospheric column
1 vacuum column
3 other columns
3 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
2 cylindrical storage tanks,
3 meters in diameter
3 horizontal storage tanks
3 Support buildings
13 Cylindrical storage tanks
9 9-meter-diameter
3, Horizontal storaae tanks,
-14-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
1 pipe furnace
1 pump building
1 support building
2 cylindrical storage tanks,
3 meters in diameter
3 horizontal storage tanks
with
atmospheric column
vacuum column
other columns
banks of heat exchangers/
cooling coils/accumulators
25X1
25X1
25X1
pproved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area
Functional Description Equipment and Facilities
Blending, Treating and 1 Blending and treating unit with
Shipping 1 building with 14 batch
agitators/mixers
1 pipe furnace
1 processing building
1 pump building
5 cylindriral ctnrana tanks
1 Packing and snipping building
2 Shipping buildings
2 Support buildings
6 Cylindrical storage tanks
10 Miscellaneous buildings
19 Cylindrical storage tanks
2 12-meter-diameter
6 6-meter-diameter
4 3-meter-diameter
12 Horizontal storage tanks
Unidentified Secondary 1 Unit with
Processing 2 columns
1 cluster of processing equip-
ment
3 banks of heat exchangers/
cooling coils/accumulators
1 processing building
1 pump building
1 cooling tower
2 support buildings
1 Unit with
1 column
3 processing buildings
1 support building
3 horizontal Stnrana tanks,
Water Cooling
9 Cooling towers
43 Miscellaneous buildings
(3 under construction)
11 Water basins
W Possible Blending 1 Unit with
4 columns
1 possible blending building
4 cylindrical blending/storage
tanks
5 horizontal blending/storage
tanks
-15- 25X1
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment.and Facilities
Possible Polymerization and
Extraction
(1) Possible Polymerization
1 Unit with
10 columns (3 are possibly re-
run columns)
5 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 processing building
2 pump/compressor buildings
3 support buildings
4 cylindrical storage tanks
25X1
(2) Possible Extraction 1 Unit with
5 columns
1 cluster of processing equip-
ment
3 banks of heat exchangers/
cooling coils/accumulators
1 compressor building
4 horizontal storage tanks,
6 meters long
Probable Blending
(1) Possible Blending 1 Unit with
5 processing buildings
3 support buildings
7 cylindrical storage tanks
1 6-meter-diameter
6 3-meter-diameter
11 horizontal storage tanks
25X1
10 6-meter-long
(2) Probable Blending 1 Unit with
1 cluster of processing equip-
ment
1 pipe furnace
1 probable blending building
20 cylindrical probable blend-
ing tanks
2 horizontal probable blend-
ing tanks
1 Support building
10 Cylindrical storage tanks
-16-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Table 2. Equipment and Facilities at Kuybyshev Petroleum Refinery No. 2
Southwest Section (Keyed to Figure 6)
Functional Description
Desalting
Administration, Support and
Unidentified Secondary
Processing
(1) Administration and
Support
(2) Unidentified Secondary
Processing
Thermal Cracking and Probable
Thermal Alkylation
(1) Thermal Cracking
Equipment and Facilities
1 Unit with
1 cluster of processing equip-
ment
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
4 cylindrical treating/storage
tanks
4 horizontal treating/storage
tanks
2 Units, each with
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
1 cylindrical treating/storage
tank
5 horizontal treating/storage
tanks
1 Unit with
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
5 horizontal treating/storage
tanks
1 Unit with
1 bank of heat exchangers/
cooling coils/accumulators
1 processing building
1 horizontal treating/storage
tank
2 Support buildings
46 Miscellaneous buildings
1 Unit with
3 columns
1 processing building
2 Units, each with
5 columns (one for vapor re-
covery)
4 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 pump building
1 compressor building
1 support building (one unit
has 2 support buildings)
2 cylindrical storage tanks,
3 meters in diameter
3 horizontal storage tanks,
25X1
-17-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Q
Next 1 Page(s) In Document Denied
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
(2) Probable Thermal
Alkylation
(3) Probable Thermal
Alkylation (Being
Dismantled)
Gas Fractionation and Possible
Hydrotreating
(1) Gas Fractionation
1 Unit with
4 columns
2 clusters of processing equip-
ment
1 pipe furnace
1 pump building
1 support building
2 cylindrical storage tanks,
3 meters in diameter
1 Unit with
6 columns
4 clusters of processing equip-
ment
1 bank of heat exchangers/
cooling coils/accumulators
2 compressor buildings
6 support buildings
2 cylindrical storage tanks,
3 meters in diameter
horizontal storage tanks
(2) Possible Hydrotreating
1 Unit with
7 columns
2 clusters of processing equip-
ment
3 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
1 compressor building
2 support buildings
2 cylindrical storage tanks,
3 meters in diameter
12 horizontal storage tanks,
Catalytic Cracking
3 Thermofor (moving-bed) units,
each with
3 columns (one unit has 4
columns)
1 cluster of processing equip-
ment
1 bank of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
1 blower building with 3
blowers
3 support buildings
6 cylindrical storage tanks
25X1
has an additional horizontal
storage tank, 15 meters long)
~ww wr/wrT 1I Irr
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
EE (Cont) 1 U/I processing unit with
1 cluster of processing equip-
ment
1 compressor building
4 support buildings
1 horizontal storage tank,
25X1
6 Support buildings (one is under
construction)
3 Horizontal storage tanks
FF Alkylation 1 Unit with
5 columns (includes a
debutanizer, deisobutanizer,
depropanizer and a rerun
column)
1 bank of heat exchangers/
cooling coils/.accumulators
1 reactor building with 4
reactors
1 settler and acid recovery
building with 8 horizontal
tanks
1 caustic reclamation building
with 1 horizontal tank
6 cylindrical surge, recycle
and feedstock tanks
1 distillation building
1 pump building
2 horizontal acid tanks
3 mixer/storage tanks
1 support building
3 Support buildings
Unidentified Secondary 1 Unit with
Processing 4 columns
1 cluster of processing equip-
ment
3 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 pump building
1 support building
2 cylindrical storage tanks
1 6-meter-diameter
1 3-meter-diameter
horizontal storage tanks,
1 Unit-with
tih
2 columns
1 cluster of processing equip-
ment
1 compressor building
1 support building
1 horizontal storage tank
2 gasholders,
diameter
-21-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
25X1
25x1
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP ' SECRET 'RUFF
Area Functional Description Equipment and Facilities
HH
Possible Polymerization and
Extraction
(1) Possible Polymerization
2 Units, each with
10 columns (3 are possibly
rerun columns)
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 processing building
2 pump/compressor buildings
1 support building
2 cylindrical storage tanks,
3 meters in diameter
(2) Possible Extraction 2 Units, each with
5 columns
1 cluster of processing equip-
ment
3 banks of heat exchangers/
cooling coils/accumulators
1 compressor building
2 support buildings (one unit
has 3 support buildings)
2 horizontal storage tanks,
6 meters long
2 Support buildings
Unidentified Secondary
Processing
1 Unit with
5 columns
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 processing building
1 pump building
5'cylindrical storage tanks,
3 meters in diameter
2 horizontal storage tanks,
6 meters long
JJ Possible Blending 1 Unit with
1 cluster of processing equip-
ment
1 bank of heat exchangers/
cooling coils/accumulators
2 possible blending buildings
6 cylindrical blending/storage
tanks
6 horizontal blending/storage
tanks
Unidentified Secondary 1 Unit with
Processing 1 large processing building
connected to a smaller build-
ing by a conveyor
2 other processing buildings
1 support building
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
2 6-me er-diame er
7 Support buildings
7 Gasholders
LL Storage 2 Cooling towers
9 Support buildings
78 Cylindrical storage tanks
4 27-meter-diameter
5 12-meter-diameter
4 6-meter-diameter
39 Horizontal storage tanks
2 15-meter-long
21 12-meter-long
8 6-meter-long
2 Spherical storage tanks,
12 meters in diameter
1 Semiburied storage tank
(not measured)
1 Water basin
25X1
MM Crude Oil Distillation 2 Units, each with
1 atmospheric column
1 vacuum column
5 other columns
4 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
2 support buildings
4 cylindrical storage tanks
25X1
4 horizontal storage tanks
3 6-meter-long
1 Unit with
1 processing building
1 small building with a hori-
zontal tank
1 Unit with
1 processing building
5 horizontal storage tanks,
6 meters long
1 Unit with
1 processing building
3 cylindrical storage tanks
25X1
.TOP SECRET RUFF.
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
2 Units, each with
1 atmospheric column
1 vacuum column
3 other columns
4 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building (one unit has
2 pump buildings)
1 support building (one unit
has 2 support buildings)
2 cylindrical storage tanks.
25X1
(one unit has 2 additional
tanks, 3 meters in diameter)
3 horizontal stora e tanks
1 25X1
2 6-meter-long
(one unit has 2 additional
tanks, 6 meters long)
9 Support buildings
5 Cylindrical storage tanks
4 9-meter-diameter
1 6-meter-diameter
NN Storage 6 Miscellaneous buildings
168 Cylindrical storage tanks
3
33
27
45
4z
12 Horizontal storage tanks,
18 meters long .
00 Possible Blending 1 Unit with
1 cluster of processing equip-
ment
11 short processing columns
3 possible blending buildings
6 cylindrical storage/blend-
ing tanks
6 horizontal storage/blend-
ing tanks
1 Unit with
2 short processing columns
1 possible blending building
with 6 horizontal tanks
3 support buildings
4 cylindrical storage/blend-
ing tanks
2 cylindrical storage tanks,
6 meters in diameter
horizontal storage tanks,
25X1
TOP SECRET' RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
QQ
RR Lubricating Oil Plant
(1) Solvent Extraction 3 Units, each with
6 columns
2 banks of heat exchangers/
cooling coils/accumulators
2 pipe furnaces
1 pump building
3 cylindrical storage tanks,
3 meters in diameter
4 horizontal storage tanks,
9 meters long
3 Support buildings
(2) Probable Solvent 1 Unit with
Recovery 3 columns
1 bank of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
1 support building
3 cylindrical storage tanks,
3 meters in diameter
3 Support buildings
2 Cylindrical storage tanks,
3 meters in diameter
2 Horizontal storage tanks,
(3) Deasphalting 2 Units, each with
6 columns
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
5 cylindrical storage tanks
(one unit has 6), 3 meters
long
3 horizontal storage tanks,
6 meters long
-25-
TOP SECRET RUFF
Unidentified Secondary 1 Unit with
Processing 2 columns
2 banks of heat exchangers/
cooling coils/accumulators
1 pipe furnace
1 pump building
1 support building
2 cylindrical storage tanks,
3 meters in diameter
3 horizontal storage tanks,
6 meters long
Unidentified Secondary 1 Unit with
Processing 3 clusters of processing equip-
ment
1 bank of heat exchangers/
cooling coils/accumulators
4 horizontal processing tanks
1 pipe furnace
1 pump building
1 support building
7 cylindrical storage tanks
1 6-meter-diameter
6 3-meter-diameter
1 horizontal storage tank,
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
RR (Cont) (4) Clay Treatment 1 Unit with
4 columns
13 cylindrical treating tanks
2 pipe furnaces
1 processing building with
clay receiving section
2 support buildings
2 cylindrical storage tanks,
3 meters in diameter
5 Support buildings
(5) Dewaxing
2 Units, each with
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
2 processing buildings
1 support building
1 overhead crane
1 c
25X1
5 Miscellaneous buildings
(6) Probable Dewaxing 1 Unit with
1 cluster of processing equip-
ment
2 banks of heat exchangers/
cooling coils/accumulators
4 processing buildings
7 cylindrical processing/stor-
age tanks
1 shipping building
1 overhead crane
1 cylindrical storage tank,
Blending, Treating and 1 Blending and treating unit with
Shipping 1 building with 11 batch
agitators/mixers
1 pipe furnace
1 processing building
1 pump building
2 support buildings
4 cylindrical storage tanks
25X1
Storage, Support and 4 Loading racks
Shipping 47 Miscellaneous buildings
24 Hori7nn+nl 4-11-
2
1
-26-
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
25X1
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
TOP SECRET RUFF
Area Functional Description Equipment and Facilities
UU Shipping and Probable 1 Probable blending and treating
Blending and Treating unit with
1 processing building
7 probable blending and treat-
ing tanks
34 Miscellaneous buildings (includes
several processing and probable
blending and treating buildings)
5 Cylindrical processing/storage
tanks
9 Horizontal processing/storage
tanks
VV Water Treatment and Cooling 9 Cooling towers (one is under
construction)
32 Miscellaneous buildings (3 are
under construction)
12 Cylindrical storage tanks
5 15-meter-diameter
2 12-meter-diameter
5 25X1
35 Water basins
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0
1
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 25X1
TOP SECRET RUFF -1 25Ai
Map
8th RTS. US Air Target Chart, Series 200, Sheet -
November 1967, Scale 1:200,000 (SECRET
1. Army. Report No. ID 2191426, November 1961 (CONFIDENTIAL)
Requirement
COMIREX N02
Support Number 429222
25X1
25X1
TOP SECRET RUFF
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0