PLEVEN PETROLEUM REFINERY YASEN YASEN, BULGARIA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000300010058-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
13
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 2, 2008
Sequence Number: 
58
Case Number: 
Publication Date: 
January 1, 1972
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000300010058-0.pdf380.25 KB
Body: 
Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Top Secret Industrial Facilities (Non-Military) DIRECTORATE OF INTELLIGENCE Basic Imagery Interpretation Report Pleven Petroleum Refinery Yasen Yasen, Bulgaria Top Secret RCS I-Vnni 7 79 25X1 JANUARY 1972 COPY 118 PAGES 1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service Pleven Petroleum Refinery Yasen MAP REFERENCE ACIC. USATC, Series 200, Sheet 0322-4HL, 3rd ed, Feb 64, Scale 1:200,000 (SECRET) NEGATION DATE (If required) 25X1 Pleven Petroleum Refinery Yasen is a small refinery which is part of the petroleum and petrochemical complex being constructed in the Pleven area. The major production components of the refinery are a crude oil distillation unit and a lubricating oil plant. The primary products are lubricating oils, heavy fuels, and petrochemical feedstocks. The refinery has not been seen operating on photography. Construct.ion began between February 1967 and March 1968. By June 1970, the crude oil distillation unit was complete and the refinery appeared capable of partial operation, but no indicators of operation were observed., On the latest coverage in June 1971, all of the major processing units appeared complete,. tank cars were present, and the flare tower was operating.' The refinery appeared capable of full operation, but it probably was not operating at that time based on the absence of smoke or vapors from the processing equipment, cooling towers, and power plant. This report contains a line drawing, a photograph of the refinery, a chart showing the construction chronology of individual units, mensuration of storage tanks, and a discussion of construction and operational status of facilities. TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 RCS - 13 0017/72 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 TOP SECRET RUFF e g r 0 r EAST t\ POLAND BERLINI -?GERMANY WARSAW a ~ Dresden* FEDERAL REPUBLIC CZECHOSLOVAKIA OF GERMANY ALBANIA' ROMANIA -2- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 YUGOSLAVIA Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 TOP SECRET RUFF INTRODUCTION Pleven Petroleum Refinery Yasen is located 1 nautical mile (nm) south of Yasen and 4 nm west of Pleven (see Figure 1). It was designed and equipped by the Soviets. The refinery is part of a complex of petroleum and petrochemical industries under construction which reportedly will be Bulgaria's largest oil refining center when completed. 1/ Crude oil to charge the refinery reportedly comes from the new Dolni Dubnik oil field located west of the refinery. Electric power is supplied by the collocated heat and thermal power plant (no BE number). Physical Features The refinery occupies an irregular shaped area about 5,600 by 4,300 feet containing about 570 acres (see Figures 2 and 3). Rail service is provided by a spur from the rail line between Pleven and Cherven Bryag. Operational Functions The primary products of the refinery are lubricating oils, heavy fuels, and petrochemical feedstocks. The major production components are a crude oil distillation unit and a lubricating oil plant. In addition, a small unidentified secondary processing unit (Area U) is present. The crude oil distillation unit is capable of producing lubricating oil feedstocks, diesel and fuel oils, kerosene, straight-run gasoline, and gaseous hydrocarbons. The lighter fractions (straight-run gasoline and gaseous hydrocarbons) are usually further refined in secondary processing units if they are to be used as fuels. Since these secondary processing units are not present, it is assumed that the lighter fractions are shipped from the refinery as petrochemical feedstocks. The kerosene and diesel and fuel oils from this unit can be used with a minimum of additional processing. The lubricating oil plant is capable of producing a wide range of lubricating oils as well as waxes and asphaltic materials from the feedstocks produced in the crude oil distillation unit. The plant contains a probable deasphalting unit, a solvent extraction unit, a dewaxing unit, a clay treatment unit, and a possible hydrotreating unit. The solvent extraction unit (Area 0) is larger and more complex than standard Soviet units and may have some additional processing capability. The possible hydrotreating unit (Area J) is considered part of the lubricating oil plant due to its location, but it could also treat kerosene or heavy fuels. Construction and Operational Status Construction of the refinery began between February 1967 and March 1968. On the March 1968 photography, only ground scarring in the storage and processing areas was observed. By September 1969, an unidentified secondary processing unit, two support areas, and a storage area were complete, and the crude oil distillation unit was very near completion. The refinery reportedly began production in December 1969. 2/ However, it has not been seen operating on photography. By June 1970, the crude oil disti?Ilation unit, a storage area, and the water treatment facility were complete. The refinery appeared capable of partial operation, but no indicators of operation were observed. On the latest coverage in June 1971, all of the major processing units appeared complete. Only a probable secondary processing unit and two storage areas remained under construction. The flare tower was burning and rail tank cars were present in Shipping Area E. The refinery appeared capable of full operation, but it probably was not operating based on the absence of smoke or vapors from the processing equipment, cooling towers, and power plant. It may be that the flare tower was burning waste gas from the adjacent oil field and that the rail cars were present for shipping out crude oil. It is also possible that the refinery had been operating prior to the date of photography. Figure 4 shows the construction chronology of the individual units. -3- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Q Next 1 Page(s) In Document Denied Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 A WATER TREATMENT B STORAGE C STORAGE D SUPPORT E SHIPPING [ F STORAGE G SHIPPING AND STORAGE C H WATER COOLING AND TREATMENT I STORAGE J POSSIBLE HYDROTREATING K SHIPPING AND STORAGE L CRUDE OIL DISTILLATION M PROBABLE DEASPHALTING N CLAY TREATMENT 1 - JL- 0 SOLVENT EXTRACTION p PROBABLE SECONDARY PROCESSING UNIT U/C Q DEWAXING R SUPPORT S ADMINISTRATION AND SUPPORT T SUPPORT U U/I SECONDARY PROCESSING LEGEND UNDER CONSTRUCTION COMPLETE Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 25X1 TOP SECRET RUFF Facilities and Equipment Table 1 lists the functional areas, facilities, and equipment within the refinery. Measurements are given to the nearest half-meter. Table 1. Equipment and Facilities at the Pleven Petroleum Refinery Yasen (Keyed to Figure 3) Area Functional Description Equipment and Facilities A Water Treatment 1 Treating building 2 Pump buildings 6 Support buildings 2 Cylindrical storage tanks, 12 meters in diameter 3 Water treatment basins 10 Water treatment/storage basins B Storage 5 Support buildings 7 Cylindrical storage tanks under construction, each probably 45 meters in diameter C Storage D Support E Shipping F Storage 1 Shipping building/warehouse 1 Support building 2 Loading/unloading racks, each covered by a shed roof 4 Spherical storage tanks, "" 1_~ -ma ar- iamA ar 4 9-meter-diameter 12 12-meter-diameter 6 25X1 2 2 Pump buildings 5 Other buildings 57 Cylindrical storage tanks 6 24-meter-diameter 4 25X1 r 25X1 emi urie tanks (not measured) G Shipping and Storage 2 Pump; buildings 2 Shipping buildings 3 Other buildings 84 Cylindrical storage tanks 17 25X1 8 15 6-meter-diameter 36 25X1 4 3-meter-diameter -7- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities H Water Cooling and Treatment 2 Pump buildings 1 Water treatment building 4 Cooling towers 3 with 3 cells 1 with 2 cells 2 Semiburied tanks (not measured) 3 Water treatment basins Storage 3 Pump buildings 4 Other buildings 25 Cylindrical storage tanks 3 25X1 3 25X1 11 25X1 3 Horizontal storage tanks, 12 meters long 1 Semiburied cylindrical tank (not measured) J Possible Hydrotreating 1 Unit with 2 columns 1 bank of processing equipment 1 pipe furnace 1.pump building K Shipping and Storage 1 Bank of processing equipment 2 Pump buildings 3 Shipping buildings 4 Other buildings 49 Cylindrical storage tanks 6 12-meter-diameter 10 25X1 3 9-meter-diameter 16 25X1 4 6-meter-diameter 1O _____________ 25X1 13 Horizontal storage tanks 7 15-meter-long 6 12-meter-long 1 Cylindrical storage tank under construction L Crude Oil Distillation 1 Unit with 1 atmospheric column 1 vacuum column 6 other columns 2 possible desalting drums 1 bank of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 processing building 2 pump buildings 1 control house 1 Flare tower -8- TOP -SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities M Probable Deasphalting N Clay Treatment 0 Solvent Extraction 1 Unit with 7 columns 1 pipe furnace 1 processing building 1 pump building 2 Support buildings 5 Horizontal storage tanks 4 18-meter-long 1 12-meter-long 1 Unit with 1 bank of processing equipment containing probable treating towers 1 bank of batch agitators 1 bank of processing equipment 1 pipe furnace 1 filter building 1 clay receiving building 4 Semib'uried cylindrical tanks (not measured) 3 1 9-meter-diameter 3 tanks 6 pipe furnaces 1 pump building 1 s'emiburied tank 1 Pump building 2 Other buildings 17 Cylindrical storage tanks 1 Unit with 3 columns 3 banks of processing equipment, each containing columns 2 banks of heat exchangers/ cooling coils/accumulators 4 possible solvent storage P Probable Secondary Processing Facilities not listed. Unit U/C Q Dewaxing 1 Unit with 2 solvent regeneration sections, each with 9 columns and 2 banks of processing equipment 2 banks of processing equipment, each with an attached bank of crystallizer drums 1 chiller building 2 filter buildings 1 pump/processing building -9- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 2 25X1 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 TOP SECRET RUFF Area Func tional Description Equipment and Facilities Q (Cont) 1 Pump building 1 Support building 13 Cylindrical storage tanks, 12 meters in diameter 1 Semiburied cylindrical tank R Support 11 Support buildings 2 Storage buildings S Administration and Support 2 Administration buildings 1 Possible laboratory 11 Support buildings T Support 2 Vehicle sheds 4 Support buildings 2 Horizontal tanks, 15 meters long U Unidentified Secondary Processing 1 Unit with 1 column 2 horizontal processing tanks 1 bank of processing equipment 1 pump/processing building 3 Support buildings 3 Cylindrical storage tanks, 15 meters in diameter 1 Horizontal storage tank, 12 meters long -10- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 25X1 ur JtLKt ll Kurr Map ACIC. US Air Target Chart, Series 200, Sheet 0322-4HL, 3rd edition, February 1964, Scale 1:200,000 (SECRET) 1. "The Pleven Petrochemical Works," Economic News of Bulgaria, September 1966 (UNCLASSIFIED) 2. CIA. CRS, Firm No. K300233, FBIS 69 L 5613, December 1969 (OFFICIAL USE ONLY) Requirement COMIREX N06 Support Number 422992 -11- TOP SECRET RUFF Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0 Top Secret Top Secret Approved For Release 2008/06/02 : CIA-RDP79T00909A000300010058-0