(SANITIZED)MISSIONS 2020, 2021

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89B00709R000500950003-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 17, 2011
Sequence Number: 
3
Case Number: 
Publication Date: 
July 11, 1956
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP89B00709R000500950003-7.pdf102.05 KB
Body: 
Sanitized Copy Approved for Release 2011/02/22 : CIA-RDP89B00709R000500950003-7 VIA AIR (Spec* Air or Sea Pouch) TO HEADQUARTERS BU== 1 GIIIfAL Operations per DISPATCH NO. .Z-:-- SECRET CLASSIIrICATION DATS 11 MY 56 Missions 2020, 2021 Mission 2020 was flown by on 9 duly 19 Article 25X1 Special equipment consisted of the and 1138 Band Radar. Duration oi25X1 ht was six hours and thirty - ff was made on scheduls,-k 4swr the delay in receipt report continues to pose a 25X1 serious problem. Se message 317. 25X1 Ne,,other problems were encountered in the launching of the mission. reported satisfactory operation of the camera equipment. -Hovov*r,25X1 time that a can has broken in operation of these shutters. The shutter will be returned to the factory for inspection. The vertical shutter either lost a turn or was incorrectly not on pre-flight. Tlis'shutter has been removed from service until a thorough maintenance check can be made. To preclude recurrence of shutter failure, action has been taken to establish a procedure requiring periodic checks of the shutter for noticeable cracks. post flight inspection revealed malfunction of the genera equipment did occur. The right oblique shutter can broke. No apparent reason expect possible metal fatigue or a defective piece of metal. This is the first 48 miles west of point Alfa. Course plotted for 112 mil east of point Charlie when it became untrackable. Track again picked ZO A ailwt-A&st of point Golf. Course was made good until track unreadable &t 25X1 eighteen miles south of course. Track in d to paral e course for fAfty miles, crossed north of course "7 then crossing course 25X1 southeast of point Lima. Flight was continued south of course to 5034N 0707E. Plotting time for this mission was 3 hours. No serious nroblm were encountered in the intelligence briefing or de-briefing of De-briefing fords provided by 'ro3ect Headquarters 25X1 are considered adequate for this mission. which time track was thirty six miles north of course. Ern rac wa Eight hundred feet of tracker film was exposed on this mission. The- flight track was not plottable in the 70MM film until point at 25X1 - VIA 51-28A S E C R E T CLASSIFICATION TS NR. 155330 Page 1 of pages Copy of 2 copies 25X1 Sanitized Copy Approved for Release 2011/02/22 : CIA-RDP89B00709R000500950003-7 Sanitized Copy Approved for Release 2011/02/22 : CIA-RDP89B00709R000500950003-7 No malfunctions were encountered in the electronics equipment. Str,ng lock--on type signals were received about one hour and thirty minutes after take-off. These signals are typical of X Band Airborne Radar. Reference is made to paragraph 9F of the Mission Weather Report. It is believed that the use of the six p for reporting clouds from tracking film is impractical and serves no useful purpose. The cloud distribution and patterns fluctuates considerably from point to point, often in a short distance and cannot be accurately reported unless a reading is taken each 10 to 20 miles along the track. This would be so time consuming as to be impractical. Further, the film will be available at Project Headquarters for micro--meterorology research at a future date. Request permission to report clouds by category and type abbreviated from one significant change to another along the track using latitude and longitude or check point. For example, from 6021 to C Cat 3, CI AC, C to 6023 CAT 4 thick Ci, from 6023 to 5819 Cat 1. See remarks Sanitized Copy Approved for Release 2011/02/22 : CIA-RDP89B00709R000500950003-7