NEW HEADQUARTERS BUILDING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00244R000500800006-8
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
8
Document Creation Date:
December 22, 2016
Document Release Date:
March 13, 2009
Sequence Number:
6
Case Number:
Publication Date:
November 3, 1983
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP89-00244R000500800006-8.pdf | 404.36 KB |
Body:
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
DD/A Registry
ROUTING AND RECORD SHEET
SUBJECT: (Optional)
New Headquarters Building
FROM
EXTENSION
NO.
ie ew Building ode t ffice
4E50 Hqs
DATE
2 NOV 1983
TO: (Officer designation, room number, and
building)
DATE
OFFICER'S
COMMENTS (Number each comment to show from whom
RECEIVED
FORWARDED
INITIALS
to whom. Draw a line across column after each comment.)
D/A
7D24 Hqs
2.
1983
3.
N
o iga3
7~
4. DDA REGISTRY
7D18 Hqs
X11
83
L~r~
4. Please return to OL/NBPO
for display when signed.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
FORM 61 O USE PREVIOUS
1-79 EDITIONS
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
AD*ISTRATIVE - INTERNAL USE OLY
3 NOV 1983
STAT
i
MEMORANDUM FOR: All Employees
FROM: Harry E. Fitzwater
Deputy Director for Administration
SUBJECT: New Headquarters Building
1. The renderings of the new building shown here reflect the
current design concepts as we move into the final design stages.
The building facade will be a tinted glass wall that is detailed
in a pattern that will echo the patterns of the existing
building. This produces a feeling of compatibility even though
the two structures are significantly different in form and
material. The base of the new building is composed of precast
concrete panels selected to closely match the base of the
existing building so that there is a strong unifying element
common to both buildings.
2. Entering the building from the west, employees will
transit a skylit entry hall that terminates on the fourth level
of the building at the atrium facing the courtyard. At this
level, there will be an impressive view of the courtyard and
existing building. The ground level of the atrium will look out
into the courtyard. This level is being designed to contain
expanded employee services such as the EAA store, Credit Union,
and Insurance Branch.
3. Additional food service area will be provided by
expanding within the existing building around the existing
kitchen into areas vacated by components such as the Credit
Union. Tentative plans are to add variety as well as space in
the addition so that features such as the Rendevous Room can be
re-created.
4. The current schedule calls for start of construction in
the spring of 1984, rather than August as previously stated.
This schedule should result in beneficial occupancy beginning in
the summer of 1987.
Ha E. Fi water
,ly
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
ADMINISTRATIVE - INTERNAL USE ONLY
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
AD?ISTRATIVE - INTERNAL USE ?LY
SUBJECT: New Headquarter Building
Distribution:
0 & 1 - DD/A
1 - D/OL
1 - OL/NBPO
STAT OL/NBP'
(02 Nov 83)
ADMINISTRATIVE - INTERNAL USE ONLY
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
Paul
Pam
Bob
Gary
Gil
concrete panelss.selected to closely match the base of the
existing building. so that there is a strong unifying element
Deputy Director. for Administration
1..'The renderings of the new building shown here reflect the
current:;design.concepts as we move into the final design stages.,
The building. facade will be a tinted glass wall that is detailed
in a pattern that will echo the patterns of the existing.
building: This produces a feeling. of'compatibility.even.though
the two's;tructures'are significantly different in form and
material,',, The' base .of the new building is composed of precast
AD]SISTRATIVE - INTERNAL USE 4VY
FROM.:. Harry E. Fitzwater
~-" 2.`Entering the building from the west, employees will.
tra-ns-it-a skylit entry hall that terminates on the fourth level
of the building at the.atrium facing the courtyard. At this.
level, there will be a'n impressive view of the courtyard and
existin ', buildin .The ,ground level of the atrium will look out
into the courtyard. :.This level is being designed to contain-.
expanded employee services such as the EAA store, Credit Union,.
and Insurance~,Branch
3. A ood -service area will be provided by
cc: expanding within the-existing building around the existing
'kitchen into.ar.eas vacated by components such.as the Credit
Union.. Tentative plans are to add variety as well as space in
Rprward - Toss-.the addition Po-,that -features such as the Rendevous Room can be
re-created.
. Fitz ter
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
4.. The current schedule calls for start of construction in
the spring.of 1984,. rather than August as previously stated.
--This schedule should result in beneficial occupancy beginning in
the summer of 1987
common to both'buildings.
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
1 - b/OL
OL/NBPO
'STAT.' OL/NBP
ISTRATIVE --INTERNAL USE W LY. ;:: , _;', ;'
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
Distribution:
0 & 1 - DD/A
STAT
STAT
STAT
STAT
STAT
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
? 49
ROUTING AND RECORD SHEET
SUBJECT: (Optional) ~' t{A~f s$%?p
New Building Exhibit
FRO
EXTENSION
NO.
Chief, New Building Project Office, OL
DATE 2 OCT 1983
4E50 Has
TO: (Officer designation, room number, and
building)
DATE
OFFICER'S
COMMENTS (Number each comment to show from whom
RECEIV
FORWARDED
INITIALS
to whom. Draw a line across column after each comment.)
1.
DD/A
/
7 83
1. You have recently requested
that em
lo
ee exhibits a
ain be
7D24 Has
p
y
g
set up at cafeteria entrances
2.
8
CT 198
~.
_
to display the latest renderings
`
of the new building. Photo-
graphic copies of the renderings
3?
are now available to do this.
The last exhibit contained a
4
memorandum from you to the
employees. On the assumption
that you would like to do so
5
again, attached is a draft for
your consideration.
We will mount the exhibits as
6.
soon as you give the word.
7.
8.
Att
9.
7
10. e//V'6'0 % DL.
01
Olt
~.lLSil,.c~
1
QQ
/}L
~
A
a
L
/% ~
O G
L
13.
,GG ~ 76 c` e' i1re e.Ta:txL
14.
15.
FORM 61 O USE PRE PREVIOUS
I-79
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 DRAFT
AD0ISTRATIVE - INTERNAL USE aY 2 6 OCT 1983
MEMORANDUM FOR: All Employees
FROM: Harry E. Fitzwater
Deputy Director for Administration
SUBJECT: New Headquarters Building
1. The renderings of the new building shown here reflect the
current design concepts as we move into the final design stages.
The building facade will be a tinted glass wall that is detailed
in a pattern that will echo the patterns of the existing
building. This produces a feeling of compatibility even though
the two structures are significantly different in form and
material. The base of the new building is composed of precast
concrete panels selected to closely match the base of the
existing building so that there is a strong unifying element
common to both buildings.
2. Entering the building from the west, employees will
transit a skylit entry hall that terminates on the fourth level
of the building at the atrium facing the courtyard. At this
level, there will be an impressive view of the courtyard and
existing building. The ground level of the atrium will look out
into the courtyard. This level is being designed to contain
expanded employee services such as the EAA store, Credit Union,
and Insurance Branch.
3. Additional food service area will be provided by
expanding within the existing building around the existing
ADMINISTRATIVE - INTERNAL USE ONLY
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8
AD 1b'1'KATiVE - 1N'1'tKNAL Ub JOY
kitchen into areas vacated by components such as the Credit
Union. Tentative plans are to add variety as well as space in
the addition so that features such as the Rendevous Room can be
re-created.
4. The current schedule calls for start of construction in
the spring of 1984, rather than August as previously stated.
This schedule should result in beneficial occupancy beginning in
the summer of 1987.
Harry E. Fitzwater
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8