NEW HEADQUARTERS BUILDING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00244R000500800006-8
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
8
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 13, 2009
Sequence Number: 
6
Case Number: 
Publication Date: 
November 3, 1983
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP89-00244R000500800006-8.pdf404.36 KB
Body: 
Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 DD/A Registry ROUTING AND RECORD SHEET SUBJECT: (Optional) New Headquarters Building FROM EXTENSION NO. ie ew Building ode t ffice 4E50 Hqs DATE 2 NOV 1983 TO: (Officer designation, room number, and building) DATE OFFICER'S COMMENTS (Number each comment to show from whom RECEIVED FORWARDED INITIALS to whom. Draw a line across column after each comment.) D/A 7D24 Hqs 2. 1983 3. N o iga3 7~ 4. DDA REGISTRY 7D18 Hqs X11 83 L~r~ 4. Please return to OL/NBPO for display when signed. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. FORM 61 O USE PREVIOUS 1-79 EDITIONS Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 AD*ISTRATIVE - INTERNAL USE OLY 3 NOV 1983 STAT i MEMORANDUM FOR: All Employees FROM: Harry E. Fitzwater Deputy Director for Administration SUBJECT: New Headquarters Building 1. The renderings of the new building shown here reflect the current design concepts as we move into the final design stages. The building facade will be a tinted glass wall that is detailed in a pattern that will echo the patterns of the existing building. This produces a feeling of compatibility even though the two structures are significantly different in form and material. The base of the new building is composed of precast concrete panels selected to closely match the base of the existing building so that there is a strong unifying element common to both buildings. 2. Entering the building from the west, employees will transit a skylit entry hall that terminates on the fourth level of the building at the atrium facing the courtyard. At this level, there will be an impressive view of the courtyard and existing building. The ground level of the atrium will look out into the courtyard. This level is being designed to contain expanded employee services such as the EAA store, Credit Union, and Insurance Branch. 3. Additional food service area will be provided by expanding within the existing building around the existing kitchen into areas vacated by components such as the Credit Union. Tentative plans are to add variety as well as space in the addition so that features such as the Rendevous Room can be re-created. 4. The current schedule calls for start of construction in the spring of 1984, rather than August as previously stated. This schedule should result in beneficial occupancy beginning in the summer of 1987. Ha E. Fi water ,ly Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 ADMINISTRATIVE - INTERNAL USE ONLY Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 AD?ISTRATIVE - INTERNAL USE ?LY SUBJECT: New Headquarter Building Distribution: 0 & 1 - DD/A 1 - D/OL 1 - OL/NBPO STAT OL/NBP' (02 Nov 83) ADMINISTRATIVE - INTERNAL USE ONLY Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 Paul Pam Bob Gary Gil concrete panelss.selected to closely match the base of the existing building. so that there is a strong unifying element Deputy Director. for Administration 1..'The renderings of the new building shown here reflect the current:;design.concepts as we move into the final design stages., The building. facade will be a tinted glass wall that is detailed in a pattern that will echo the patterns of the existing. building: This produces a feeling. of'compatibility.even.though the two's;tructures'are significantly different in form and material,',, The' base .of the new building is composed of precast AD]SISTRATIVE - INTERNAL USE 4VY FROM.:. Harry E. Fitzwater ~-" 2.`Entering the building from the west, employees will. tra-ns-it-a skylit entry hall that terminates on the fourth level of the building at the.atrium facing the courtyard. At this. level, there will be a'n impressive view of the courtyard and existin ', buildin .The ,ground level of the atrium will look out into the courtyard. :.This level is being designed to contain-. expanded employee services such as the EAA store, Credit Union,. and Insurance~,Branch 3. A ood -service area will be provided by cc: expanding within the-existing building around the existing 'kitchen into.ar.eas vacated by components such.as the Credit Union.. Tentative plans are to add variety as well as space in Rprward - Toss-.the addition Po-,that -features such as the Rendevous Room can be re-created. . Fitz ter Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 4.. The current schedule calls for start of construction in the spring.of 1984,. rather than August as previously stated. --This schedule should result in beneficial occupancy beginning in the summer of 1987 common to both'buildings. Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 1 - b/OL OL/NBPO 'STAT.' OL/NBP ISTRATIVE --INTERNAL USE W LY. ;:: , _;', ;' Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 Distribution: 0 & 1 - DD/A STAT STAT STAT STAT STAT Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 ? 49 ROUTING AND RECORD SHEET SUBJECT: (Optional) ~' t{A~f s$%?p New Building Exhibit FRO EXTENSION NO. Chief, New Building Project Office, OL DATE 2 OCT 1983 4E50 Has TO: (Officer designation, room number, and building) DATE OFFICER'S COMMENTS (Number each comment to show from whom RECEIV FORWARDED INITIALS to whom. Draw a line across column after each comment.) 1. DD/A / 7 83 1. You have recently requested that em lo ee exhibits a ain be 7D24 Has p y g set up at cafeteria entrances 2. 8 CT 198 ~. _ to display the latest renderings ` of the new building. Photo- graphic copies of the renderings 3? are now available to do this. The last exhibit contained a 4 memorandum from you to the employees. On the assumption that you would like to do so 5 again, attached is a draft for your consideration. We will mount the exhibits as 6. soon as you give the word. 7. 8. Att 9. 7 10. e//V'6'0 % DL. 01 Olt ~.lLSil,.c~ 1 QQ /}L ~ A a L /% ~ O G L 13. ,GG ~ 76 c` e' i1re e.Ta:txL 14. 15. FORM 61 O USE PRE PREVIOUS I-79 Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 DRAFT AD0ISTRATIVE - INTERNAL USE aY 2 6 OCT 1983 MEMORANDUM FOR: All Employees FROM: Harry E. Fitzwater Deputy Director for Administration SUBJECT: New Headquarters Building 1. The renderings of the new building shown here reflect the current design concepts as we move into the final design stages. The building facade will be a tinted glass wall that is detailed in a pattern that will echo the patterns of the existing building. This produces a feeling of compatibility even though the two structures are significantly different in form and material. The base of the new building is composed of precast concrete panels selected to closely match the base of the existing building so that there is a strong unifying element common to both buildings. 2. Entering the building from the west, employees will transit a skylit entry hall that terminates on the fourth level of the building at the atrium facing the courtyard. At this level, there will be an impressive view of the courtyard and existing building. The ground level of the atrium will look out into the courtyard. This level is being designed to contain expanded employee services such as the EAA store, Credit Union, and Insurance Branch. 3. Additional food service area will be provided by expanding within the existing building around the existing ADMINISTRATIVE - INTERNAL USE ONLY Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8 AD 1b'1'KATiVE - 1N'1'tKNAL Ub JOY kitchen into areas vacated by components such as the Credit Union. Tentative plans are to add variety as well as space in the addition so that features such as the Rendevous Room can be re-created. 4. The current schedule calls for start of construction in the spring of 1984, rather than August as previously stated. This schedule should result in beneficial occupancy beginning in the summer of 1987. Harry E. Fitzwater Approved For Release 2009/03/13: CIA-RDP89-00244R000500800006-8