1. HIGHWAY RECONSTRUCTION IN MOSCOW OBLAST 2. ATOMIC POWER PLANT NEAR BALABANOVO

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A053400400001-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 21, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
April 15, 1960
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A053400400001-4.pdf150.83 KB
Body: 
Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246A053400400001-4 INFORMATION REPORT INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.B.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person L prohibited by law. COUNTRY USSR (Moscow Oblast) SUBJECT 1. Highway Reconstruction in Moscow Oblast 2. Atomic Power Plant near Balabanovo DATE OF INFO. PLACE & DATE ACQ. REPORT DATE DISTR. /S fgpr ~ / 9 G a NO. PAGES REFERENCES SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. report, including two sketches C- 0-N-F- I-D-E-N-T- I-A-L STATE X ARMY X I NAVY I )I AIR 1 NSA (Note: Washington distribution indicated by "X"; Field distribution by "#".) X FBI NIC X I N FORMATION REPORT I N FORMATION REPORT Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246A053400400001-4 Sanitized Copy Approved for Release 2010/10/21 : CIA-RDP80T00246A053400400001-4 ')OX1 -HUM COUNTRY: USSR (Moscow Oblast) 5uB~b- I: Moscow Highway Construction PLACE ACQUIRED REPORT DATE OF II4FO: December 1955-December 1956 DATE ACQUIfMD: 4 December 1959 DATE OF REP(R T : MOSCOW HIGHWAY CONSTRUCTION OFFICE 1. The Moscow Highway Construction Office, was located at No. 4 Podkopayevskiy pereulok, Krasnogvardeyskiy rayon, Moscow. This office made land surveys and construction plans for highways. Orders were received from the Ministry of Automobile Transport and Highways via an unknown agency. The plans were sent to various unknown centers charged with executing the work within the Moscow Oblast. Construction Tasks and Procedures plans to widen and pave an approximately seven-kilometer stretch of road connecting the Moscow Maloyaroslavets (N 55-01, E 36-27) highway and the Moscow-Kiev highway (refer to page 3 , overlay of Moscow Oblast). The junction point of the connecting road with the former highway was unknown; but with the latter, the junction was at kilometer mark 91. Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246AO53400400001-4 rr+~w -HUM Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246A053400400001-4i CONFIDENTIAL The road was to be widened about five meters and asphalt paved. The connectin;; road joined the main Moscow-Kiev highway at the small village of Balabanovo. This narrow stretch of road was being improved to accommodate truck traffic. There was an atomic enerLW plant with guarded entrances between the two main highways and about three kilometers north of the stretch of road under reconstruc- a proj See ;verlay, page 3) 50X1-HUM ect to widen and asphalt pave an approximately 20-kilometer stretch of road which branched off from the Moscow- Leningrad. highway at kilometer mark 110 (refer to page 4 , overlay of Vyazma). It began in the village of Mozhalsk (N 55-30, E 36-02) and ended in the village 50X1-HUM of Borodino (N 55-55, E 37-4-0). This narrow road in poor condition was to be improved to accommodate the increase in traffic. 5. The asphalt mixture used in the reconstruction of these roads mixture which was about 75 percent sand, 25 percent pea grave one -Dart Ditch was added for every 121 parts of sand mixture. consisted of a , to which about requirements for road widening were set. The established widths were approximately 11 meters for primary roads, nine for secondary roads, and seven meters for third class roads. All main highways were of the primary class. 6. These roads did not serve plants or military bases. They were notconstructed for the army and they did not lead to any restricted areas. Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246AO53400400001-4 Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246A053400400001-4 Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246AO53400400001-4 Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246AO53400400001-4 Overlay of Vyazma NN 36-3 N 501 61 4 MOZHAYSK Sanitized Copy Approved for Release 2010/10/21: CIA-RDP80T00246AO53400400001-4