HARBOR INSTALLATIONS IN DANZIG

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R005800230005-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 15, 2016
Document Release Date: 
April 21, 2003
Sequence Number: 
5
Case Number: 
Publication Date: 
September 14, 1950
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R005800230005-2.pdf173 KB
Body: 
Approved For Release 2003/08/05 : CIA-RDP82-00457R005800230005-2 25X1 CLASSIFICATION 25X1 CENTRAL INTELLIGENCE AGENCY REPORT NO. INFORMATION REPORT CD NO., COUNTRY Poland SUBJECT Harbor Installations in Danzig 25X1 PLACE ACQUIRED DATE OF INFO. TAfJR BERT OOKTA1t18 iIICDEOATfOR AmCTt0?TEE RATIOEM. DEPWJRE op THE URETER sTATES WITHI9 THE am m as THE ESPIOiSAOE ACT 30 E,.e. C.. SY ARO 82. As AI ubEC. HTi TEAESJ%$= OR THE REVELATION Ir as OORTEIITS is RET REHIRE TO AO URAUTROMEEb 3613011 IS PR0. XW= C UN. APEOVCCTSO3 Of W M fOI H W PEOSMHITED. DATE DISTR. 14 September 1950 NO. OF PAGES 2 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION 25X1 25X1 25X1 I, The Coal Harbor of yeichselmuonde (Ilason Gorniczy) has three in- stall Eons for handling ore (V zvorladebruockon) which are fitted with three mobile ore scales with a capacity of 10 tons each, A railroad car-shunting platform for switching the loaded cars from one track to another is north of the ore-handling installations. There are 14 cranes, Light of them have a lift capacity of T tons each, and four a lift capacitiy of 5 tons each. Four of the night 7-ton cranes were erected in late 1949. Two other 5 -ton cranes arc on the eastern quay near the coal elevators. Three coal elevators, each with a capacity of 5,000 tons per 24 hours, are on the eastern quay. 2. The harbor area has an c ten live and efficient track ayctem. 3-:Itching operations with powerful German loconotivos of a Tsar-tine model wore observed. 3. The quay wall is 2.2 meters above water level. On the east side of the harbor entrance are three installations for tipping railroad cars and ton 7-ton cranes, have a 25X1 A?~'le ne.."4 three portals for standard-gauge :rn side each of 25X1 9 an he west ity of 7 tans. Next are three loading rai lroad traC1cS . .t, A 'f .,nr, 4 r ~. 25X1 25X1 eQ Harbor of Neufahrssascor (Nowy ?ort) On the northern side of the F house about 150x50 meters in area. The con- t'?,ere is a not" three-story war, southern side of the harbor has not ,10 warehouses on the , a was loaded hero in 1948 and 1919. dition of t, lban changed.. ,jar material for . 4. stmetion? which also have a lift capac sites of 1> tons capacity ea TO: TS S 25X1 Approved For Release 2003/08/05: CIA-RDP8 t O45.7RO0558_O0"230805-2 Approved For Release 2003/08/05 : CIA-RDP82-00457ROO5800230005-2 C RUM I11 TELLIGME AGMY 25X1 0 The southeastern quay of Via, lharly- of k~eu l' ra:sser , vi th sheds and raila'oad tracks, has been rebuilt.. This quay is always occupied to capacity by sea-going ships but only six 5 -ton cranes are available there. Railroad tracks are being laid on the :i',E cornor of the quay. On the narrow soutlri~ester:n side the workshop buildings fob technical repair crork have been recon- structed and are in operation, 6. About 600 meters of the northwestern quay hate been repaired. The ronainder, as far as the hole, will not be finished until late 1950, Modern transshipment facilities with numerous tracks on tither side of the sheds are being erected on the quay. Two of these sheds., large- sized halls abreast the reconditioned quay wall, are already finii.shed,,* 7. The sea-going tug Prom;tai and the 2,000-ton lighter Onega put in at the tree Harbor o.f' l cM crasser to load: coal on 23 ch 1950. The 2,000-ton lighter Venta put is -Go load coal on 22 Larch 1950, and the SS 1~: ilta -pat i,?-:yea load. coal on 22 I-larch 1950 at 6 p.,rao A soa-g??oi.ng ';ovtot tog ni th the 2,00.0-ton lighter Tundra 7 n tow was observed near the sea _ buoy at noon on 23 ?rch T9'5 25X1 * IJCoi nent~ Official Polish inforr tion gives the length of the eastern, ; western. and no"".tharn quays of the coal harbor as 1300, 640, and 125 meters respectively,, The depth at the eastern and western quays is nine raters, and at the southern quay, 7 in eaters. The loading facilities at the eastern quay Include a coal-handlin installation with facilities to tip railroad cars, and ten cranes vi th a total lift capacity of 61L, tons, it the western quay there are seven cranes with a total lift 25X1 Comte Dre to Eat - c; - - quay's is , e peters, the southern quay Bing 60 meters, The depth alongside quays is 10 meters, The loading .aches consist of six cranes with a total. lift capacity of 18 tons, The total floor space of the sheds is 17800 square meters. The main traffic in the free harbor consists of general cargo and basic (Thomas) dla, 11` cox: Plan of Danzig. Harbor with legend. CONFIDENTIAL 125X1 25X1 Approved For Release 2003/08/05 : CIA-RDP82-00457R005800230005-2