NEURUPPIN AIRFIELD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R005600170011-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 14, 2016
Document Release Date:
October 25, 2000
Sequence Number:
11
Case Number:
Publication Date:
July 25, 1950
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP82-00457R005600170011-4.pdf | 145.8 KB |
Body:
Approved For Release 200'N031f51J-CENRD 8;JW457R00560Rg X7 11-4 )L~ q!
CLASSiFICATI( GC6Th0L/1i' J OFYICIALS 0
t't'1114~11'Ez _._ ; .`v let zone of Germany F__ ... REPORT NO._.._
TOPIC Neuri"IMsin Airfield
EVALUATIO See below PLACE OBTAINED 25X1A
DATE OF CONT 25X1 A
DATE OBTAINE
REFERENCES
PAGES ENCLOSURES (NO. & TYPE)
REMARKS
25X1X
25X1X
1c, In mid-May 1950 a worker employed at Neuru, 1,in (D 53/i 49)
airfield told source that the new runway was to be dug
80 cm deep and covered with a layer of crushed stones
p;ed by cement0 The runway was to be about 3,000 meters
to
,
25X1X long and 60 meters widen
2, The construction of a runway was under way at Neurukkin
airfield on 18 May 19504 The stri1., which was being
leveled was 1?500 to 2,,000 meters long and about 50 meters
wide, About 40 mestsn 50 meters atart and fitted with
larks, were on both sides of the runwayo The building
site was not guarded, . A. sign=board at the eastern edge
of the building site bore the in scr iition '3Buildil,,C~. Suter
prise Brandenbur ;aa, A narrow-gauge tracks a steam loco-
motive fl a crane and a concrete mixing naahine were at the
candi irora. t
closed
building site. The intact hangar
were not seen" The airfield barracks
25X1X capacity by Soviet Army units0
3. On 30 May it was learned that the building firm doing the
construction work at Neurukkin airfield was called
"Building 'nter, rise Brandenburg,. Bauuniof Last, lotsdam,
46-49 i-otsdaiaer Strassea te1o 2.11 .and 2161'. About LE-50
workers were employed at the field. Wooden sheds were
being built at the western edge of the air fdelin ddition
to the construction of the runway, told source that the work was scheduled to be c&mkleted
by 1 August 1950o
CLASSIFICATION SlIZ,
Ap
CONFIDENTIAL
T/00NTI;OL/U6 OFFICIALS ONLY
This document is hereby regraded to
CONFIDENTIAL in accordance with the
letter of 16 October 1978 from the
Director of Central Intelligence to the
p it dt PbP1RWLitet2@0 1 /03/0
Next Review Date: 2008
5: CIA-R
Approved For Release 200'1kQ
Cof RAt57R005600170011-4
M I- I
T/CONITIWL/U; OFFICI."IL6 ONLY
2
25X1A
25X1A. Co1!ament~ The three sources agree on the co~xstrue-
tion of concrete runway, Which was j--roviously known.;
The statement that this runway is to be 1, 400 meters long
seems to be exaggerated. According to krevious irforAriation
it will, be from. 2,000 to 29500 meters long. The target
deter the com.ietion of the runway is redorted for the
first time. The runs ay under construction in Koethen is
also said to be scheduled for corrra,letion about the same
date, 15 August 1950. The occufation of the airfield by
army units is confirmed. No air unit is -,resently stationed
at the field. For sketch cf airfield, see unnexo
1 Annex: Layout sketch of Neurul fin Airfield.
CONFIDENTIAL