REGIONAL ELECTRIC ENTERPRISES (IRE)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R012300310006-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
12
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 14, 2011
Sequence Number: 
6
Case Number: 
Publication Date: 
June 4, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R012300310006-9.pdf655.46 KB
Body: 
Sanitized Copy Approved for Release 2011/02/14: CIA-RDP82-00457RO12300310006-9 {4ljGL.L.O i\X14 CENTRAL INTELLIGENCE"AGENCY CONFIDENTIAL SECURITY INFORMATION INFORMATION ' REPORT REPOR CD NO. COUNTRY Rumania SUBJECT Regional Electric Enterprises (IRE) OF THE UNITED STATES, WITHIN THE MEANING OF TITLE 18, SECTIONS 799 AND 794, OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT BY AN UNAUTHORIZED PERSON IS PROHIBITED BY LAW. THE REPRODUCTION OF THIS FORM IS PROHIBITED. PYNO. OF ENCLS. (LISTED BELOW) 1952 -12 THIS IS UNEVALUATED INFORr4AfiON 1. The control of the production and distribution of electric power in Rumania is vested in the Ministry of Electrical Energy (Ministerul Energiei Electrice) in Bucharest, which operates through Regional Electric Enterprises (IRE) (Intreprinderile Regionale de Electricitate). -2. One such regional organization is the Constanta Regional Electric Enter- prise (IREC) (Int i d repr n erea Electrica Regionale Constanta) which con- trols the production and the distribution of the electric power stations in the area of Constants. The electric power station of Constants is located in an area between Bulevardul I.V. Stalin (formerly Bulevardul Regina Maria) and Tabacariei Lake. The area is surrounded by a concrete fence, two meters high, with a gate on Bulevardul I.V. Stalin and another gate on the side of the lake, There follows a description of the Constanta electric power station: a. The main building is a large single-story hall divided into three sections: The Boiler Room (Sala Cazanelor), the Pump Section (Sala Pompelor) and the Turbine Section (Sala Turbinelor). In the Boiler Room there are two steam boilers of unknown dimensions anl.enough room for the installation of another boiler. There are also two pimps., one pumping fuel oil from the railroad tank cars into a large, tank in the power station and the other pumping fuel oil from the tank to the; boiler furnaces. Two electric control panels and two large ventilators complete the.equipment of this room. Extending from the Boiler Room are two chimneys. The Pump Section is equipped with a Diesel ,motor 50X1-HUM for auxiliary power, two large and one small electric pumps,, one steam pump, two purifiers (epuratoare), one fan, one control ? ne1l, one tank CLASSIFICATION CONFIDENTIAL ec assjfis d LSTATE X NAVY X NSRB FF DISTRIBUTION ass,, a gei To: i $C i _T, ARMY X A I R X FB I Ev x i~f:th.! 7 ?2 Dnment I. T me Change In Class. - ---"~ D l DATE DISTR. 4 June NO. OF PAGES Sanitized Copy Approved for Release 2011/02/14: CIA-RDP82-00457RO12300310006-9 Sanitized Copy Approved for Release 2011/02/14: CIA-RDP82-00457RO12300310006-9 for Diesel oil and a water :ati._..,. Inc '!'`'-r .t e V ,.- two turbo-generators t _ p _L.F_ Of !'O . is - 4,000 k .,t.: >&" t ts. Thare is enough room in th.: a section Or the .r.y _?ii t.ion uf generator. F'.rt! . xwe ey here are two for the control of thF ca~_1'np..' and nc . ih n . _ g y r Si3!. T t .'?a1y C r3 t 3 t ,y. roomy a welding rorom, a di..trib icu panel, a water basin, eni one fan. b. Adjacent to the rnai.r; hall there is .: 1wo'==sic.r y building t,wtr I..n;, transformer station, ba %; o ;me dY:tY'`:-1-I 7 :1.._.