NORTHERN PORTION OF THE ZOSSEN-WUENSDORF AREA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A032800390001-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 22, 2016
Document Release Date:
February 22, 2010
Sequence Number:
1
Case Number:
Publication Date:
February 21, 1957
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 309.19 KB |
Body:
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246A032800390001-5
4 pKOCESSING COPY
?? ? ??? ?? ? ??
CENTRAL INTELLIGENCE AGENCY
This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title
18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law.
COUNTRY East Germany
SUBJECT Northern Portion of the
Zossen-Wuensdorf Area
DATE OF
INFO.
PLACE &
DATE ACQ.
DATE DISTR. 21 February 1957
NO. PAGES
REQUIREMENT
NO. RD
report, with a sketch
of the
- - - -, , 7 -- ------- p--
25X1
area and giving the location of significant installations in that area.
The sketch is to the scale of 1:5,000.
STATE I IARMY X NAVY
I X AIR IX FBI AEC
0
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246A032800390001-5
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5
EAST .G'RNiANY
AIR ?MILITARY
Layout of the NORTHern dart of the ZOSSEN- VY'Tj'ENSDORF ua Curr;nt
GENERAL
1. Attached at Appendix "A" is a plan shewin; the layout of buildings in the
NORTHern part of the ZOSSEN-WtJENSDORF area.
2.. The plan is sketched to the scale of 1/5000-
3. Details of the buildings and installations are given in the followin.;
paragrar s.
BUILTINGS OCCUPIED BY THE SAF:
4. The buildings occupied by, or belonging to, the; SAT, are the groups
arrowed on the plan. Details of the buildings are given
Nos 1, 2, 3 - 15 x 17 in. 3-storeyed houses occupied by SAF officers
and their families.
4 - 50 x 30 in. Houses the central heating system.
5 - 120 x 30 in. 2-storeyed block housing SAF offices.
6 - 50 x 30 in, Used as a post office and W/T station.
7 & 8 - 50 x 15 in. 2-storeyed houses occupied by SAF officers and
9, 11)
12, 13)
their families.
- 12 x 10 in. -da- -do-
10 - Built iii the shape of an L and measuring 60 x 12 m and
25 x 12 in. Houses a theatre.
14 - Built in the shape of an L and measuring 50 x 12 and 25 x 12 in.
15, 16) 75 x 17 m. 3-storeyed barrack blocks used as quarters f r
& 17) - SAF ORs.
16 - 50 x 15 in. 2-storeyed building housing SAF offices.
19 -26 2-storeyed houses used as quarters by S AF officer. s .
(incl) - 50 x 15 in. In some of the houses there are also offices.
27-30
(inc l) _ lib lut i . ns .
31 - 20 x 10 in. 2-storeyed building, used as offices.
32 - 50 x 10 in. Large hall used as a ,rorkshops .
33 - 50 x 10 in, Large hall used as a ,araFre for cars.
34 - 50 x 10 in. Large hall used as an equipment store.
35 - 38 - 15 x 10 m. 2-storeyed houses used as quarters by S11F officers
(incl) and their families.
39, 40)
41, 45) ~)" " l~) m'. usea as a1U oIncers' quarters.
42 - Built in the shape of a T and measurin 75 x 15 m and 25 x 15 in.
3-storeyed and used as SAF offices and duty rooms.
43, 44 - 75 x 15 in, Large hall used as garage for lorries, W/T trucks
and A/A SLs.
469 47 75 x 1.2 m. 3-storeyed barrack blocks occupied as quarters by
46 - S LF officers and ORs.
49 - 30 z:7.2 in. A requisitioned house used as offices by the SAF
political officer.
71
51 -
arrack block used by A/A personnel.
& N3 - 1 ` ~ 1 r L,. I ~~ c u oarracx DIOCK:s unaer construction.
N4 - NS 3-store red barrack blocks under construction
75 x 17 m. ~ (~.1,terc
(incl) scheduled for compl.mtj.on by the end of 1956).,
N9, N10 - 75 x 17 in. 3-storey _)d barrack block:. under construction (.;ere
scheduled for completion by mid-Jaxi 1957).
G1 - G4 Planned sites for the building of 3-star..-ro barrack blocks
(incl) measuring 75 x 17 ri. Building of the foundations already in hand.
G5 - This area of ground has been cleared and levelled and -'ork has
started on the build:nng of wooden barrack: blocks and garages.
G6 - This area has been c:;eared and levelled. No further ''c:rk is in
S L C n E 1r progress and it is nct yet ?T' a is to be used.
Sanitized Copy Approved for Release 2010/02/22 CIA-RDP80T00246AO32800390001-5
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5
A petrol point vrith a capacity of 20,000 litres.
A/A emplacements. Each point has the following equipment.
6 A/A guns, calibre 100 mm;
1 large box-trailer with a saucer-shaped aerial array
mounted on the top. This array is rotatable.
2-3 closed box-trailers.
The personnel from the A/A defence points are from the
barracks at REFaGEN.
Net aerial swung between buildings Nos 15 and 17. The net
is 12 x 4 m on the top and 12 x 3 re at the side.
5. Other installations marked in the SELF area are. as follows,.
is
TSCIIITSCHIN Unit
6. They buildings occupied by TSCHII'SCAIN's unit
TSCTiI'I'SCIIIN i s a Lieutenant Colonel and
r,xpprox 1500 tps with red sbds. Details of the buildings
unit are as foll vis :
skotch.
c ,:orn?;Zands
occupied by the
Nos 1, 2, 3, 5, 7, 8, 9: 75 x 17 rm. 2-storeyed barrack blocks used as
accommodation for troops.
80 x 17 D. Administrative building housinf, central heating syst3m
znd a workshop.
6: 75 x 17 or. 2-storeyod building housing; the unit IEQ and offices.
10; Underground petrol storage: room measuring 30 x 10 in in floor space.
Petrol is stored in barrels.
11: !.?lying roof' made of wood under which vehicles are parked.
12: Requisitioned house used .s privra,te quarters by TSCIHITSCIIIN. The
house is also used as the unit reporting centre.
ARTILLERY UNIT
approx 800 men are stati.^.ned with this unit. Th.--
following equipment has boon soon in the area:
50 field guns 76.2 mm lied 42;
9 A/tk guns 100 mm.
8. The area occupied by the unit is arrowed on the plan. Details of the
buildings are as follows:
No 1: Underground petrol store-ro:,r. with a floor space of 30 x 10 U.
Petrol is stored there in barrels.
Nos 2, 3, 4, 5, 8, 9,10, 11: 120 x 10 in. ~~ll store barrack blocks
used as quarters for troops.
Nos E & 7: 120 x 10 m. Stone barrack buildings used as stores and
administrative buildings.
No 12: 75 x 15 in. 2-storeyed building used as unit EQ. and offices.
Nos 13, 14 & 15: 50 x 10 m. Private houses used as quarters by officers
and their families.
Nos 16, 17 & 18: 50 x 25 r:. Wooden barrack buildings used as garages
for vehicles and .;;ars.
No 19: Store-room on the f'irin range and trainin: area.
I?
U.20: Training area and firing ran_.,,,.
MISCELLANEOUS
8. Other areas shown on the plan and not mentioned 1 Vit cregoint;
paragraphs ,are as follows:
T-SCH - Pistol range and clay pi,-,eon ran.;e .
t: a E 9
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5
A petrol point vrith a capacity of 20,000 litres.
A/A emplacements. Each point has the following equipment.
6 A/A guns, calibre 100 mm;
1 large box-trailer with a saucer-shaped aerial array
mounted on the top. This array is rotatable.
2-3 closed box-trailers.
The personnel from the A/A defence points are from the
barracks at REFaGEN.
Net aerial swung between buildings Nos 15 and 17. The net
is 12 x 4 m on the top and 12 x 3 re at the side.
5. Other installations marked in the SELF area are. as follows,.
is
TSCIIITSCHIN Unit
6. They buildings occupied by TSCHII'SCAIN's unit
TSCTiI'I'SCIIIN i s a Lieutenant Colonel and
r,xpprox 1500 tps with red sbds. Details of the buildings
unit are as foll vis :
skotch.
c ,:orn?;Zands
occupied by the
Nos 1, 2, 3, 5, 7, 8, 9: 75 x 17 rm. 2-storeyed barrack blocks used as
accommodation for troops.
80 x 17 D. Administrative building housinf, central heating syst3m
znd a workshop.
6: 75 x 17 or. 2-storeyod building housing; the unit IEQ and offices.
10; Underground petrol storage: room measuring 30 x 10 in in floor space.
Petrol is stored in barrels.
11: !.?lying roof' made of wood under which vehicles are parked.
12: Requisitioned house used .s privra,te quarters by TSCIHITSCIIIN. The
house is also used as the unit reporting centre.
ARTILLERY UNIT
approx 800 men are stati.^.ned with this unit. Th.--
following equipment has boon soon in the area:
50 field guns 76.2 mm lied 42;
9 A/tk guns 100 mm.
8. The area occupied by the unit is arrowed on the plan. Details of the
buildings are as follows:
No 1: Underground petrol store-ro:,r. with a floor space of 30 x 10 U.
Petrol is stored there in barrels.
Nos 2, 3, 4, 5, 8, 9,10, 11: 120 x 10 in. ~~ll store barrack blocks
used as quarters for troops.
Nos E & 7: 120 x 10 m. Stone barrack buildings used as stores and
administrative buildings.
No 12: 75 x 15 in. 2-storeyed building used as unit EQ. and offices.
Nos 13, 14 & 15: 50 x 10 m. Private houses used as quarters by officers
and their families.
Nos 16, 17 & 18: 50 x 25 r:. Wooden barrack buildings used as garages
for vehicles and .;;ars.
No 19: Store-room on the f'irin range and trainin: area.
I?
U.20: Training area and firing ran_.,,,.
MISCELLANEOUS
8. Other areas shown on the plan and not mentioned 1 Vit cregoint;
paragraphs ,are as follows:
T-SCH - Pistol range and clay pi,-,eon ran.;e .
t: a E 9
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5
4e
Sanitized Copy Approved for Release 2010/02/22 : CIA-RDP80T00246AO32800390001-5