NEW POWER DISTRIBUTION CONTROL STATIONS AT LITOMYSL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004101000010-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 1, 2010
Sequence Number: 
10
Case Number: 
Publication Date: 
May 31, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004101000010-4.pdf106.17 KB
Body: 
Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-0081 OA004101000010-4 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains Information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of Its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL.U.S.OFFICIALS ONLY New Power Distribution Control Stations at Litomysl REPORT DATE DISTR. NO. OF PAGES REQUIREMENT NO. RD REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 1. Two.new distribution--control centers are in one 2 -story rbilding,located 150 meters east of the cemetery on the eastern edge of Litomysl. The area is enclosed in the north and east by a wall 22 meters highs and in the south and west by a wire fence,, 2 meters highs 2. The 35 kwh distribution-control station is divided into 10 cubicles, walled up with "Kalorifit" (probably the trade-name of some insulating materials) and covered with~,plaster. There is an oil transformer, 359000-'jvolt, which was supplied by the CKD (Ceskomoravska-Kolben_Danek)Lin April 1953. Control equipment was supplied by the Veltechna plant at Cakovice in May 1953. The 6-kwh.4distributton- control station has 24 cubicles. Its equipment was supplied by CKD?-in April 1953. Two oil transformers were supplied by Skoda-Lin July 1953. 3. The station employs six workers who are on duty in three shifts. 4. Current comes in over a 359000- colt line from the power plant at deska Trebova. Officially it is said that the current will be distributed in the town of Litomyysl. This is, however, improbable, for a power-line leads from the distribution station to the village of Pohodli, some 6 km. away. Some 1500 meters east of this village is a military unit and installations,, guarded by soldiers with purple lapels. In this'unit there is supposed to be a W/T transmitter. 5. Praha)., the Electric Assembly. Works Elektromonta rli zavc are now building one 100-kwh distributions-contr center one for kwh and another one of unknown capacity. to"Fun there have a special authorization from the central plant, giving identification. a photogranh. grid an nni ni on from +.hn rAr1rsA rior~ari-mont. SECRET/CONTROL.U0S. OFFICIALS ONLY STATE X ARMY X NAVY X AIR X1 FBI (Note: Washington Distribution Indicated By "X'; Find Distribution by 31 May 195l1. `- 25X1 r1r 25X1 Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-0081 OA004101000010-4 Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-00810A004101000010-4 SECRET/CONTROL-U.SOOFFICIALS ONLY There are two distribution-control 25X1 stations an one under construct ono beside these there are two quite large buildings, exact dimensions not known. Workers are not allowed to go from one building to another without authorization. Sketch of Distribution Station at Litonavsl. Scale-1:500 2 tr nsfo ers b-wh. distribution-control station-24 cubicles 2 transformer, 35 kwh 1 b I 6 35-rh distri- corridor bution-control offices station, 10 2 4 cubicles T r- 3 ontrol ~quipmzent SECRET/CONTROL-U.S.OFFICIALS ONLY Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-00810A004101000010-4