CABLE (SANITIZED) FROM NPIC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04555A000300020048-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 7, 2008
Sequence Number: 
48
Case Number: 
Publication Date: 
October 24, 1969
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04555A000300020048-4.pdf67.42 KB
Body: 
Approved For Release 2008/07/07: CIA-RDP78BO4555A000300020048-4 Q Z- L4 R 242237Z FM NP 7 C no 25X1 DISTRIBUTI 25X1 TOPS E G R E T TTTTT RUFF -, ___~_ r,-_ r- 53 1. SECOND-PHASE EXPLOITATION OF MISSION 1052 (26 SEP 69) 1 :5-^ THREE UNIDENTIFIED INSTALLATIONS UNDER CONSTRUCTION THAT ARE U -F- ,&.r; i TIVE OF HARDENED COMMAND/CONTROL FACILITIES, TWO OF THE INS ARE 16 AND 25 NM NNE OF BREST, USSR, AT 52-21-OON 023-49-30E AND ,,~ k 52-26-40N 023-59-20E, APPROXIMATELY 15 AND 18 NM FROM THE PO B~1--- DER. THE OTHER INSTALLATION IS 10 NM EAST OF BELTSY, USSR, 47-45-OON 28-09-OOE, APPROXIMATELY 32 NM FROM THE ROMANIAN B 1.= 2. EACH INSTALLATION IS IN A HEAVILY WOODED AREA AND CON BUILDING UNDER CONSTRUCTION WITHIN A LARGE EXCAVATION, A BIL AREA. THE BUILDINGS IN THE EXCAVATIONS MEASURE APPROXIMATEL 28 METERS (125 BY 92 FEET), 38 BY 36 METERS (125 BY 118 FEET) 42 BY 38 METERS (138 BY 125 FEET). PRELIMINARY REVIEW OF PR `S-, COVERAGE INDICATES THAT CONSTRUCTION ACTIVITY AT ALL THREE L Q9S' EG 9 O M 68. HAD D UNY HD EARL 1 H AY 1 GP-1 T O P SE C R E T RUFF ((NOTE: ABOVE MESSAGE ALSO PASSED TOP ---- 25X1 20A 141 END OF MESSAGE Excluded iron aatemeix dawagraciflg and decikssification 14a5VAi?C' Cy SARI 21 ZED i a Approved For Release 2008/07/07: CIA-RDP78BO4555A000300020048-4