Monthly Narrative Summary Report - March 1975

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001400080010-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
April 10, 2001
Sequence Number: 
10
Case Number: 
Publication Date: 
April 7, 1975
Content Type: 
PERRPT
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001400080010-7.pdf157.54 KB
Body: 
GDW1RPi 4IJ_QI Release Q01/0 - 001400QW010-7 UNITED STATES GOVERNMENT Memorandum TO : Director of Communications FROM : Chief, Communications Engineering DATE: 7 APR 1975 SUBJECT: Monthly Narrative Summary Report - March 1975 1. OD&E advised that the launch of Spacecraft #7 is rescheduled from 30 April to 4 June 1975. The delay is associated with events that precede the launch and not with problems on the launch vehicle. 2. A final report summarizing the successful Transportable Ground Control Station T CS) tests recently concluded between California and and the RS-803 field sets was prepared. A recommendation was made to pro- ceed with Phase II of the plan to use the TGCS for reception of OC field transmissions. 3. Prototype UHF receivers developed for OC by ODTE were received for evaluation in the SV-8. 4. A pre-production evaluation of two of the first six production SV-8's was begun at the end of the month. The objective is to secure a production release during the first week of April. 5. A "crash" TEMPEST/EMI requirement was levied on COMSEC to evaluate the CY-5 voice/data ciphony unit which is a CY-3 modified for data input/output. If the evaluation is favorable, we would exercise a production option with the vendor, which expires 25 April, for a quantity of CY-5 ciphony units. 6. The first SF-1 Secure Facsimile System was placed in 25X1A6a shipping channels When notified that the SF-1 equipment has arrive , the Project Engineer, Mr. will depart to make the installation. 25X1A6a 7. Reports from indicate that the TL-4 telephone cut-out system installed at those locations are erformin very well. Also, discussions with the 25X1A6a resulted in an agreement to eve e op a TL- Training Package. E2 IMPDET Approved For Release 2001/07/12 : CI-A-RDP78-02820A00140008001W BY 0 2 7 8 5 9 Buy U.S. Savings Bonds Regularly on the Payroll Savings Plan 25X1A 25X1A6b 25X1A9a Approved For Release 2001/07/12: CIA-RDP7A0014i&080010-7 25X1A 9. The K0I-16's (KW-7 Card Readers) have been released from the technical hold. The automated testing by "Fixit" of the 1450 units continues and this project is about 50% complete. 25X1A5a1 in Mr_ President of 25X1A5a1 25X1A5a1 , visited the Crystal Lab. 25X1A6a His visit was at our request to assist in an evaluation of our present crystal processing capabilities and to recommend any necessary changes. 11. A concerted effort is being taken to review the aspects of installing a new cable distribution system in the Headquarters Building which can support a new secure PABX as well as high speed data and video transmissions. As part of this effort, consideration is bein iven to the 25X1A5a1 negotiation of a 30-day study contract with 25X1A5a1 to determine the economic trade-offs of multi-pair cable versus a wideband coax system. 25X1A2g 12. Negotiations with for the 25X1A6b procurement of ARS-IV to be installed at were com- pleted on 7 March. A final price of $540,000 includes system delivery and installation, and a maintenance training course. 25X1A6a The ARS-III system is resently at awaiting shipment 25X1A6a to via a flight scheduled for 6 April 1975. Due to damaged batteries which are part of-the ARS-III Uninterru ted Power System, the installation of the ARS-III 25X1A6b system has been delayed until mid-July 1975. 13. The start of pre-acceptance tests on the DATEX systems has been delayed an estimated two weeks until some software problems have been resolved. 14. While the CDS program has encountered further delays, discussions held with representatives of - have 25X1A5a1 resolved the technical problems which have recently plagued the program. Planning for the renovations of the Cable Secretariat continued, including the initiation of several material requisitions and work orders. It is now anticipated that the target date for the activation of the CDS system will be May 1976. Approved For Release 2001/0711A mRn -0282 A001400080010-7 2 .. Approved For Rele 2001/07/12 :-CiA-RIDP78-02820AO014JQp080010-7 15. After a thorough review of the various customer requirements was conducted, there are indications that for the next several years, narrative traffic will be pre- 25X1A2g dominant in and that the data requirements that do exist at selec e ield stations could possibly be handled on the AVD channel at those stations equipped with SKYLINK terminals. The further resolution of these requirements as well as of the many issues that affect the evolution of the network has resulted in delays in the completion of the Network Improvement Plan. 25X1A6a 16. Th installa- 25X1A2g tion was completed this month. The arrived 25X1A6a 25X1A6a h d r d f i i b at t e air shipment. an ng processe o s e 17. The SKYLINK installation was completed at 25X1A6a Bid packages for new SC-1 terminals (SN 40-49) were released. 18. All OC areas have submitted their FY-76 Network Equipment program requirements with the exception of - Preliminary review indicates the areas are requesting about 100 percent more than the tentative approved FY-76 budget. Much trimming will be required to lower this funding require- ment.to approximate the FY-75 budget levels. 19. Of the 20 SG-75B's (low noise synthesizers) received, five remain to be tested. Delivery to high priori- ty field stations will commence soon. 20. A memorandum has been written for a worldwide 25X1A2g - Master Clock System. The primary timing will be de- rived from Loran C with cesium beam clocks as backup. Turn- around data derived clocks will be used at field stations. 25X1A 25X1A9a Distribution: 25X1A Orig - D/CO; DD/ OC-EXA; OC-PtB; OC-IC (Archiving) 1 - OC-0; OC-0 D 1 - OC- S ; OC-CS Approved For Release 2001/07/12: CIA-RDP78-0282OA001400080010-7 3