Inspection Report No. 1 - AN/B-62(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200030041-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 17, 2016
Document Release Date: 
August 23, 2000
Sequence Number: 
41
Case Number: 
Publication Date: 
May 11, 1966
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200030041-0.pdf112.75 KB
Body: 
ARg rr ed -or Releac201701bW08 : CIA-q z UNITED STATES GOVERNMENT Memorandum EP 66-106 DATE: 11 May 1966 M" TO : The Files: Contract 4331, Task Order 1 FROM : Mr. 25X1A9a It SUBJECT: Inspection Report No. 1 - AN/B-62 with 25X1A5a1 1. Project Description: The AN/B-62 is a loop antenna assembly which is designed for use with the RR-49 receiver to permit its use in DF applications. It consists of a shielded ferrite core antenna, antenna tuning network, and frequency band switch. The tuning capacitor provides a means of resonating the loop antenna over each of the frequency bands; the frequency band switch is used to select the proper loop inductance for each band. Energy is coupled from the loop antenna to the RR-49 receiver by a low impedance tap on the loop winding. A coaxial cable assembly is used to connect the AN/B-62 to the RR-49. A "pocket carrying card" is provided and is used to mbunt the AN/B-62 when it is used under the operator's clothing. A "handle" in the card is provided for handheld operation. c. Initiation Date: March 1966 d. Completion Date: June 1966 e. Deliverable Items: 100 AN/B-62 antennas Contractual Information: a. Initial Cost: $13,361.03 b. Request for Procurement Action: 12 January 1966 3. Date of Meeting: 15 April 1966 4.? Place of Meeting: Fort Wayne, Indiana 5. Persons Attending: Agency 25X1A9a Mr- Non-Agency 25X1A5a1 6. Contractor's Performance: Approved For Ne s~ 2000/09/08 : CIA-RDP78-0282OA001200030041-0 Buy avings Bonds Regularly on the Payroll Savings Plan Approved For Relea 2000/09/08 DP78-028204001200030041-0 dn" SUBJECT: Inspection Report No. 1 - AN/B-62 with 6. Contractor's Performance: EP 66-106 a. On schedule and expected to remain so: Yes b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical progress: Yes -7. Project Status: 25X1A5a1 Except for the tuning capacitors, all electrical parts required in the AN/B-62 assembly have been received at- Delivery of the 25X1A5a1 capacitor is estimated for 21 April. All metal work (cases, brackets, etc.) is complete. The coaxial cables (to connect the antenna to the receiver) have been assembled with a BNC connector on one end. The machine shop was completing fabrication of plastic vernier discs and the dial locking mechanism (essentially a lever arm which applies a pressure to the serrated edge of the vernier disc when the lever arm is placed in the lock position). A crude version of a more positive seating connector plug (coaxial cable to receiver) was exhibited. It appeared to "seat" in a satisfac- tory manner. The molds for this connector are available and the initial sample molded plugs were to be available within the next several days. The connector plugs will be molded of a hard rubber material. 25X1A5a1 An initial one-half dozen ferrite rods are being wound for elec- trical test purposes to establish acceptable winding tolerances. Also, as advised to check the input impedance of the new production run RR-4+9 to insure compatibility with the antenna. (The prototype antenna was designed by~using a service test model RR-49) 25X1A5a1 Hopefully, no problem should result. An initial quantity of ten AN/B-62's were requested for delivery. during the first week of May. This, of course, is dependent upon receipt of the tuning capacitor. 25X1A5a1 Distribution: R&D Subject File OL/PD/PCB/CAS R&D Lab E SB OC-SPS Monthly (3) OC-OS EP Chrono 25X1 A5a 10C-E/R&D-EP, /b jp (ll May 1966) Approved ForITMUM 2000/09/08 : CIA- M ' & , A001200030041-0