Inspection Report No. 3(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001200030033-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
November 17, 2016
Document Release Date: 
August 23, 2000
Sequence Number: 
33
Case Number: 
Publication Date: 
May 31, 1966
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001200030033-9.pdf124.59 KB
Body: 
A vaevedior?Release 2000/09108?.' CIA- P78-0282OA00120 30033-9 ,oex EDITION ~r GSA GEN. REG. N0.17 UNITED STATES GOVERNMENT Memorandum EP 66-114 TO The Files: Contract 4168, Task Order 2 DATE: 31 May 1966 doom FROM : Mr. 25X1A9a 'IUBJECT: Inspection Report No. 3 - RS-101 with 1.. Project Description: 6. Contractor's Performance: Payroll Savings Plan Buy U.S. Savings Bonds Regularly on 4%e 2. Contractual Information: a. Initial Cost: $219,945 b. Request for Procurement Action: 28 September 1965 c. Initiation Date: 12 October 1965 d. Completion. Date: 12 August 1966 e. Deliverable Items: Four service test models - 12 July 1966 Ten instruction books - 12 August 1966 Five final reports - 12 August 1966 One set reproducible manufacturing drawings - 12 August 1966 One set reproducible equipment specifications - 12 August 1966 One set reproducible production specifications 12 August 1966 3. Date of Meeting 19 May 1966 4. Place of Meeting: Cincinnati, Ohio 5. Persons Attending: Agency Non-Agenc Mr Mr. 25X1A9a Mr. Mr` Mr. Mr. Mr. Approved For ReleasJOO0/09/08 : -R 78-0282OA00120M30033-9 EP 66-114 $''UBJECT: Inspection Report No. 3 - RS-101 with 6. Contractor's Performance: a. On schedule and expected to remain so: No b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical progress: Yes 7. Project Status: The case and front panel for the engineering model are finished, with the exception of front panel engraving. The receiver is completely assembled and is being tested. Tests thus far indicate that performance is about the same as that of the RS-100 receiver, with one significant exception. Repackaging the tuner has resulted in a lower front end "'Q", and consequently a lower image rejection. A comparison of image rejection for the RS-100 and RS-l01 is shown: RS-l00 RS-101 Band 1 63 db 63 -48db Band 2 82 - 53 db 54 - 39 db Band 3 66 - 46 db 46 - 35 db Band 4 51 - 31 db 30 - 22 db M will make a halfhearted attempt to improve these figures (partic- ularly for Band 4) though little hope is shown. Five of the six circuit boards for the transmitter have been built and tested; testing of the sixth was 80% complete. Mechanical work on the heat sink module was finished and the module was ready for wiring. The RS-l01 engineering model should be completed by 10 June. Three weeks of testing are then planned. Work on the five service test models will start the early part of June. Present programming calls for completion of these in late September. This is about two and one-half months later than called for in the contract. About six weeks of this delay is attributed to a late start caused by indecision on our part concerning front panel layout. Another delay could be attributed to the extra design time devoted to the semi-automatic tuner to make it tune to within less than one turn of the knob. The difficulty of obtaining parts and services because of the problems in Vietnam also slowed the program. At the moment, the only unresolved. . . . Approved For Release 2000/09/08 : CIA-RDP78-02 mm" Q D CT 2 Approved For Releas#JOOO/09/08: CIA- 0A0012OW30033-9 EP 66-114 'MUBJECT: Inspection Report No. 3 - RS-101 with 25X1A5a1 At the moment, the only unresolved procurement problem involves the transmitter power transistors. The transistor type that had been promised by RCA .(and supplied as a sample) did not get into production. Clevite Division of ITT is about to begin production of a transistor that will serve adequately. _ does not have any of these now, but they do have promises that appear to be valid of delivery in time to meet the schedule as outlined above. Distribution: R&D Subject File OL/PD/PCB/CAS R&D Lab OC-OS ESB Monthly (3) EP Chrono ZX1A9a ?0C-E/R&D-EP bjp Approved For Release 2000/09/08: CIA-RDP78- X600: utomatlc downgradli 3 declasslticatlon --K" V111t (31 May 1966)