Trip Report - RS-100(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-02820A001000060009-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
May 12, 1998
Sequence Number: 
9
Case Number: 
Publication Date: 
December 30, 1964
Content Type: 
TRIP
File: 
AttachmentSize
PDF icon CIA-RDP78-02820A001000060009-5.pdf139.91 KB
Body: 
? ? MRt IR tpf10N U_ E AVEge63Vzj*lf1J8 : CIA- 001000060009.5 Memorandum The Files: Contract 924, Task Order 7 25X1A9a A 2 X1A 25)11*- IF 64-335 AAA: 3o December 1964 Trip Report - RS-100 with 25X1A5a1 1. Project Description: The RS-100 Radio set consists of a 2-24 He transmitter for 300 WPM OW at 20 watts output and manual CV at 10 watts output; a 2-24 Mc receiver for either AM, CV, or SSB; a 300 WPM keyer; and an appropriate power supply. This set is approximately 9" x 12" x 5"? Initial Cost: $910,701.00 Overrun: $116,386 Increase In Scope: $207,344 Request for Procurement Action: 16 July 1963 Initiation Date: 9 September 1963 . Completion Date: 31 March 1965 e. Deliverable Items: 1 Engineering Model 10 Service Test Models Increase In scope: 10 Additional Units 3. Date of Meeting: 18 December 1964 4? Place of Meeting: Contractual Information : C ae b. Persons Attending: Agency lion-Agency 25X1 A9a 25X1A 6. Contractor's Performance: a. On schedule and expected to remain so: Yes b. Within obligated funds and expected to remain so: Yes c. Satisfactory technical performance: Yes 7. Project Status: . . . . Approved For Release 2001/07/2 ? f -b1$2J~1 00060009-5 ?~~~.VI? . _`__ '171 Approved For Release 2001/0 78-02820A001000060009-5 ' 6k- 333 8UBJ CT: ? Trip Report - 118-100 with 25X'TA 0 25X1A5a1 .Project Status: Eight of the ten service test models have already been shipped. The first of these, which was received in October, was returned at the isfineeting for updating. This, along with two others, will be shipped by week in January. The PS-100 line filter has been changed by, the elimination of two inductors. These inductors, which were intended to block BF from the power lines, were saturating on peak loads and causing erratic operation of the PS-100. Measurements of broadband and Cif conducted interference is consid- erably higher than what is normally considered acceptable. However, this conducted interference may not be particularly significant when compared with the radiation from the RS-100 antenna. The engineering model of the PS-100 has been through shock, vibration, immersion, temperature, and humidity tests. Prior to shipment the first week in January, it will also go through salt .,spray tests. ? 25X1A5a1 - expressed considerable concern about the reliability of the 05-100. No one unit has yet worked over the full temperature range. By a delicate and complicated oscillator coil tuning procedure, each OS-100 could be brought into specification, but this is a costly and time consuming operation, not readily adaptable to quantity production. There is a general feeling of a need for a thorough analysis of the synthesizer lock-on scheme and feedback loop dynamics. It was agreed that the OS-100's will be accepted as presently constructed with the understanding that will submit this analysis, 25X1.A5a1 together with suggestions for improvement. has completed eight of 25X1A5a1 the OS-100's. 25X1A5a1 received approval for production of the second ten units on ?24 December. An incentive was added for delivery by 31 March 1965. Orders were placed the last week in November ?for all components, but some of these25X1A5al are lond lead items that could delay the 31 March delivery. S #?~X1A5a1 quoting eight weeks for delivery of the transmitter tuning capacitors; ' 25X1A5a1 quoting eight weeks for delivery of the mode selector switches; Corporation is quoting eight weeks for delivery of the first receiver tuning capacitor and twelve weeks for delivery of the last three. Any slippage in 'these deliveries may cause a correhponding delay in the delivery of ABT100's. Approved For Release 2001 ?25X1A5a1 Approved For Release 2001/07/28 -aTECT: Trip Report - RS-100 with Mountain View, California 25X1A5a1 -25X1A5a1 EP 64-335 25X1A5a1 1 has asked for permission to display and/or demonstrate or generally market the RS-100 to various other government agencies. stated goal is twofold: drum up interest in the RS-100 and to demonstrate capability. was told that there would be no objection tol this in about six months, but a the moment we insist upon maintaining control over disclosure. iW& then offered to make a ten minute movie about the RS-100 in anticipation of a future. marketing effort. This would be done at no charge to the contract and the file would be available a us. This islwas agreed to with the stipulation that the script be approved prior It is expected that the film will be completed sometime in lebruaiy? 25X1A9a Distribution: &,RO Subject File Inspection Branch OL/PD R&D Lab OC-OS EBB Monthly (2) EP Chrono AFd'A --2'5X1 A9a OC-E/D-EP /amw (30 December 19(4) l II Jr' 1 9 Approved For Release 2001/07/28 P78-0 0009-5 3 kclasttlic~u,a