PERKIN-ELMER CAMERA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00820R000400020026-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
7
Document Creation Date:
November 17, 2016
Document Release Date:
April 18, 2000
Sequence Number:
26
Case Number:
Publication Date:
September 25, 1961
Content Type:
MFR
File:
Attachment | Size |
---|---|
CIA-RDP67B00820R000400020026-2.pdf | 256.54 KB |
Body:
Approved For Release 2000/08/2$ , IA-RDP67B0082OR000400020026-2
OMC-2324
Cogs
25 September 1961
FOR T TMCM
25X1A
Perkin-Si.rser eta
1. At a meetin& on 22 Seer 1961
Pr+a west Begftuarters and lies:
25X1 A t Perkin-]fi asr, the following decisions
reached:
a. Canera #l will be built with the existing optics awl: Is
ecpecteed to be ready for test in the C-119 in December per
attached schedule.
b. Canasta #2 will be constructed with the revised optical
system as previously submitted by P-E.
c. Glass for three csaerras will be purchased, to include
optics for 04aeer4 4P. 25X1 A
2. We were assured that 33.1 contimie to be closely
associated with this project. 25X1 A
3. An overrun of approzinstely a forecasted acccardi
to the attached cost susawy. This overrun has developed since the
3 April financial eestimstee& were submitted and in not attached to prior
overruns rye apparent at that time.
25X1A
0" D
M
Cy 1 - C/V1/DPD (r/att.)
2 - t/DPD (v/att. )
W.TAI
ACIWD
-IM
6-ter/
SEC
Approved For Release 2000/08/28 : CIA-RDP67B0082OR0004000200 6-2
Approved For Release 2000/08/28 : CIA-RDP67B00820R0
25X1A
En,;ineering
;lanufacturin.
Quality Control
TOTAL LABOR
OVERHEAD
Purchases
Raw Glass
Gravel
..PRIME COST
G & A
TOTAL COST
Fee
TOTAL
:c,rrnleto
Completion
April 3
Estimate
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020026-2
22 September 1961
Schedule - (Separate Attachment)
2. Additional Support - Contractor Action~
to Attain Schedule
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2 '.
Additional Support
Item Action
Personnel Transfers Confirm all arrangements for transfers by
September 25, 1961.
optical Shop Maintain highest priority for Special
Projects. Fulltime coordination for all
glass in process.
Facility Services, Personnel, Provide additional administrative and
and Equipment clerical personnel to support technical
personnel - Provide additional facility
support equipment (analog computer, car,
etc.). fl
Purchasing Expedition Provide resident purchasing department
personnel to accelerate procurement pro-
cessing and vigorous liaison with vendors.
Unclassified Projects Out provide engineering and manufacturing
of Facility support outside of facility to accomplish
unclassified areas of program.
Double-Shift Manufacturing Establish number of personnel in all shops
Personnel available for night shift operation when
Back-up Personnel
required.
25X1A 25X1A
it additional back-up personnel =
d0to be cleared and made available to
program if required.
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2
25X1A
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2
Next 1 Page(s) In Document Exempt
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020026-2
25X1A
Sr. Staff Engineers
Elec. Engineers
Mech. Engineers
Optical Engineers
Mfg. Engineers
Test Engineers
Additional
Personnel
files ui r.ri
Administrative
Service
Designers - Draftsmen
Mech. Technicians
Elec. Technicians
Back up
Personnel to
In addition to those personnel required for immediate use in the
facility (Col, "A"), approximately four engineers, two technicians, and
one designer will be required to support related but unclassified projects
outside the facility.
* Can be utilized Un-Cleared
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020026-2
Approved For Release 2000/08/28: CIA-RDP67B0082OR000400020026-2
25X1A
Prime Cost through 25 August 1961
G & A through 25 August 1961
Costs through 25 August 1961
Prime Cost to Complete 25X1A
Labor
Material
Travel
Commitments
Total 25X1 A
G & A a
Total Cost to Complete
Total Cost at Completion
Total Cost on Contract
Overrun
** Unfunded
Total Additional Funding Required
25X1A