PERKIN-ELMER CAMERA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP67B00820R000400020026-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
November 17, 2016
Document Release Date: 
April 18, 2000
Sequence Number: 
26
Case Number: 
Publication Date: 
September 25, 1961
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP67B00820R000400020026-2.pdf256.54 KB
Body: 
Approved For Release 2000/08/2$ , IA-RDP67B0082OR000400020026-2 OMC-2324 Cogs 25 September 1961 FOR T TMCM 25X1A Perkin-Si.rser eta 1. At a meetin& on 22 Seer 1961 Pr+a west Begftuarters and lies: 25X1 A t Perkin-]fi asr, the following decisions reached: a. Canera #l will be built with the existing optics awl: Is ecpecteed to be ready for test in the C-119 in December per attached schedule. b. Canasta #2 will be constructed with the revised optical system as previously submitted by P-E. c. Glass for three csaerras will be purchased, to include optics for 04aeer4 4P. 25X1 A 2. We were assured that 33.1 contimie to be closely associated with this project. 25X1 A 3. An overrun of approzinstely a forecasted acccardi to the attached cost susawy. This overrun has developed since the 3 April financial eestimstee& were submitted and in not attached to prior overruns rye apparent at that time. 25X1A 0" D M Cy 1 - C/V1/DPD (r/att.) 2 - t/DPD (v/att. ) W.TAI ACIWD -IM 6-ter/ SEC Approved For Release 2000/08/28 : CIA-RDP67B0082OR0004000200 6-2 Approved For Release 2000/08/28 : CIA-RDP67B00820R0 25X1A En,;ineering ;lanufacturin. Quality Control TOTAL LABOR OVERHEAD Purchases Raw Glass Gravel ..PRIME COST G & A TOTAL COST Fee TOTAL :c,rrnleto Completion April 3 Estimate Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020026-2 22 September 1961 Schedule - (Separate Attachment) 2. Additional Support - Contractor Action~ to Attain Schedule Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2 Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2 '. Additional Support Item Action Personnel Transfers Confirm all arrangements for transfers by September 25, 1961. optical Shop Maintain highest priority for Special Projects. Fulltime coordination for all glass in process. Facility Services, Personnel, Provide additional administrative and and Equipment clerical personnel to support technical personnel - Provide additional facility support equipment (analog computer, car, etc.). fl Purchasing Expedition Provide resident purchasing department personnel to accelerate procurement pro- cessing and vigorous liaison with vendors. Unclassified Projects Out provide engineering and manufacturing of Facility support outside of facility to accomplish unclassified areas of program. Double-Shift Manufacturing Establish number of personnel in all shops Personnel available for night shift operation when Back-up Personnel required. 25X1A 25X1A it additional back-up personnel = d0to be cleared and made available to program if required. Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2 25X1A Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2 Next 1 Page(s) In Document Exempt Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2 Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020026-2 25X1A Sr. Staff Engineers Elec. Engineers Mech. Engineers Optical Engineers Mfg. Engineers Test Engineers Additional Personnel files ui r.ri Administrative Service Designers - Draftsmen Mech. Technicians Elec. Technicians Back up Personnel to In addition to those personnel required for immediate use in the facility (Col, "A"), approximately four engineers, two technicians, and one designer will be required to support related but unclassified projects outside the facility. * Can be utilized Un-Cleared Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020026-2 Approved For Release 2000/08/28: CIA-RDP67B0082OR000400020026-2 25X1A Prime Cost through 25 August 1961 G & A through 25 August 1961 Costs through 25 August 1961 Prime Cost to Complete 25X1A Labor Material Travel Commitments Total 25X1 A G & A a Total Cost to Complete Total Cost at Completion Total Cost on Contract Overrun ** Unfunded Total Additional Funding Required 25X1A Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020026-2