PROCESSING WEEKLY REPORT FOR WEEK ENDING 10 NOVEMBER 1981
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP84-00933R000400210037-7
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 15, 2016
Document Release Date:
September 26, 2003
Sequence Number:
37
Case Number:
Publication Date:
November 10, 1981
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP84-00933R000400210037-7.pdf | 105.77 KB |
Body:
Approved Fors Lease 2003/11/06 : CIA-RDP84-00933Q900400210037-7
25X1 FROM
Deputy Director for Processing
SUBJECT: Processing Weekly Report for
. Week Ending 10 NOVEMBER 1981
25X1
25X1
NFAC Office Directors were given a tour of the SAFE Computer Center on
Operation continues running the 30 day acceptance test on the Burroughs
Computer System. Acceptance testing began on 2 November, and has been
satisfactory to date.
The online Tech Notes which are available on VM were heavily used during
25X1
the month of October according to the m-disk usage reports.
0
the duties of Processing Training officer on 16 November 1981.
RAMIS release 02.1.00 has been installed in the GC03 computer center and is
available for general user testing on both the interactive and batch systems.
Unless problems occur, it will become the production version on December 21,
25X1 1981. I
Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210037-7
25X1
25X1
Approved For (ease 2003/11/06 : CIA-RDP84-00933 600400210037-7
MVS/System Production (SP) was implemented on SY4 (3033UP) as the
production system on Thursday night, November 5. The system update contains
performance enhancements. It is the operating system that is required for the
new processor that will arrive later this month.
The Ruffing Center had an average week for applications availability, with
problems heavily concentrated on Thursday. GIMDEV lost 99 minutes due to paging
pack problems and incompleted I/O operations on two computer channels. RECON
lost 82 minutes, Thursday, due to faulty MVS software. The Batch system had 68
minutes of lost time, Thursday, due to a Telex disk controller problem, a tape
drive problem, and two IBM 3033 failures caused by a marginal IBM circuit
breaker. On Monday, GIMDEV lost 114 minutes due to apparent JES software
errors; a main storage fault in the IBM 168-3 was discovered that may have
contributed to the problems. Sunday evening, the Amdahl 470/V6 began
experiencing channel problems, which continued through Monday - the computer was
given to Amdahl for diagnostics and was down through Tuesday. The Special
Center had a substandard week. CAMS failed five times for a loss of three
hours, Wednesday, due to its software, a DBCC mistake, and an Amdahl memory
failure. STAR and NIPS also lost 48 minutes apiece when an Amdahl 470/V6 hung,
possibly due to a SPD software problem. Applications software hangs cost NIPS
2-1/2 hours Thursday. STAR lost an hour, Saturday, due to a Telex disk drive
problem. CAMS lost 81 minutes, Monday, due to an Amdahl 470/V6 console hang,
which was apparently cured by reseating some memory cards in the
computer
An OC/ODP Task Force did a line-by-line check ati on 9-10
November in order to isolate any device or line problems. They uncovered some
line problems and one or two device problems which are currently being
addressed. No major difficulties were encountered. Word Processing RFP
received its last comments from OL/PD and its last set of insertions. A final
draft is nearly completed. We still expect to release it on 20 November.
meetings with TRW the week of 16 - 20 November at the contractors Facility in
will represent Operations at the Technical Review
The projected installation date for the installation of an IBM 6670 Laser
Printer in the 4F50 Cluster Room is Monday, 16 November.
0
25X1
25X1
25X1
Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210037-7
Approved Fo lease 2003/11/06 : CIA-RDP84-0093 00400210037-7
SYSTEMS AVAILABILITY SUMMARY
MONDAY 02 NOV 1981 THRU SUNDAY 08 NOV 1981
CURRENT WEEK
PRE
VIOUS 90 DAYS
SYSTEM
02 NOV - 08 NOV
01
AUG - 01 NOV
DIFFERENCE
BATCH
98.19
98.28
-
.09
INTERACTIVE
98.85
99.11
-
.26
GIMS
99.34
96.65
+
2.69
CAMS
96.21
97.20
-
.99
OCR-COLTS
99.50
96.64
+
2.86
OCR-RECON
94.40
96.80
-
2.40
DDO-STAR
97.35
97.73
-
.38
OSWR-TADS
96.82
98.83
-
2.01
All systems with the exception of OCR-RECON reported above
the goal of 96 percent for the week. OCR-RECON experienced 2 hours
and 42 minutes of software problems and a 6 minute hardware outage.
25X1
Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210037-7