PERSONEL EQUIPMENT STAFF VISIT TO EDWARDS AND DEL RIO AFB
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP33-02415A000400350028-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
9
Document Creation Date:
December 9, 2016
Document Release Date:
March 26, 2001
Sequence Number:
28
Case Number:
Publication Date:
April 13, 1958
Content Type:
MFR
File:
Attachment | Size |
---|---|
CIA-RDP33-02415A000400350028-8.pdf | 667.4 KB |
Body:
Approved For Release 2001/04/04: CIA RDP33-0241tv90350028-8
NWOPY / of 9
P.4... __, a 7 .zrs w
13 April 1958
SUBJECT: Personal Equipment Staff Visit to Edwards and Del Rio AFB
25X1 A 1. Personnel
The P. E. personnel strength is adequate to provide occasional
short duration loan of a technician to satisfy field requirements.
Pilots-Pilot morale appeared to be good. Confidence in the pre-
sent P. E. staff was reflected.as quite acceptable. The only source
of disgruntled dissatisfaction was in the assumptions that the project
had overlooked efforts to improve their personal equipment and that
the SAC,FOG pilots were provided with equipment vastly superior to
.theirs. A visit to SAC, FOG at Del Rio revealed that the personal
equipment in use there is not superior to project equipment. Specific
topics that had instilled dissatisfaction were discussed with the pilots.
Personal equipment improvements of the past, the present and the future
contemplated projects to improve such equipment were discussed to their
satisfaction. Many of these projects are outlined in the following
paragraphs.
2. Physical Plant of P. E. Section
The P. E. pre-breathing, equipment maintenance and storage
areas to date have been lacking in space, convenience and comfort.
A project to rehabilitate these facilities was begun on 31 March 1958.
All work is to be accomplished by base A. I. 0.
Approved For Release 2001/04/04: CIA-RDP33-02415A000400350028-8
Approved For Release 2001/04/04: CIA'33-02A000400350028-8
3. Seat Ejection
All project aircraft are to be modified with ejection seats
(Hot Seat). Seat installation is to be accomplished in the field.
Weight penalty of the hot seat is fifty-three pounds. Hot seat and
present type seat (cold seat) will be interchangeable in each air-
craft. A minimum of two seat packs compatible with the hot seat
will accompany the first hot seat consigned to each field organi-
zation. Additional hot seats will be accompanied by one new type
seat pack.
The hot seat in its present form meets all requirements for
safe successful assisted aircraft evacuation. The seat, however,
lacks the feature of automatic shoulder harness lock for crash
-landing and ditching. Also, the present sequence of events after
activating the seat firing mechanism is such that the shoulder
harness locks simultaneously with firing. It is believed desirable
to have the harness rewind and lock prior to firing. These points
have been discussed with LAO engineers without actual authorization
to incorporate these two features in project seats. A compulsory
pilot familiarization and hot seat check out program will need be
pursued prior to seat utilization in field.
4. Dual Oxygen System for Aircraft
The "Hi Alt Oxygen System and Pilots' Equipment" paper dated
14 February 1958 submitted by WRSP IV pilots to Hq reference Emer-
gency Aircraft Oxygen system was discussed and found to lack certain
features necessary for a functional emergency oxygen system.
Several improvements were brought out during the discussion and
determination was made to restudy and resubmit. Modification of
the aircraft oxygen system to incorporate a separate emergency
supply is considered imperative by the pilots.
5. Seat Pack for Ejection Seat
All efforts in seat pack design for project use must be directed
towards a singular configuration for all units. This aspect of
course is but supplementary to safety, comfort and survival require-
ments already outlined in discussions and specifications dating to
-project inception.
The new seat pack will be of smaller dimensions the the pre-
sently used seat pack due to smaller dimensions of the seat pack
well in the ejection seat. This will require the local manufacture
of a light wood or metal positioning device for the new seat pack
whenever it is used in the old (cold) seat. Seats, cold or hot,
Approved For Release 2001/04/04: CIA~33-02415A000400350028-8
Approved For Rel se 2001/04/04: CIA- bP33-02 A000400350028-8
are to be interchangeable in each project assigned aircraft. The
quantity of survival gear to be carried in the new seat pack will
be less than previously carried in the old seat pack.
All hoses protruding from seat pack will do so from the left
rear corner. This will necessitate repositioning of the oxygen
regulator from placement presently recommended in the F.O.G. new
seat pack design. Regulator placement is to be in the rear
left corner with the emergency 0 cylinder against rear wall of
seat pack. The press to test will be positioned at the left
front corner of the pack midline between top and bottom of hard
pan and as close to the corner as engineering practices will
permit.
The present type aero tech quick disconnect and hose connections
will continue to be used. The ship mounted female aero tech
quick disconnect is to remain unchanged in position and type.
Acceptance of the new seat pack will not require modification
of any component system of the aircraft. LAC engineers have
subjected the components of the old seat pack to ground test
ejections. All reports have indicated adequacy and success.
An automatic method to activate the 02 supply at time of
ejection has not yet been devised to work in conjunction with the
cockpit left console ship mounted aero tech quick disconnect. In
the interim period awaiting this capability, the pilot will be
required to manually activate the emergency supply prior to ejection.
The emergency supply will not meter oxygen until eje~tion is
accomplished regardless of what time the emergency 0 supply is
alerted prior to ejection. This is a desirable feature.
The new seat pan is reported to lack comfort. The discomfort
has been considered serious enough to be noted in the aircraft
discrepancy log by the majority of pilots having used the pan in
excess of 2 hour periods. The P.E. section of WRSP-4 will determine
the exact shortcomings relative to comfort and pursue improvements
through attempts in tilting seat pack assembly, cushions, or if
necessary redesign of seat pan.
One seat pack will be modified through joint efforts of I
and WRSP-4 P.E. personnel to incorporate two each type F 2400.0
regulators enjoined to a manual regulator selector. Selections
will.per it activation of #1 or #2 or both regulaors. It has long
been the contention of the pilots than a single 0' regulator to
serve for both normal and emergency 0 purposes to be short of
desirability. It is understood that this modification will provide
Approved For Release 2001/04/04 PIA-RDP33-o2415A000400350028-8
Approved For Release 2001/04/04 A3=P33-0241500400350028-8
psychological assurance to the pilots and possibly other benefits.
It is also understood that the modification of coupling two
oxygen regulators is but an R & D effort for 1 seat pack at this
time. Weight penalty is calculated at between 30 to 40 ounces.
The new seat pack will be equipped with standard hooks for
attaching to B-5 parachute, 1 inch medium density foam rubber pad,
extending 1/2 inch forward of seat pack front edge, cloth covered
with pad to seat snaps and seat pack anti flail bailout harness.
The survival equipment pouch is to be of the present design.
6. New e Pressure Helmet (Bill Jack Helmet)
Three Bill Jack pressure helmets are to be made available
for field evaluation at WRSP IV. If this helmet proves to be an
improvement over the present project helmet, a number adequate to
equip all project pilots will be obtained. It had been reported that
the FOG pilots at Del Rio were equipped with this helmet. The trip
to Del Rio disproved this. However, Del Rio has submitted a requisi-
tion for one Bill Jack helmet per assigned pilot. Inspection of the
one prototype Bill Jack helmet at Del Rio reveals additional weight,
absence of emergency electrical face heat, positioning of the exhalat
tion valve in the area of perspiration accumulation and perspiration
absorbing material for crash padding.
25X1 A 7. Exhalation Valve
25X1A The three exhalation valve malfunctions experienced by
were due as follows:
1. Diaphragm rupture due to ozone deterioration.
2. Replacement diaphragm of improper type.
3. Same as #2.
25X1A
The manufacturer upon our request has develo ed a silicone dia- 25X1A
phragm which is ozone deterioration immune. has a supply of
these silicone diaphragm exhalation valves o equate to satisfy
all project needs. These valves will not be released until the Aero-
Medical Lab at Wright Field completes extensive tests paralleling flight
conditions. Test should be completed by mid-April.
To preclude installation of improper type exhalation valve diaphragm,
the field units have been advised to return malfunctioning valves to
depot rather than attempting field repair.
Approved For Release 2001/04/04: CI_RDP33-02415A000400350028-8
Approved For Release 2001/04/04: C 1 9 6 3-02415 00400350028-8
8. Pre-Breathing Time
Reported violations of our contract pilots decreasing the two
hour pre-breathing period recommended by Lovelace Clinic were unfounded.
The Del Rio pilots observe the two hour period as recommended. However,
it is understood that the LAC pilots are modifying this time requirement.
The two hour period must be observed prior to high flights whenever pro-
ject pilots or project equipment is involved.
9. Pressure Suit Deterioration (Armpit Area)
Pressure suits at WRSP IV and Del Rio were inspected for deter-
ioration at armpit area. Though there were no signs of rot, many of the
suits shorted signs of thread weave slippage in that area. The problem
Is not of a severity requiring immediate repair. The manufacturer has
been familiarized with this problem and research is underway.
25X1 A 10. Bladder Incident
1. Bladder was visually inspected by P. E. techs prior ship-
ment to Plattsburg.
2. All prescribed test procedures on helmet pressure test rig
were performed.
3. P. E. Techs report that they did not observe any signs of
deterioration on visual inspection and that pressure test results at
150 MM Hq with soap test revealed negative leaks.
25X1A
CONCLUSION:
1. All prescribed pre-flight test procedures were performed in
full to the satisfaction of fully qualified P. E. personnel. There are
no indications of compromise in prescribed testing procedures. There
are no indications of laxity in interest, knowledge or safety factors.
2. Though no information is available on the in-service time of
helmet bladder cover assembly, it is known that this equip-
ment was put in service by "A" camp personnel while overseas at some
time during 1957.
3. The only possible guilt that can be attributed to the P. E,
personnel is the disregard of suspicion. The bladder has been in service
for a period in excess of the time that many of like bladders provide
serviceability.
RECON ENDATIONS
1. Because the leak sites were located in areas not readily acces-
ible to visual inspection and due to the failure of the test procedures
Approved For Release 2001/04/04: CIg--RDP33-02415A000400350028-8
Approved For Rele 2001/04/04: CIA="af33-02416,AO00400350028-8
25X1A
25X1A
25X1A
to indicate leaks and deterioration, it is requested that the bladders
be removed from the helmet frame for scrutiny every 4 months or 40 hours.
(These are maximum times and the lesser figure is applicable.)
2. That a flight time, installation date, pre-flight test results
and repair log be maintained on this equipment.
3. That the least indication or even suspicion of malfunction of
any of the pilots personal equipment will require removal from service
for repair, exchange and possible U.R. or return to manufacturer with
info to headquarters.
This information has been passed'on to Air Force.
12. Seat Pack Strap Take Up Buckle.
Manufacturer installed seat pack strap take up buckles are positioned
such as to possibly hook onto cockpit accessories during bail out. It
is recommended that these clamps be turned 180 degrees maintaining clamp
hook in top position.
13. Seat Pack Pelican Quick Release Clamp.
This item reported to be in use at Del Rio actually was.only used a
few times and discarded. None will be secured for project use due to
pilot'inability to operate quick release with gloves on.
14. Pulsating Seat.
The pneumatic pulsating seat for pilot comfort is not adaptable to
the U-2. The pulsating seat requires a ship mounted actuating valve
assembly and lines from a pressurized air source. Space and weight
problems are prohibitive.
15. Hearing Los.
The Lovelace Clinic physical examination reports dated January
1958 on revealed hearing loss both ears in the middle
tone r has been fitted with ear defenders to
afford ground noise protection. The hearing loss is not limiting to
his flying duties.
16. Glare Shield.
25X1A
The face piece glare shield device installed on helmet
prior to departing Germany for New York was not fully evaluated on that
flight. Due to the aunts position aft of aircraft pilot elected to
Approved For Release 2001/04/04: G 4._ P33-02415A000400350028-8
Approved For Releas.,,2001 /04/04: -CIA-RDP33-02415A000400350028-8
remove shield shortly after take off. Glare shields have been provided
to EAFB and "B" pilots. If proven successful, this item will be made
standard equipment for project pilots and specifications will be provided
to Air Force.
17. Equipment Longevity T" Tables
Items of personal equipment constructed of materials sub-
ject to deterioration have been categorized into a table outlining
periodic inspections, type of inspection and maximum service life.`
This table is being published for project and FOG distribution.
18. lost 25X1 A 25X1 A
Spare pressure suits for and of
EAFB transferred from Germany in late 1957 have never been located.
Manufacture of pressure suits for each of these individuals has been
approved. The Clark Co. is presently fulfilling this request.
19. Fl=g_ Boots
The modified Air R?-lice type flying boot issued to project
pilots has never been fully acceptable. Consequently most of the
pilots have purchased their personal choice of flying boot and have
been reimbursed for this expense. The few pilots at EAFB still wear-
ing the modified Air Police boot are desirous of being provided with
a more comfortable and warmer type. Air Force supply has such a
boot for jet flyers. The stock number is being secured as well as
the shoe sizes of the EAFB pilots desiring this boot. Distribution
will be well. in advance of the next cold weather season.
20. Cold Weather Gloves (C :'o-und Wear)
In anticipation of cold weather operations, the pilots
have asked to be provided with mittens for ground wear. The survival
kits issued to all P. E. sections at the onset of the program con-
tained wool and leather mittens above and beyond survival requirements.
Hq will not purchase additional gloves or mittens unless a specific
request is received from the Personal Equipment Officers. An ample
supply of mittens according to Hq supply documents is on hand at
each camp.
21. Ox3rgen Connectors for Pressure Suit and Seat Pack
The engineering of the oxygen hose connectors leaves much
to be desired. Because of the possibility of improper hook-up con-
ceivably leading to inadvertent disconnect in flight, a safety lock
Approved For Release 2001/04/d -RDP33-02415A000400350028-8
Approved For Release 2001/04/04 CC4-RDP33-02415A000400350028-8
spring clip has been designed to'decrease this possibility. These spring
clips offer but partial security against disconnect and in addition offer
the undesireabilities of hook-up complications plus near impossibility
for the pilot to disconnect himself in an emergency such.as in water
survival. The connector manufacturer will be encouraged to redesign this
equipment based on more realistic considerations as well as recommendations
accumulated from the EAFB and Del Rio pilots and P.E. personnel.
Tentative designs have already been drawn.
22. Discrepancies In Breathing those Electrical Wires.
Several reports have been received from field units on electrical
shorts in the face heat and communications wires imbedded in the molded
rubber of the face piece breathing hose. Investigation showed the
cause of this problem to be due to the breakdown of the brittle nylon
wire insulation. The manufacturer has been familiarized with this
difficulty and a new insulation called "Teflon's will now be used
exclusively for insulation. "Teflon" is reported to be impervious to
cold and heat and capable of maintaining flexibility under all flight
conditions.
23. Facial Perspiration.
Excessive perspiration in the areas of face and head has not been
reported during flight. This problem appears to be one which predominates
between the time the pilot vacates the air conditioned pre-breathing
room until after take off. Attempts to control perspiration through
the use of styptic astringent compounds have proved unsuccessful. The
only true solution apparent in this case is in utilizing an air conditioned
vehicle to transfer the pilot to the cockpit. Shading the cockpit
from the sun prior and during hook-up on hot days is essential as well.
EAFB has recently equipped a pilot transfer vehicle with air conditioning
facilities. All field units operating in warm climate should be provided
with this type of vehicle.
24. In Flight Feeding.
The present face piece incorporates an orifice to permit in flight
feeding without necessitating face piece removal. Due to poor design
resulting in oxygen leakage, most flight feeding orifices have had to
be cemented shut. Though the majority of our pilots have not indicated
any particular desire to eat during flight it is still essential that
some functional in-flight feeding device be developed. Even though
the present ins-flight feeding orifice could be repaired leak free,
there is still the conflict of microphone positioning in line between
Approved For Release 2001/04/04: CIA-RDP33-02415A000400350028-8
Approved For Release 2001/041044 -CIA-RDP33-02 5A000400350028-8
mouth and orifice. Food availability as well as suitable food dis-
pensers and collapsible or pressurized containers are other items
deterrent to present day flight feeding. This entire program will
need to be restudied. The Dave Clark Co. has researched this endeavor
for several years. It will be necessary to express our present dis-
satisfactions to them in an effort to accelerate progress in this field.
25. Oxygen Regulator Factory Representatives
The F2400 oxygen regulator manufactured by the Firewell Co.
is the only oxygen regulator being used in the 1J-2. Each project
camp has been assigned a Tech Rep to maintain this equipment and only
that individual has been authorized full familiarity and repair pri-
vileges. The regulator is rapidly becoming the most widely used oxy-
gen regulator in high altitude AF aircraft. The complexity of the item
is not such as to warrant the assignment of a factory representative
to each AF base utilizing it. Though it is recommended that the pro-
ject continues to employ Firewell Tech Reps, it is felt that some.
consideration should be given to training AF personal equipment and
Physiological Trainnig airmen in its maintenance. The F2400 regu-
lator could ably be covered in the P. E. and P. T. curriculums at
Gunter AFB.
26. Ventilated Suit
The EAFB pilots had requested that the ventilated suits.
reported in use at Del Rio be studied for possible acceptance by pro-
ject. Del Rio has two types of ventilated suits. One type is built
into the partial pressure suit and is used exclusively by their B-57
pilots. The other type is a perforated plastic outer garment which
can be worn by the U-2 pilot during transfer from the pre-breathing
room to the cockpit. The purpose of the suit is to provide comfort-
able temperature environment. With the advent of the air conditioned
transfer vehicle or operations in cool climates, the outer garment
ventilated suit will be of no value. In the absence of an air con-
ditioned transfer vehicle or aircraft air conditioning malfunction
in flight, the ventilation modified partial pressure suit could be of
value. To realize this benefit would require extensive modification
of project pressure suits or purchase of new ones as well as modi-
fication of the ' aircraft to facilitate conditioned air piping to the suit.
25X1A
Aviation Physiologist
PS/DCI/RJT:bb