PROCESSING WEEKLY REPORT FOR WEEK ENDING 23 DECEMBER 1981

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP84-00933R000400210009-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 15, 2016
Document Release Date: 
September 26, 2003
Sequence Number: 
9
Case Number: 
Publication Date: 
December 23, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP84-00933R000400210009-8.pdf93.12 KB
Body: 
Approved For$elease 2003/11/06 : CIA-RDP84-0093-- 000400210009-8 MEMORANDUM FOR: Director of Data Processing Deputy Director for Processing SUBJECT: Processing Weekly Report for Week Ending 23 DECEMBER 1981 PROCESSING WEEKLY REPORT FOR 23 DECEMBER 1981 In the Ruffing Center on Wednesday, all OCR applications lost 135 minutes due to a failure of an IBM tape controller. The controller then hung an I/O channel causing a loss of the Batch system for 25 minutes. RECON lost 80 minutes more Wednesday due to a bad card in an IBM disk drive. On Monday, faulty COMTEN hardware caused a 15 minute loss to VM and one of 73 minutes to GIMPROD, COLTS lost 154 minutes, Monday, following an error on a CDC disk drive. All OCR applications lost 25 minutes, Monday, because of a problem in the Access Control Facility software. A somewhat below average week. In the Special Center, CAMS lost 50 minutes, Thursday, when an IBM disk drive failed, followed by a mistake in moving a disk pack between banks. A problem with either an Amdahl 70 channel, or a disk controller in an IBM 370/158, caused 102 lost minutes for TPSTAR on Thursday. CAMS hung Wednesday for 104 minutes in the course of cabling work being done. A few other lost time problems were encountered that had minor effects. Word Processing RFP - Forty-six vendor questions have been Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210009-8 Approved Foi elease 2003/11/06 : CIA-RDP84-0093=. 000400210009-8 answered and forwarded to OL/PD. Twelve vendors have, thus far, expressed interest in bidding. Status of Delta Data Terminal - All bugs reported as of 12/2/81 have been corrected. Representatives of SPD and ED met with Delta Data to finalize plans for the final release which is due 15 January 1982. A set of PROMSDwas delivered December 1981 for testing prior to attempting some speed enhancements. We have scheduled a two day trip to Delta Data on 11-12 January 1982. Ramis release 2.1 has been made the production version of RAMIS in the batch and interactive environments of the Ruffing and Special Centers. Development and testing continued through the past week on the new IBM 3081 Processor as an MVS/JES3 standalone Global. IBM conducted two training sessions for the Operations, System Programming and Engineering Divisions. SYSTEMS AVAILABILITY SUMMARY MONDAY 14 DEC 1981 THRU SUNDAY 20 DEC 1981 25X1 25X1 SYSTEM DIFFERENCE CURRENT WEEK 14 DEC - 20 DEC PREVIOUS 90 DAYS 13 SEP - 13 DEC BATCH 99.58 98.12 + 1.46 INTERACTIVE 99.24 98.21 + 1.03 GIMS 96.87 96.01 + .86 CAMS 97.68 98.19 .51 OCR-COLTS 82.77 93.81 11.04 OCR-RECON 76.64 93.77 17.13 DDO-STAR 98.13 96.27 + 1.86 OSWR-TADS 99.28 98.61 + .67 Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210009-8 Approved For?$elease 2003/11/06 : CIA-RDP84-0093300400210009-8 . OCR-COLTS and OCR-RECON both reported below the goal of 96 percent for the week with each application recording outages due to hardware, software, and procedural problems. - OCR-COLTS experienced 4 hours and 49 minutes of hardware outages a 2 hour and 30 minute TB procedural problem, and 1 hour and - OCR-RECON had 7 hours of hardware outages, 2 hours and 47 minutes of procedural problems, and 1 hour and 53 minutes of software errors. 25X1 Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210009-8