KH-4 MISSION 1035 21-30 SEPTEMBER 1966 PART I

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP99T01396R000200110001-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
69
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 17, 2002
Sequence Number: 
1
Case Number: 
Publication Date: 
October 1, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP99T01396R000200110001-9.pdf2.23 MB
Body: 
4 VSE C elease 2002/02/27: CIA-R77' T PHOTOGRAPHIC INTERPRETATION REPORT KH-4 MISSION 103! 21-30 SEPTEMBER 1966' TCS-80939!66 OCTOBER 1966 copy 195 61 PAGES Declass Review by NIMA/DOD Approved For aSt ffl 2/27: CIA-RDP99TO1396R0 200110001-9 25X1A Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9 Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9 For ReleaseTTe2/$Ei2REt1 00200110001-_ f~265X1A MISSION 1035, 21-30 SEPTEMBER 1966 TABLE OF CONTENTS PREFACE HIGHLIGHTS MISSILES AIR FACILITIES NUCLEAR ENERGY NAVAL ACTIVITY/PORTS ELECTRONICS/COMMUNICATIONS MILITARY ACTIVITY COMPLEXES OTHER ACTIVITY ATTACHMENTS 25X1A Approved For Releas p2/9F RE or Releas1`~ CC rrpp~~T 0002001 10 25X1A //~~0DD021~2/PT- 00+ 9S-80939166 MISSION 1035, 21-30 SEPTEMBER 1966 OAK SUPPLEMENT - PART I KH-4 MISSION 1035 THIS IS THE FIRST OF SF,VERAL OAK SUPPLEMENTS ON MISSION 1035 AND PROVIDES INFORMATION ON THE COMMITTEE ON OVERHEAD RECONNAISSANCE (COMER) TARGETS NOT INCLUDED IN THE OAK REPORTS FOR THIS MISSION. THIS REPORT ALSO CONTAINS PREVIOUSLY REPORTED NON-COMDR TARGETS RE- FLECTING SIGNIFICANT CHANGE, TARGETS WITH SIGNIFICANT ORDER OF BATTLE (OB) INFORMATION, AND TARGETS WHICH ARE EITHER NEWLY IDENTI- FIED OR KNOWN BUT REPORTED FOR THE FIRST TIME BY NPIC,. TARGETS ARE ARRANGED BY SUBJECT AND WITHIN EACH SUBJECT BY COMOR TARGET NUMBER. PREVIOUSLY REPORTED NON-COMDR TARGETS ARE LISTED UNDER THE APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS. NEWLY REPORTED TARGETS ARE DESIGNATED AS BONUS TARGETS AND ARE LISTED AFTER THE NON-COMER TARGETS. LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY CODE AND THE COORDINATES. FOR THE CONVENIENCE OF THE USER, AN ALPHABETIC LISTING OF COUNTRY CODES IS INCLUDED ON THE INSIDE OF THE BACK COVER. SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET FOLLOW THE DESCRIP- TION OF THE TARGET. PASS NUMBERS, SUFFIXED WITH A FOR ASCENDING AND D FOR DESCENDING, ARE LISTED FIRST, FOLLOWED BY THE FRAME NUM- BERS. SYMBOLS FOR LIMITING CONDITIONS AFFECTING PHOTOGRAPHY ARE C (CLEAR), SC (SCATTERED CLOUD COVER), HC (HEAVY CLOUD COVER), H (HAZE), CS (CLOUD SHADOW), S (SNOW), 0 (OBLIQUITY), SD (SEMIDARK- NESS), D (DARKNESS), GC (GROUND COVER), CF (CAMOUFLAGE), AND GR (GROUND RESOLUTION). INTERPRETABILITY OF THE PHOTOGRAPHY IS CATEGO- RIZED AS G (GOOD), F (FAIR), OR P (POOR). THE EXTENT OF PHOTOGRAPH- IC COVERAGE IS DENOTED BY THE SYMBOLS T (TOTAL) OR PT (PARTIAL). THE MODE OF COVERAGE IS INDICATED BY ST (STEREO), PS (PARTIAL STER- EO), OR NS (NON-STEREO). IF A TARGET CAN BE IDENTIFIED ONLY (I00), JUST THE TARGET NAME, PASS AND FRAME NUMBERS, AND IDO WILL APPEAR. RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF PHOTOGRAPHY IS ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEM- ERIS DATA. CONSEQUENTLY, FUTURE ANALYSIS MAY RESULT IN MINOR ALTER- ATIONS. MOREOVER, RECIPIENTS ARE CAUTIONED THAT THE IDENTI- FICATION OF TARGETS IS BASED PRIMARILY ON PHOTOGRAPHY AND DOES NOT CONSTITUTE A FINISHED INTELLIGENCE JUDGMENT. FOR THE CONVENIENCE OF THE USER, AN INDEX TO ALL TARGETS IN THE 25X1A 2 Approved For Release .9 /gt=R T48o2cTc 000200110001-9 25X1 A d For Releas TCS-80939/66 MISSION 1035, 21-30 SEPTEMBER 1966 SUPPLEMENT IS INCLUDED IN THE FINAL EDiTION~ FOR TRACK MAPS, SEE TCS-80936/66 THROUGH 80938/66, THE OAK REPORTS FOR THIS MISSION. 25X1A Approved For Release '27R Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9 Highlights Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9 or ReleaslWA4 T 25X1 A R0002001 10001-9T CS--80939 / bb MISSION 1035, 1-30 SEPTEMBER 1966 1. AIR ACTIVITY AN AIRFIELD IN AN EARLY STAGE OF CONSTRUCTION, CONSISTING OF AN 8,200 X 200 FT NE/SW RUNWAY AND PARALLEL TAXIWAY, IS NEWLY IDENTIFIED 4.8 NM NW OF CHAGAROTAR. 2. NUCLEAR ENERGY ACTIVITY CONSTRUCTION OF THE CORRIDOR INTERCONNECTING CASCADE BUILDINGS C AND 0 AT AREA 2 ZAOZERNYY ATOMIC ENERGY COMPLEX, HAS COMMENCED SINCE SCARRING SE OF CASCADE BUILDING C, VISIBLE ON IS NOW AN EXCAVATION APPROXIMATELY 515 X 250 FT WITH FOUNDATION TRENCHING FOR A NEW BUILDING. TALL KING ANTENNAS ARE NEWLY IDENTIFIED AT THE FOLLOWING 6 AREAS IN THE USSR -- NOVYY VASYUGAN, PODKAMENNAYA TUNGUSKA, MANGUT, URGAL, LENINSKOYE, AND SAGIZ. THIS SUPPLEMENT REPORTS ON 229 COMOR TARGETS AND 16 NON-COMDR TARGETS. 25X1A Approved For Release 2002/42! - Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9 Missiles Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9 IQBO .? 00200110001- 25X1 A For Releas ~CS-80939/66 MISSION 1035,.21-30 SEPTEMBER 1966 25X1A MISSILES THE CENTER IS COVERED ON ONE PASS OF STEREO PHOTOGRAPHY WITH FAIR-TO-GOOD INTERPRETABILITY. SEE TCS-80937/66, PART II OF THE OAK FOR MISSION 1035-1, FOR FURTHER DETAILS. WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY PHOTOGRAPHIC REFERENCES ARE LISTED, AT PAD Al, A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE RAIL JUST TO THE REAR OF THE PAD AND A STRING OF RAIL CARS AND 2 OTHER CARS ARE ON THE TRACK FARTHER TO THE REAR. AT PADS AZ AND A3, 2 LONG VEHICLES/PIECES OF EQUIPMENT ARE ON THE RAILS TO THE REAR OF PAD A3 AND AT LEAST 5 OTHER RAIL CARS ARE ON THE TRACK TO THE REAR OF PAD A2. AT LAUNCH PAD 81, THE ARMS OF THE SERVICE TOWER OVERHANG THE FLAME PIT ON BOTH SIDES OF THE PAD. AT LEAST 9 RAIL CARS ARE AT VARIOUS POINTS ON THE RAILS TO THE REAR OF PAD 6l AND I LONG RAIL CAR OR 2 SHORT RAIL CARS ARE ON THE RAILS JUST EAST OF THE LARGEST CHECKOUT BUILDING. AT LAUNCH AREA 82, 1 LONG AND 3 SHORT VEHICLES/PIECES OF EQUIPMENT ARE ON THE PAD, SEVERAL VEHICLES/PIECES OF EQUIPMENT ARE PARKED ON EACH OF THE HARDSTANDS NW AND SW OF THE PAD, AND ANOTHER IS PARKED IN FRONT OF THE READY BUILDING. 25X1A Approved For Release ,2,Q0.2/O R For ReleaseT2042WCI 00200110001- 25X1A IC S-80939/66 MISSION 1035v 21-30 SEPTEMBER 1966 25X1A A PROBABLE MISSILES APPROXIMATELY 95 FT HIGH, IS ERECTED ON EACH OF THE 3 LAUNCH PADS AT PAD C2, 2 LONG VEHICLES/PIECES OF EQUIPMENT ARE PARKED ON THE PAD, ONE IMMEDIATELY NORTH AND ONE SOUTH OF THE CENTER OF THE PAD. AT PAD C3, A LONG VEHICLE/PIECE OF EQUIPMENT IS PARKED JUST SOUTH OF THE CENTER OF THE PAD AND A SHORTER ONE IS PARKED AT THE SOUTH END OF THE PAD. A STRING OF SHORT RAIL CARS AND 2 OTHER VEHICLES/PIECES OF EQUIPMENT ARE ON THE RAILS/ROAD BETWEEN PADS Cl AND C2. APPROXIMATELY 10 VEHICLESIPIECES OF EQUIPMENT ARE PARKED IN THE SW CORNER OF THE LAUNCH AREA. THE NORTHERNMOST ARCH-ROOFED BUILDING 1 NM WEST OF THE SUPPORT FACILITY APPEARS TO BE COMPLETELY EARTH MOUNDED ONE LONG AND SEVERAL SHORTER STRINGS OF RAIL CARS ARE IN THE COMPLEX SUPPORT FACILITY. AT DI, THE CENTER SILO APPEARS TO BE PARTIALLY OPEN. ONE VEHICLEIPIECE OF EQUIPMENT IS ON THE LOOP ROAD FORWARD OF THE CENTER SILO AND ANOTHER IS PARKED IMMEDIATELY OFF THE LOOP ROAD NEARBYa AT D2 A POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE LOOP ROAD FORWARD OF THE CENTER SILO AND A LONG VEHICLE/PIECE OF EQUIPMENT IS IN FRONT OF THE NORTHERN MISSILE-READY BUILDING. THREE VEHICLES/PIECES OF EQUIPMENT ARE PARKED OFF THE LOOP ROAD EAST OF THE RIGHT SILO ON THE LEFT SILO DOOR IS OPEN AND 3 LONG VEHICLES/PIECES OF EQUIPMENT ARE PARKED OFF THE LOOP ROAD EAST OF THE RIGHT SILO ON 25X1 D 25X1A Approved For Release (12/0212 O d For ReleasIY0021WET 00020011000115-8O9 MISSION 1035, 21-30 SEPTEMBER 1966 25X1A 9/66 25X1A G1-G2 A DITCH HAS BEEN DUG PARALLEL TO THE INNER FENCE LINE ALONG THE EAST SIDE OF THE LAUNCH AREA TO A POINT'FOR.WARD OF THE LAUNCH AREAS JUST OUTSIDE OF THE SECURITY FENCE. NO OTHER SIGNIFICANT CHANGE OBSERVED SINCE G3-G4 -- A BUILDING HAS BEEN CONSTRUCTED JUST EAST OF THE LONGER OF THE 2 BUILDINGS ON THE EAST SIDE OF THE ACCESS ROAD NEAR THE CENTER OF THE LAUNCH AREA. IT IS PARALLEL TO AND APPROXIMATELY THE SAME LENGTH AS THE ORIGINAL BUILDING. FIRST EVIDENCE OF THIS BUILDING IS VISIBLE ON NO OTHER SIGNIFICANT CHANGE OBSERVED. ON AN OBJECT, POSSIBLY THE ERECTING MECHANISM, IS STANDING IN A VERTICAL POSITION ON PAD G4 AND A SHORT STRING OF RAIL CARS IS ON THE APRON TO THE REAR OF THE PAD. G5-G6 -- A LIGHT-TONED PROBABLE CYLINDER, APPROXIMATELY 6 FT LONG, HAS BEEN ADDED TO THE LINE OF 23 DARK-TONED CYLINDERS ALONG THE EAST FENCE LINE REPORTED ON MISSION NO OTHER SIGNIFICANT CHANGE OBSERVED. 25X1 B 25X1A Approved For Release IWOE1' 25X1 A For Releases QUP02MW 00200110001A5_ 80939 /66 5X1 A MISSION 1035, 21-30 SEPTEMBER 1966 25X1A TYURATAM LAUNCH COMPLEX H UR 4559N 06342E THREE VEHICLES/PIECES OF EQUIPMENT ARE ON THE PAD AT H2 AND APPROXIMATELY 6 OTHERS ARE LOCATED IN AND ABOUT THE LAUNCH AREA. 25X1 D TYURATAM LAUNCH GROUP I (SITES I1, 12, 13) UR 4555N 06326E AT SITE 1I, THE SILO DOOR IS OPEN AND ONE LONG AND ONE SHORT VEHICLE/PIECE OF EQUIPMENT ARE ON THE APRON NORTH OF THE SILO. AT SITES 12 AND I3, FEW SIGNS OF ACTIVITY ARE OBSERVED. THE SILO HEADWORK IS NOT YET PRESENT. 25X1 D TYURATAM LAUNCH GROUP I (SITE 14) UR 4554N 06320E THE SILO DOOR IS OPEN AND A SMALL VEHICLE/PIECE OF EQUIPMENT IS PARKED AT THE SILO. APPROXIMATELY 4 VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON JUST SE OF THE SILO AND A GROUP OF APPROXIMATELY 12 OTHERS IS PARKED SEVERAL HUNDERED FEET SE OF THE SILO. 25X1 D TYURATAM LAUNCH GROUP I (SITES 15, 16) UR 4559N 06333E 15 -- 1 POSSIBLE, SMALL VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NORTH OF THE SILO. 16 -- FEW SIGNS OF ACTIVITY OBSERVED. THE SILO HEADWORK IS NOT YET PRESENT. 25X1D TYURATAM LAUNCH COMPLEX J 25X1 D 25X1A Approved For Release-2D(12 1 For Release90027Q2 :T ~000200110001-PCS_80 MISSION 1035, 21-30 SEPTEMBER 1966 THE SILO DOOR IS CLOSED AND A SMALL POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NORTH OF THE SILO AT SILO K1 ON THE SILO DOOR IS OPEN AT SILO K2. A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON AT THE SILO AND A TALL OBJECT IS ERECTED OVER THE SILO. ONE SHORT AND ONE LONG VEHICLE/PIECE OF EQUIPMENT ARE ON THE APRON NORTH OF THE SILO. ONE VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NORTH OF SILO K1, SEVERAL ARE ON THE APRON AROUND SILO K29 AND AN UNDETERMINED NUMBER IS IN THE SE CORNER OF THE LAUNCH AREA ON SEVERAL SMALL POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE LOCATED AT VARIOUS POINTS WITHIN THE LAUNCH AREA ON AND AN UNDETERMINED NUMBER OF VEHICLES/PIECES OF EQUIPMENT IS OBSERVED ON 25X1 D THE DITCH PREVIOUSLY REPORTED PARALLEL TO THE SOUTH AND WEST FENCE LINES HAS BEEN JOINED. THE PORTION ALONG THE WEST FENCE LINE HAS BEEN EXTENDED TO THE WEST OF SITE LI. AND TO A POINT WEST OF THE G3-G4 ACCESS ROAD. TWO SMALL POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE PARKED OFF THE GRADED ACCESS ROAD EAST OF THE SILO ON 25X1A 9/66 25X1A A POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NEAR THE SILO ON 25X1A Approved For Release 1 V2/JMET 25X1 A For Release'2K/UI/E1I 25X1 A 00110001 4 MISSION 1035, 21-30 SEPTEMBER 1966 25X1 D 25X1p 25X1 D 25X1 D 25X1 D 25X1A TYURATAM-LAUNCH GROUP L (SITE 1.5) UR 4559N 06257E TYURATAM LAUNCH GROUP L (SITE L6) UR 4601N 06253E TYURATAM LAUNCH GROUP L (SITE L7) UR 4605N 06255E A LONG VEHICLE/PIECE IS ON THE GRADED ACCESS ROAD SOUTH OF THE APRON. 25X1 D 25X1 D TYURATAM LAUNCH GROUP L (SITE L8) UR 4601N 06307E ON BOTH PASSES, A LONG VEHICLE/PIECE OF EQUIPMENT IS PARKED ATTHE SILO AND A TALL OBJECT, APPROXIMATELY 65 FT HIGH, IS ERECTED OVER THE SILO. ONE SMALLER VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON SE OFTHE SILO. 25X1A 1 Approved For Release /SI 25X1A TAP 92W-T 25X1A For Releas 0 CI 000200110001- 7 S-80939l66 MISSION 1035, 21-30 SEPTEMBER 1966 25X1A TYURATAM LAUNCH GROUP L (SITE L9). UR 4558N 06306E ONE SMALL, POSSIBLE VEHICL EQUIPMENT IS ON THE APRON NEAR THE SILO ON A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON AT THE SILO AND A TALL OBJECT IS ERECTED OVER THE SILO ON PASS 25X1.D 25X1 D 25X1 D TYURATAM LAUNCH GROUP L (SITE L10) UR 4557N 06301E TYURATAM LAUNCH GROUP M (SITE MI) UR 4603N 06302E FEW, IF ANY, SIGNS OF ACTIVITY ARE OBSERVED. THE SILO HEADWORKS ARE STILL NOT PRESENT. 25X1 D TYURATAM LAUNCH GROUP M (SITE M2) THE SILO HEADWORK IS NOT YET PRESENT. 25X1 D TYURATAM LAUNCH GROUP M ISITE M3) THE SILO HEADWORK IS NOT YET PRESENT. 25X1 D TYURATAM LAUNCH GROUP N (SITE NI) UR 4602N 06303E A VEHICLEIPIECE OF EQUIPMENT APPROXIMATELY 65 FT LONG IS PARKED A AND A TALL OBJECT IS ERECTED OVER 25X1D THE SILO ON A SHORT VEHICLEIPIECE OF EQUIPMENT IS ON THE RON NORTH OF THE SILO. 25X1A 1 Approved For Release WI ER 25X1A 25X1A d For ReleaseT2[r021Q2)Tl 00200110001-9 MISSION 1035, 21-30 SEPTEMBER 1966 A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NEAR 25X1D THE SILO ON 25X1 D 25X1A ONE SMALL POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE 25X1D APRON NEAR SILO N2 ON THE SILO DOOR AT N2 APPEARS TO BE OPEN AND A POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NEARBY ON 25X1 D 25X1 D THE COMPLEX SUPPORT FACILITY AND LAUNCH SITES I AND 2 ARE COVERED BY CLEAR PHOTOGRAPHY. THE TRANSFER POINT IS OBSCURED BY CLOUDS AND LAUNCH SITE 3 IS OBSERVED ON NON-STEREO PHOTOGRAPHY THROUGH HAZE AND SCATTERED CLOUD,. WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY PHOTOGRAPHIC REFERENCES ARE LISTED. 25X1 D 25X1 D 25X1A Approved For Release "FOSKR 12 For Releas qe 02 SECRET C 0110001- 25X1A '-80939/66 MISSION 1035, 21-30 SEPTEM~ 25X1A SHADRINSK ICBM LAUNCH SITE 2 UR 5609N 06402E THE RIGHT SILO DOOR IS IN THE OPEN POSITION. TWO POSSIBLE MISSILES ARE IN FRONT OF THE RIM BUILDINGS. SHADRINSK ICBM LAUNCH SITE 3 UR 5606N 06356E NOVOSIBIRSK ICBM COMPLEX UR 5.515N 08259E APPROXIMATE WESTERN 60 PERCENT OF THE SEARCH AREA, INCLUDING THE ENTIRE COMPLEX, IS OBSERVED ON ONE PASS OF STEREO PHOTOGRAPHY. NO NEW MISSILE FACILITIES OBSERVED IN THE CLOUD-FREE PORTIONS OF THE SEARCH AREA COVERED. WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY PHOTOGRAPHIC REFERENCES ARE LISTED. NOVOSIBIRSK ICBM LAUNCH SITE I UR 5518N 08301E NOVOSIBIRSK ICBM LAUNCH SITE 2 UR 5519N 083.10E NOVOSIBIRSK ICBM LAUNCH SITE 3 UR 5523N 08255E NOVOSIBIRSK ICBM LAUNCH SITE 4 UR 5522N 08313E 25X1A Approved For Release I VWO3 R TOP SECRET 25X10 For Release 2002/02/27: C 2 0110001 ~CS-80939i625X1A MISSION 10359 21-30 SEPTEm 9b NOVOSIBIRSK ICBM LAUNCH SITE 5 KOZELSK ICBM COMPLEX UR UR 5519N 5356N 08256E 03549E THE EAST PORTION OF THE COMPLEX IS COVERED BY PHOTOGRAPHY ON ONE PASS. THE AREA IS OBSCURED BY-HEAVY CLOUDS, AND SITES 3, 4, TRANSFER POINT ARE THE 11, ONLY 22, 239 AND PART IDENTIFIABLE ICBM OF THE ACTIVITIES. NO DETERMINATION OF CONSTRUCTION STATUS ON TYPE IIID SITES 11, 22, AND 23 CAN BE MADE. WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL: COMPLEX TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY PHOTOGRAPHIC REFERENCES ARE LISTED. KOZELSK ICBM LAUNCH SITE 3 UR 5354N 03545E KOZELSK ICBM LAUNCH SITE 4 UR 5353N 03551E KOZELSK ICBM LAUNCH SITE 11 UR 5353N 03543E KOZELSK ICBM LAUNCH SITE 22 UR 5349N 03541E THE CONSTRUCTION STAGE-:IS UNDETERMINED. KOZELSK ICBM LAUNCH SITE 23 UR 5340N 03546E THE CONSTRUCTION STAGE: IS UNDETERMINED. 25X1A Approved For Release. 2/gME 25X1A d For Releass2b021QZ/ZTT - R000200110001T &S-80939/66 MISSION 1035, 21-30 SEPTEMBER 1966 25X1D 25X1A ALEYSK. ICBM COMPLEX UR 5229N 08243E THE COMPLEX IS COVERED BY'ONE:PASS OF PHOTOGRAPHY. SEVENTEEN LAUNCH SITES CLEAR (INCLUDING 2 SITES 25X1 D NEWLY IDENTIFIED ON THIS MISSION), THE TRANSFER POINT, AND THE COMPLEX FACILITY ARE OBSERVED. SEE TCS-80937/66, PART II OF THE OAK FOR FOR FURTHER DETAILS. WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT. NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY PHOTOGRAPHIC REFERENCES ARE LISTED. 25X1 D ALEYSK ICBM LAUNCH SITE I UR 5227N 08235E 25X1 D ALEYSK ICBM LAUNCH SITE 2 UR 5230N 08240E 25X1 D ALEYSKICBM LAUNCH SITE 3 UR 5233N 08242E 25X1 D ALEYSK ICBM LAUNCH SITE 5 UR 5235N 08230E 25X1 D ALEYSK ICBM LAUNCH SITE 6 UR 5236N 08235E LAUNCH SITE 6 IS NOW COMPLETE. 25X1 D 25X1A Approved For Release. 2// {27,Ey For Releasj 02WC 000200110001- .FS-80939/6 MISSION 1035, 21-30 SEPTEMBER 1966 25X1A THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION. ALEYSK ICBM LAUNCH SITE 8 UR 5218N 08249E THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION. ALEYSK ICBM LAUNCH SITE 9 UR 5215N 08238E THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION. ALEYSK ICBM LAUNCH SITE 10 UR 5210N 08235E THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION. ALEYSK.ICBM LAUNCH SITE 11 UR 5212N 08243E THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION. ALEYSK ICBM LAUNCH SITE 12 UR 5233N 08234E THE SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. ALEYSK ICBM LAUNCH SITE 13 UR 5220N 08241E THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION. 25X1A Approved For Release 'R For Release9t . 2 : 000200110001-I9r- S-809 MISSION 1035, 21-30 SEPTEMBER 1966 ALEYSK ICBM LAUNCH SITE 14 UR 5228N 08240E THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION, ALEYSK ICBM LAUNCH SITE 15 UR 5222N 08256E THE SITE REMAINS IN AN EARLY STAGE OF CONSTRUCTION. 25X1A /66 25X1A ALEYSK ICBM LAUNCH SITE 16 UR 5228N 08254E THE SITE REMAINS IN AN EARLY STAGE OF CONSTRUCTION. ALEYSK ICBM COMPLEX SUPPORT FACILITY UR 5229N 08243E ALEYSK ICBM RAIL-TO-ROAD TRANSFER POINT UR 5228N 08242E KAPUSTIN YAR SAM LAUNCH COMPLEX UR 4848N 04545E THE COMPLEX IS COVERED ON PARTIAL STEREO PHOTOGRAPHY WITH FAIR-TO-POOR INTERPRETABILITY. HEAVY-TO-SCATTERED CLOUD COVER PRECLUDES INTERPRETATION OF APPROXIMATELY 60 PERCENT OF THE SAM LAUNCH COMPLEX. NO SIGNIFICANT CHANGES ARE OBSERVED. THERE ARE NO APPARENT CHANGES SINCE AT PRECISION TRACKING RADAR SITE, PROBABLE LONG RANGE SAM LAUNCH AREA, SA-1 LAUNCH AREA, SA-1 AND R&D YOYO AREAS, SAM HOUSING AND SUPPORT AREA, THE SAM WARHEAD AREA, AND INSTRUMENTATION SITES 1,2,3,4,. AND 5. AT THE R&D LAUNCH AREA, THERE IS NO SIGNIFICANT CHANGE EXCEPT AT LAUNCH SITE F, WHERE THERE APPEAR TO BE FEWER VEHICLES/PIECES OF EQUIPMENT THAN WERE OBSERVED ON Approved For ReleaselOr2/SEIRET 25X1 D 25X1A 25X1A AT SAM TRAINING SITES A,B, AND C, THE LAUNCH AREAS DO NOT APPEAR TO BE OCCUPIED BY.ANY MISSILES OR VEHICLES/ PIECES OF EQUIPMENT. SITE A WAS OCCUPIED BY VEHICLES/PIECES OF EQUIPMENT IN THE CENTRAL GUIDANCE AREA ON SITES B AND C WERE NOT COVERED 25X1 D 25X1 D INSTRUMENTATION SITES 6,7, AND 9, SAM CHECKOUT AND STORAGE AREA, .SA-2 LAUNCH AREA, AND THE SA-3 LAUNCH AREA CAN BE IDENTIFIED ONLY. THE REMAINDER OF THE SAM LAUNCH COMPLEX IS CLOUD COVERED. 25X1D 25X1A 25X1 D NO NEW CONSTRUCTION OR CHANGES IN FACILITIES OBSERVED SINCE IN THE OPERATIONS AREA. AT LAUNCH POSITION B-4, A PROBABLE GALOSH CANISTER IS IN THE ERECTOR BUT NOT ERECTED. THREE VEHICLES/PIECES OF EQUIPMENT ARE PARKED JUST SOUTH OF THE ERECTOR. AT INSTRUMENTATION SITE B-1, 5 POSSIBLE ELECTRONIC VANS ARE NOW PARKED ALONG THE NORTH PERIMETER OF THE SITE. ONLY 3 VANS WERE PRESENT ON 25X1D 25X1 D IN THE COMPLEX SUPPORT AREA, 3 BARRACKS/STORAGE BUILDINGS HAVE BEEN DISMANTLED SINCE TWO SMALL POSSIBLE BARRACKS HAVE BEEN CONSTRUCTED For Release R2199`CI 0200110001-jC S-80939/66 IH MISSION 1035, 21-3 P.WP966 25X1D SINCE 25X1 D 25X9. 25X1 D VLADIMIR SUBMARINE BASE UR 4356N 13528E OB - 5 SS, 1 PROBABLE MSF, AND 1 YAGT. NO MISSILE STORAGE OBSERVED. 25X9 NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D Approved For Release yof/Q 7, 1 25X1 A ReI po 2~ s_ 3 ,25X1 A d Fo I S 5e~1 i 9~fi~s 0110001- 2:A SEVASTOPOL NAVAL MISSILE STORAGE FACILITY UR 4436N 03340E NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. PETROVKA SHIPYARD UR 4307N 13220E OB -- 1 POSSIBLE LARGE SS, 3 POSSIBLE DO, AND 1 UNIDENTIFIED SMALL VESSEL ON REPAIR WAYS AND 1 PROBABLE DD AND B UNIDENTIFIED VESSELS AT PIERS AND QUAYS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ZALIV STRELOK SUBMARINE BASE PAVLOVSKOGO UR 4252N 13232E OB 4 SS AND 3 AUXILIARIES. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ZALIV STRELOK NAVAL MSL STAR PAVLOVSKOGO UR 4254N 13234E NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1A 1 Approved For Release ' /w" T SCRE -B39~625X1A For Release 02 R0002200110001 S 5X1 A MISSION 1035,.21-30 SEPTEMBER 19+56 DUNAY SUBMARINE BASE BUKHTA KONYUSHKOVA UR 4252N 13222E SEVASTOPOL NVL B & SHPYD SEVMORZAVOD 497 UR 4436N 03332E OB -- AT SHIPYARD AND NAVAL BASE -- 1 CL, 1 DLG, 9 DD, 9 MEDIUM SS (2 IN DRYDOCK),. i