KH-4 MISSION 1035 21-30 SEPTEMBER 1966 PART I
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP99T01396R000200110001-9
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
69
Document Creation Date:
December 28, 2016
Document Release Date:
January 17, 2002
Sequence Number:
1
Case Number:
Publication Date:
October 1, 1966
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 2.23 MB |
Body:
4 VSE C elease 2002/02/27: CIA-R77'
T
PHOTOGRAPHIC INTERPRETATION REPORT
KH-4 MISSION 103!
21-30 SEPTEMBER 1966'
TCS-80939!66
OCTOBER 1966
copy 195
61 PAGES
Declass Review by NIMA/DOD
Approved For aSt ffl 2/27: CIA-RDP99TO1396R0 200110001-9
25X1A Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9
Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9
For ReleaseTTe2/$Ei2REt1 00200110001-_ f~265X1A
MISSION 1035, 21-30 SEPTEMBER 1966
TABLE OF CONTENTS
PREFACE
HIGHLIGHTS
MISSILES
AIR FACILITIES
NUCLEAR ENERGY
NAVAL ACTIVITY/PORTS
ELECTRONICS/COMMUNICATIONS
MILITARY ACTIVITY
COMPLEXES
OTHER ACTIVITY
ATTACHMENTS
25X1A
Approved For Releas p2/9F RE
or Releas1`~ CC rrpp~~T 0002001 10 25X1A
//~~0DD021~2/PT- 00+ 9S-80939166
MISSION 1035, 21-30 SEPTEMBER 1966
OAK SUPPLEMENT - PART I
KH-4 MISSION 1035
THIS IS THE FIRST OF SF,VERAL OAK SUPPLEMENTS ON MISSION 1035
AND PROVIDES INFORMATION ON THE COMMITTEE ON OVERHEAD RECONNAISSANCE
(COMER) TARGETS NOT INCLUDED IN THE OAK REPORTS FOR THIS MISSION.
THIS REPORT ALSO CONTAINS PREVIOUSLY REPORTED NON-COMDR TARGETS RE-
FLECTING SIGNIFICANT CHANGE, TARGETS WITH SIGNIFICANT ORDER OF
BATTLE (OB) INFORMATION, AND TARGETS WHICH ARE EITHER NEWLY IDENTI-
FIED OR KNOWN BUT REPORTED FOR THE FIRST TIME BY NPIC,.
TARGETS ARE ARRANGED BY SUBJECT AND WITHIN EACH SUBJECT BY COMOR
TARGET NUMBER. PREVIOUSLY REPORTED NON-COMDR TARGETS ARE LISTED
UNDER THE APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS.
NEWLY REPORTED TARGETS ARE DESIGNATED AS BONUS TARGETS AND ARE
LISTED AFTER THE NON-COMER TARGETS. LOCATIONS OF TARGETS IN THIS
REPORT ARE INDICATED BY THE COUNTRY CODE AND THE COORDINATES.
FOR THE CONVENIENCE OF THE USER, AN ALPHABETIC LISTING OF COUNTRY
CODES IS INCLUDED ON THE INSIDE OF THE BACK COVER.
SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET FOLLOW THE DESCRIP-
TION OF THE TARGET. PASS NUMBERS, SUFFIXED WITH A FOR ASCENDING
AND D FOR DESCENDING, ARE LISTED FIRST, FOLLOWED BY THE FRAME NUM-
BERS. SYMBOLS FOR LIMITING CONDITIONS AFFECTING PHOTOGRAPHY ARE C
(CLEAR), SC (SCATTERED CLOUD COVER), HC (HEAVY CLOUD COVER), H
(HAZE), CS (CLOUD SHADOW), S (SNOW), 0 (OBLIQUITY), SD (SEMIDARK-
NESS), D (DARKNESS), GC (GROUND COVER), CF (CAMOUFLAGE), AND GR
(GROUND RESOLUTION). INTERPRETABILITY OF THE PHOTOGRAPHY IS CATEGO-
RIZED AS G (GOOD), F (FAIR), OR P (POOR). THE EXTENT OF PHOTOGRAPH-
IC COVERAGE IS DENOTED BY THE SYMBOLS T (TOTAL) OR PT (PARTIAL).
THE MODE OF COVERAGE IS INDICATED BY ST (STEREO), PS (PARTIAL STER-
EO), OR NS (NON-STEREO). IF A TARGET CAN BE IDENTIFIED ONLY (I00),
JUST THE TARGET NAME, PASS AND FRAME NUMBERS, AND IDO WILL APPEAR.
RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF PHOTOGRAPHY IS
ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEM-
ERIS DATA. CONSEQUENTLY, FUTURE ANALYSIS MAY RESULT IN MINOR ALTER-
ATIONS. MOREOVER, RECIPIENTS ARE CAUTIONED THAT THE IDENTI-
FICATION OF TARGETS IS BASED PRIMARILY ON PHOTOGRAPHY AND DOES NOT
CONSTITUTE A FINISHED INTELLIGENCE JUDGMENT.
FOR THE CONVENIENCE OF THE USER, AN INDEX TO ALL TARGETS IN THE
25X1A
2
Approved For Release .9 /gt=R
T48o2cTc 000200110001-9 25X1 A
d For Releas
TCS-80939/66
MISSION 1035, 21-30 SEPTEMBER 1966
SUPPLEMENT IS INCLUDED IN THE FINAL EDiTION~ FOR TRACK MAPS,
SEE TCS-80936/66 THROUGH 80938/66, THE OAK REPORTS FOR THIS MISSION.
25X1A
Approved For Release
'27R
Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9
Highlights
Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9
or ReleaslWA4 T 25X1 A
R0002001 10001-9T CS--80939 / bb
MISSION 1035, 1-30 SEPTEMBER 1966
1. AIR ACTIVITY
AN AIRFIELD IN AN EARLY STAGE OF CONSTRUCTION, CONSISTING OF AN
8,200 X 200 FT NE/SW RUNWAY AND PARALLEL TAXIWAY, IS NEWLY
IDENTIFIED 4.8 NM NW OF CHAGAROTAR.
2. NUCLEAR ENERGY ACTIVITY
CONSTRUCTION OF THE CORRIDOR INTERCONNECTING CASCADE BUILDINGS
C AND 0 AT AREA 2 ZAOZERNYY ATOMIC ENERGY COMPLEX, HAS
COMMENCED SINCE SCARRING SE OF CASCADE
BUILDING C, VISIBLE ON IS NOW AN EXCAVATION
APPROXIMATELY 515 X 250 FT WITH FOUNDATION TRENCHING FOR A NEW
BUILDING.
TALL KING ANTENNAS ARE NEWLY IDENTIFIED AT THE FOLLOWING 6
AREAS IN THE USSR -- NOVYY VASYUGAN, PODKAMENNAYA TUNGUSKA,
MANGUT, URGAL, LENINSKOYE, AND SAGIZ.
THIS SUPPLEMENT REPORTS ON 229 COMOR TARGETS AND 16 NON-COMDR
TARGETS.
25X1A
Approved For Release 2002/42! -
Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9
Missiles
Approved For Release 2002/02/27 : CIA-RDP99TO1396R000200110001-9
IQBO .? 00200110001- 25X1 A
For Releas ~CS-80939/66
MISSION 1035,.21-30 SEPTEMBER 1966
25X1A
MISSILES
THE CENTER IS COVERED ON ONE PASS OF STEREO PHOTOGRAPHY
WITH FAIR-TO-GOOD INTERPRETABILITY. SEE TCS-80937/66,
PART II OF THE OAK FOR MISSION 1035-1, FOR FURTHER
DETAILS.
WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW
CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY
UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX
TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY
PHOTOGRAPHIC REFERENCES ARE LISTED,
AT PAD Al, A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE
RAIL JUST TO THE REAR OF THE PAD AND A STRING OF RAIL
CARS AND 2 OTHER CARS ARE ON THE TRACK FARTHER TO THE
REAR.
AT PADS AZ AND A3, 2 LONG VEHICLES/PIECES OF EQUIPMENT
ARE ON THE RAILS TO THE REAR OF PAD A3 AND AT LEAST 5
OTHER RAIL CARS ARE ON THE TRACK TO THE REAR OF PAD A2.
AT LAUNCH PAD 81, THE ARMS OF THE SERVICE TOWER
OVERHANG THE FLAME PIT ON BOTH SIDES OF THE PAD. AT
LEAST 9 RAIL CARS ARE AT VARIOUS POINTS ON THE RAILS TO
THE REAR OF PAD 6l AND I LONG RAIL CAR OR 2 SHORT RAIL
CARS ARE ON THE RAILS JUST EAST OF THE LARGEST CHECKOUT
BUILDING.
AT LAUNCH AREA 82, 1 LONG AND 3 SHORT VEHICLES/PIECES
OF EQUIPMENT ARE ON THE PAD, SEVERAL VEHICLES/PIECES OF
EQUIPMENT ARE PARKED ON EACH OF THE HARDSTANDS NW AND
SW OF THE PAD, AND ANOTHER IS PARKED IN FRONT OF THE
READY BUILDING.
25X1A
Approved For Release ,2,Q0.2/O R
For ReleaseT2042WCI 00200110001- 25X1A
IC S-80939/66
MISSION 1035v 21-30 SEPTEMBER 1966 25X1A
A PROBABLE MISSILES APPROXIMATELY 95 FT HIGH, IS
ERECTED ON EACH OF THE 3 LAUNCH PADS AT PAD C2, 2
LONG VEHICLES/PIECES OF EQUIPMENT ARE PARKED ON THE
PAD, ONE IMMEDIATELY NORTH AND ONE SOUTH OF THE CENTER
OF THE PAD. AT PAD C3, A LONG VEHICLE/PIECE OF
EQUIPMENT IS PARKED JUST SOUTH OF THE CENTER OF THE PAD
AND A SHORTER ONE IS PARKED AT THE SOUTH END OF THE
PAD. A STRING OF SHORT RAIL CARS AND 2 OTHER
VEHICLES/PIECES OF EQUIPMENT ARE ON THE RAILS/ROAD
BETWEEN PADS Cl AND C2. APPROXIMATELY 10
VEHICLESIPIECES OF EQUIPMENT ARE PARKED IN THE SW
CORNER OF THE LAUNCH AREA. THE NORTHERNMOST
ARCH-ROOFED BUILDING 1 NM WEST OF THE SUPPORT FACILITY
APPEARS TO BE COMPLETELY EARTH MOUNDED ONE LONG AND
SEVERAL SHORTER STRINGS OF RAIL CARS ARE IN THE COMPLEX
SUPPORT FACILITY.
AT DI, THE CENTER SILO APPEARS TO BE PARTIALLY OPEN.
ONE VEHICLEIPIECE OF EQUIPMENT IS ON THE LOOP ROAD
FORWARD OF THE CENTER SILO AND ANOTHER IS PARKED
IMMEDIATELY OFF THE LOOP ROAD NEARBYa
AT D2 A POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE
LOOP ROAD FORWARD OF THE CENTER SILO AND A LONG
VEHICLE/PIECE OF EQUIPMENT IS IN FRONT OF THE NORTHERN
MISSILE-READY BUILDING.
THREE VEHICLES/PIECES OF EQUIPMENT ARE PARKED OFF THE
LOOP ROAD EAST OF THE RIGHT SILO ON
THE LEFT SILO DOOR IS OPEN AND 3 LONG VEHICLES/PIECES
OF EQUIPMENT ARE PARKED OFF THE LOOP ROAD EAST OF THE
RIGHT SILO ON
25X1 D
25X1A
Approved For Release (12/0212 O
d For ReleasIY0021WET 00020011000115-8O9
MISSION 1035, 21-30 SEPTEMBER 1966
25X1A
9/66
25X1A
G1-G2 A DITCH
HAS
BEEN DUG PARALLEL TO THE INNER
FENCE LINE ALONG
THE
EAST SIDE OF THE LAUNCH AREA TO A
POINT'FOR.WARD OF
THE
LAUNCH AREAS JUST OUTSIDE OF THE
SECURITY FENCE.
NO
OTHER SIGNIFICANT CHANGE OBSERVED
SINCE
G3-G4 -- A BUILDING HAS BEEN CONSTRUCTED JUST EAST OF
THE LONGER OF THE 2 BUILDINGS ON THE EAST SIDE OF THE
ACCESS ROAD NEAR THE CENTER OF THE LAUNCH AREA. IT IS
PARALLEL TO AND APPROXIMATELY THE SAME LENGTH AS THE
ORIGINAL BUILDING. FIRST EVIDENCE OF THIS BUILDING IS
VISIBLE ON NO OTHER SIGNIFICANT
CHANGE OBSERVED. ON AN OBJECT, POSSIBLY THE
ERECTING MECHANISM, IS STANDING IN A VERTICAL POSITION
ON PAD G4 AND A SHORT STRING OF RAIL CARS IS ON THE
APRON TO THE REAR OF THE PAD.
G5-G6 -- A LIGHT-TONED PROBABLE CYLINDER, APPROXIMATELY
6 FT LONG, HAS BEEN ADDED TO THE LINE OF 23 DARK-TONED
CYLINDERS ALONG THE EAST FENCE LINE REPORTED ON MISSION
NO OTHER SIGNIFICANT CHANGE OBSERVED.
25X1 B
25X1A
Approved For Release
IWOE1'
25X1 A For Releases QUP02MW 00200110001A5_ 80939 /66 5X1 A
MISSION 1035, 21-30 SEPTEMBER 1966 25X1A
TYURATAM LAUNCH COMPLEX H UR 4559N 06342E
THREE VEHICLES/PIECES OF EQUIPMENT ARE ON THE PAD AT H2
AND APPROXIMATELY 6 OTHERS ARE LOCATED IN AND ABOUT THE
LAUNCH AREA.
25X1 D
TYURATAM LAUNCH GROUP I (SITES I1, 12, 13) UR 4555N 06326E
AT SITE 1I, THE SILO DOOR IS OPEN AND ONE LONG AND ONE
SHORT VEHICLE/PIECE OF EQUIPMENT ARE ON THE APRON NORTH
OF THE SILO.
AT SITES 12 AND I3, FEW SIGNS OF ACTIVITY ARE OBSERVED.
THE SILO HEADWORK IS NOT YET PRESENT.
25X1 D
TYURATAM LAUNCH GROUP I (SITE 14) UR 4554N 06320E
THE SILO DOOR IS OPEN AND A SMALL VEHICLE/PIECE OF
EQUIPMENT IS PARKED AT THE SILO. APPROXIMATELY 4
VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON JUST SE
OF THE SILO AND A GROUP OF APPROXIMATELY 12 OTHERS IS
PARKED SEVERAL HUNDERED FEET SE OF THE SILO.
25X1 D
TYURATAM LAUNCH GROUP I (SITES 15, 16) UR 4559N 06333E
15 -- 1 POSSIBLE, SMALL VEHICLE/PIECE OF EQUIPMENT IS
ON THE APRON NORTH OF THE SILO.
16 -- FEW SIGNS OF ACTIVITY OBSERVED. THE SILO
HEADWORK IS NOT YET PRESENT.
25X1D
TYURATAM LAUNCH COMPLEX J
25X1 D
25X1A
Approved For Release-2D(12
1
For Release90027Q2 :T ~000200110001-PCS_80
MISSION 1035, 21-30 SEPTEMBER 1966
THE SILO DOOR IS CLOSED AND A SMALL POSSIBLE
VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NORTH OF THE
SILO AT SILO K1 ON THE SILO DOOR IS OPEN AT
SILO K2. A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE
APRON AT THE SILO AND A TALL OBJECT IS ERECTED OVER THE
SILO. ONE SHORT AND ONE LONG VEHICLE/PIECE OF
EQUIPMENT ARE ON THE APRON NORTH OF THE SILO.
ONE VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NORTH OF
SILO K1, SEVERAL ARE ON THE APRON AROUND SILO K29 AND
AN UNDETERMINED NUMBER IS IN THE SE CORNER OF THE
LAUNCH AREA ON
SEVERAL SMALL POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE
LOCATED AT VARIOUS POINTS WITHIN THE LAUNCH AREA ON
AND AN UNDETERMINED NUMBER OF VEHICLES/PIECES
OF EQUIPMENT IS OBSERVED ON
25X1 D
THE DITCH PREVIOUSLY REPORTED PARALLEL TO THE SOUTH AND
WEST FENCE LINES HAS BEEN JOINED. THE PORTION ALONG
THE WEST FENCE LINE HAS BEEN EXTENDED TO THE WEST OF
SITE LI. AND TO A POINT WEST OF THE G3-G4 ACCESS ROAD.
TWO SMALL POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE
PARKED OFF THE GRADED ACCESS ROAD EAST OF THE SILO ON
25X1A
9/66
25X1A
A POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON
NEAR THE SILO ON 25X1A
Approved For Release 1 V2/JMET
25X1 A
For Release'2K/UI/E1I 25X1 A
00110001 4
MISSION 1035, 21-30 SEPTEMBER 1966
25X1 D
25X1p
25X1 D
25X1 D
25X1 D
25X1A
TYURATAM-LAUNCH GROUP L (SITE 1.5) UR 4559N 06257E
TYURATAM LAUNCH GROUP L (SITE L6) UR 4601N 06253E
TYURATAM LAUNCH GROUP L (SITE L7) UR 4605N 06255E
A LONG VEHICLE/PIECE IS ON THE GRADED ACCESS ROAD SOUTH
OF THE APRON.
25X1 D
25X1 D
TYURATAM LAUNCH GROUP L (SITE L8) UR 4601N 06307E
ON BOTH PASSES, A LONG VEHICLE/PIECE OF EQUIPMENT IS
PARKED ATTHE SILO AND A TALL OBJECT, APPROXIMATELY 65
FT HIGH, IS ERECTED OVER THE SILO. ONE SMALLER
VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON SE OFTHE
SILO.
25X1A
1
Approved For Release /SI
25X1A
TAP 92W-T 25X1A
For Releas 0 CI 000200110001-
7 S-80939l66
MISSION 1035, 21-30 SEPTEMBER 1966 25X1A
TYURATAM LAUNCH GROUP L (SITE L9). UR 4558N 06306E
ONE SMALL, POSSIBLE VEHICL EQUIPMENT IS ON
THE APRON NEAR THE SILO ON A LONG
VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON AT THE SILO
AND A TALL OBJECT IS ERECTED OVER THE SILO ON PASS
25X1.D
25X1 D
25X1 D
TYURATAM LAUNCH GROUP L (SITE L10) UR 4557N 06301E
TYURATAM LAUNCH GROUP M (SITE MI) UR 4603N 06302E
FEW, IF ANY, SIGNS OF ACTIVITY ARE OBSERVED. THE SILO
HEADWORKS ARE STILL NOT PRESENT.
25X1 D
TYURATAM LAUNCH GROUP M (SITE M2)
THE SILO HEADWORK IS NOT YET PRESENT.
25X1 D
TYURATAM LAUNCH GROUP M ISITE M3)
THE SILO HEADWORK IS NOT YET PRESENT.
25X1 D
TYURATAM LAUNCH GROUP N (SITE NI) UR 4602N 06303E
A VEHICLEIPIECE OF EQUIPMENT APPROXIMATELY 65 FT LONG
IS PARKED A AND A TALL OBJECT IS ERECTED OVER
25X1D THE SILO ON A SHORT VEHICLEIPIECE OF
EQUIPMENT IS ON THE RON NORTH OF THE SILO.
25X1A
1
Approved For Release WI ER
25X1A 25X1A
d For ReleaseT2[r021Q2)Tl 00200110001-9
MISSION 1035, 21-30 SEPTEMBER 1966
A LONG VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NEAR
25X1D THE SILO ON
25X1 D
25X1A
ONE SMALL POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS ON THE
25X1D APRON NEAR SILO N2 ON
THE SILO DOOR AT N2 APPEARS TO BE OPEN AND A POSSIBLE
VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON NEARBY ON
25X1 D
25X1 D
THE COMPLEX SUPPORT FACILITY AND LAUNCH SITES I AND 2
ARE COVERED BY CLEAR PHOTOGRAPHY. THE TRANSFER POINT
IS OBSCURED BY CLOUDS AND LAUNCH SITE 3 IS OBSERVED ON
NON-STEREO PHOTOGRAPHY THROUGH HAZE AND SCATTERED
CLOUD,.
WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW
CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY
UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX
TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY
PHOTOGRAPHIC REFERENCES ARE LISTED.
25X1 D
25X1 D
25X1A
Approved For Release "FOSKR
12
For Releas qe 02 SECRET C 0110001- 25X1A
'-80939/66
MISSION 1035, 21-30 SEPTEM~ 25X1A
SHADRINSK ICBM LAUNCH SITE 2 UR 5609N 06402E
THE RIGHT SILO DOOR IS IN THE OPEN POSITION. TWO
POSSIBLE MISSILES ARE IN FRONT OF THE RIM BUILDINGS.
SHADRINSK ICBM LAUNCH SITE 3 UR 5606N 06356E
NOVOSIBIRSK ICBM COMPLEX UR 5.515N 08259E
APPROXIMATE WESTERN 60 PERCENT OF THE SEARCH AREA,
INCLUDING THE ENTIRE COMPLEX, IS OBSERVED ON ONE PASS
OF STEREO PHOTOGRAPHY. NO NEW MISSILE FACILITIES
OBSERVED IN THE CLOUD-FREE PORTIONS OF THE SEARCH AREA
COVERED.
WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW
CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY
UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX
TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY
PHOTOGRAPHIC REFERENCES ARE LISTED.
NOVOSIBIRSK ICBM LAUNCH SITE I
UR
5518N
08301E
NOVOSIBIRSK ICBM LAUNCH SITE 2
UR
5519N
083.10E
NOVOSIBIRSK ICBM LAUNCH SITE 3
UR
5523N
08255E
NOVOSIBIRSK ICBM LAUNCH SITE 4
UR
5522N
08313E
25X1A
Approved For Release I VWO3 R
TOP SECRET 25X10
For Release 2002/02/27: C 2 0110001 ~CS-80939i625X1A
MISSION 10359 21-30 SEPTEm 9b
NOVOSIBIRSK ICBM LAUNCH SITE 5
KOZELSK ICBM COMPLEX
UR
UR
5519N
5356N
08256E
03549E
THE EAST PORTION OF THE COMPLEX IS COVERED BY
PHOTOGRAPHY ON ONE PASS. THE AREA IS OBSCURED BY-HEAVY
CLOUDS, AND SITES 3, 4,
TRANSFER POINT ARE THE
11,
ONLY
22, 239 AND PART
IDENTIFIABLE ICBM
OF THE
ACTIVITIES. NO DETERMINATION OF CONSTRUCTION STATUS ON
TYPE IIID SITES 11, 22, AND 23 CAN BE MADE.
WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT, NEW
CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY
UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL: COMPLEX
TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY
PHOTOGRAPHIC REFERENCES ARE LISTED.
KOZELSK ICBM LAUNCH SITE 3
UR
5354N
03545E
KOZELSK ICBM LAUNCH SITE 4
UR
5353N
03551E
KOZELSK ICBM LAUNCH SITE 11
UR
5353N
03543E
KOZELSK ICBM LAUNCH SITE 22
UR
5349N
03541E
THE CONSTRUCTION STAGE-:IS UNDETERMINED.
KOZELSK ICBM LAUNCH SITE 23
UR
5340N
03546E
THE CONSTRUCTION STAGE: IS UNDETERMINED.
25X1A
Approved For Release. 2/gME
25X1A
d For Releass2b021QZ/ZTT - R000200110001T &S-80939/66
MISSION 1035, 21-30 SEPTEMBER 1966
25X1D 25X1A
ALEYSK. ICBM COMPLEX
UR
5229N
08243E
THE COMPLEX IS COVERED BY'ONE:PASS OF
PHOTOGRAPHY. SEVENTEEN LAUNCH SITES
CLEAR
(INCLUDING
2 SITES
25X1 D
NEWLY IDENTIFIED ON THIS MISSION), THE TRANSFER POINT,
AND THE COMPLEX FACILITY ARE OBSERVED. SEE
TCS-80937/66, PART II OF THE OAK FOR
FOR FURTHER DETAILS.
WHERE EITHER MISSILES, MISSILE-RELATED EQUIPMENT. NEW
CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY
UNREPORTED FEATURES ARE OBSERVED AT INDIVIDUAL COMPLEX
TARGETS, THEY ARE REPORTED. OTHERWISE, ONLY
PHOTOGRAPHIC REFERENCES ARE LISTED.
25X1 D
ALEYSK ICBM LAUNCH SITE I
UR
5227N
08235E
25X1 D
ALEYSK ICBM LAUNCH SITE 2
UR
5230N
08240E
25X1 D
ALEYSKICBM LAUNCH SITE 3
UR
5233N
08242E
25X1 D
ALEYSK ICBM LAUNCH SITE 5
UR
5235N
08230E
25X1 D
ALEYSK ICBM LAUNCH SITE 6
UR
5236N
08235E
LAUNCH SITE 6 IS NOW COMPLETE.
25X1 D
25X1A
Approved For Release. 2// {27,Ey
For Releasj 02WC 000200110001- .FS-80939/6
MISSION 1035, 21-30 SEPTEMBER 1966 25X1A
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION.
ALEYSK ICBM LAUNCH SITE 8 UR 5218N 08249E
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION.
ALEYSK ICBM LAUNCH SITE 9 UR 5215N 08238E
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION.
ALEYSK ICBM LAUNCH SITE 10 UR 5210N 08235E
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION.
ALEYSK.ICBM LAUNCH SITE 11 UR 5212N 08243E
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION.
ALEYSK ICBM LAUNCH SITE 12 UR 5233N 08234E
THE SITE REMAINS IN A LATE STAGE OF CONSTRUCTION.
ALEYSK ICBM LAUNCH SITE 13 UR 5220N 08241E
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION.
25X1A
Approved For Release 'R
For Release9t . 2 : 000200110001-I9r- S-809
MISSION 1035, 21-30 SEPTEMBER 1966
ALEYSK ICBM LAUNCH SITE 14 UR 5228N 08240E
THE SITE REMAINS IN THE MID-STAGE OF CONSTRUCTION,
ALEYSK ICBM LAUNCH SITE 15 UR 5222N 08256E
THE SITE REMAINS IN AN EARLY STAGE OF CONSTRUCTION.
25X1A
/66
25X1A
ALEYSK ICBM LAUNCH SITE 16 UR 5228N 08254E
THE SITE REMAINS IN AN EARLY STAGE OF CONSTRUCTION.
ALEYSK ICBM COMPLEX SUPPORT FACILITY
UR
5229N
08243E
ALEYSK ICBM RAIL-TO-ROAD TRANSFER POINT
UR
5228N
08242E
KAPUSTIN YAR SAM LAUNCH COMPLEX
UR
4848N
04545E
THE COMPLEX IS COVERED ON PARTIAL STEREO PHOTOGRAPHY
WITH FAIR-TO-POOR INTERPRETABILITY. HEAVY-TO-SCATTERED
CLOUD COVER PRECLUDES INTERPRETATION OF APPROXIMATELY
60 PERCENT OF THE SAM LAUNCH COMPLEX. NO SIGNIFICANT
CHANGES ARE OBSERVED.
THERE ARE NO APPARENT CHANGES SINCE
AT PRECISION TRACKING RADAR SITE, PROBABLE LONG
RANGE SAM LAUNCH AREA, SA-1 LAUNCH AREA, SA-1 AND R&D
YOYO AREAS, SAM HOUSING AND SUPPORT AREA, THE SAM
WARHEAD AREA, AND INSTRUMENTATION SITES 1,2,3,4,. AND 5.
AT THE R&D LAUNCH AREA, THERE IS NO SIGNIFICANT CHANGE
EXCEPT AT LAUNCH SITE F, WHERE THERE APPEAR TO BE FEWER
VEHICLES/PIECES OF EQUIPMENT THAN WERE OBSERVED ON
Approved For ReleaselOr2/SEIRET
25X1 D
25X1A
25X1A
AT SAM TRAINING SITES A,B, AND C, THE LAUNCH AREAS DO
NOT APPEAR TO BE OCCUPIED BY.ANY MISSILES OR VEHICLES/
PIECES OF EQUIPMENT. SITE A WAS OCCUPIED BY
VEHICLES/PIECES OF EQUIPMENT IN THE CENTRAL GUIDANCE
AREA ON SITES B AND C WERE NOT COVERED
25X1 D
25X1 D
INSTRUMENTATION SITES 6,7, AND 9, SAM CHECKOUT AND
STORAGE AREA, .SA-2 LAUNCH AREA, AND THE SA-3 LAUNCH
AREA CAN BE IDENTIFIED ONLY. THE REMAINDER OF THE SAM
LAUNCH COMPLEX IS CLOUD COVERED.
25X1D 25X1A
25X1 D
NO NEW CONSTRUCTION OR CHANGES IN FACILITIES OBSERVED
SINCE IN THE OPERATIONS AREA. AT
LAUNCH POSITION B-4, A PROBABLE GALOSH CANISTER IS IN
THE ERECTOR BUT NOT ERECTED. THREE VEHICLES/PIECES OF
EQUIPMENT ARE PARKED JUST SOUTH OF THE ERECTOR.
AT INSTRUMENTATION SITE B-1, 5 POSSIBLE ELECTRONIC VANS
ARE NOW PARKED ALONG THE NORTH PERIMETER OF THE SITE.
ONLY 3 VANS WERE PRESENT ON 25X1D
25X1 D
IN THE COMPLEX SUPPORT AREA, 3 BARRACKS/STORAGE
BUILDINGS HAVE BEEN DISMANTLED SINCE
TWO SMALL POSSIBLE BARRACKS HAVE BEEN CONSTRUCTED
For Release R2199`CI 0200110001-jC S-80939/66 IH
MISSION 1035, 21-3 P.WP966
25X1D SINCE
25X1 D
25X9.
25X1 D
VLADIMIR SUBMARINE BASE UR 4356N 13528E
OB - 5 SS, 1 PROBABLE MSF, AND 1 YAGT.
NO MISSILE STORAGE OBSERVED. 25X9
NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR
PREVIOUSLY UNREPORTED FEATURES OBSERVED.
25X1 D
Approved For Release yof/Q 7, 1 25X1 A
ReI po 2~ s_ 3 ,25X1 A
d Fo I S 5e~1 i 9~fi~s 0110001- 2:A
SEVASTOPOL NAVAL MISSILE STORAGE FACILITY UR 4436N 03340E
NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR
PREVIOUSLY UNREPORTED FEATURES OBSERVED.
PETROVKA SHIPYARD UR 4307N 13220E
OB -- 1 POSSIBLE LARGE SS, 3 POSSIBLE DO, AND 1
UNIDENTIFIED SMALL VESSEL ON REPAIR WAYS AND 1 PROBABLE
DD AND B UNIDENTIFIED VESSELS AT PIERS AND QUAYS.
NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR
PREVIOUSLY UNREPORTED FEATURES OBSERVED.
ZALIV STRELOK SUBMARINE BASE PAVLOVSKOGO UR 4252N 13232E
OB 4 SS AND 3 AUXILIARIES.
NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR
PREVIOUSLY UNREPORTED FEATURES OBSERVED.
ZALIV STRELOK NAVAL MSL STAR PAVLOVSKOGO UR 4254N 13234E
NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR
PREVIOUSLY UNREPORTED FEATURES OBSERVED.
25X1A
1
Approved For Release ' /w"
T SCRE -B39~625X1A
For Release 02 R0002200110001 S 5X1 A
MISSION 1035,.21-30 SEPTEMBER 19+56
DUNAY SUBMARINE BASE BUKHTA KONYUSHKOVA
UR
4252N
13222E
SEVASTOPOL NVL B & SHPYD SEVMORZAVOD 497
UR
4436N
03332E
OB -- AT SHIPYARD AND NAVAL BASE -- 1 CL, 1 DLG, 9 DD,
9 MEDIUM SS (2 IN DRYDOCK),. i