AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT AMENDMENT/MODIFICATION NO. P00002

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP96-00789R003000440001-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
13
Document Creation Date: 
November 4, 2016
Document Release Date: 
April 24, 2000
Sequence Number: 
1
Case Number: 
Publication Date: 
July 17, 1992
Content Type: 
CONT
File: 
AttachmentSize
PDF icon CIA-RDP96-00789R003000440001-0.pdf735.11 KB
Body: 
(; ~"F? - UPON RF . {AL O;F ENG?.OSIURES Approved For Release 2000/08/08: I RDDP9 0a7,?ftJ; Qr3p00 ~( ,w "A`Es, AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT ,. CONTRACT ID CODE TPAGE OF PAGES 4 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. OJECT NO. (If applicable) P00002 07/17/92 330/025Z/92 7 S. ISSUED BY CODE HHQ402 7. ADMINISTERED BY(If other than Item S) CODE S0514A Virginia Contracting Activity SG1J P.O. Box 46563 DCMAO SAN DIEGO 7675 DAGGET STREET Washington, D.C. 20050-6563 SUITE 200-300 1 0 SAN DIEGO, CA 92111-2241 S12(202) 373-8388 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) Vendor ID: 00002520 9A. AMENDMENT OF SOLICITATION NO. SCIENCE APPLICATIONS 10260 CAMPUS POINT DRIVE 9B.DATED(SEEITEMII) INTERNATIONAL CORP SAN DIEGO CA 92121- 10A MODIFICATION OF CONTRACT/ORDER NO. MDA908-91-C-0037 X 10B. DATED (SEE ITEM 13) 02/01/91 CODE 52302 FACILITY CODE 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth In Item 14. The hour and date specified for receipt of Offers Is extended, Is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram w IT ch includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b). X C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANTTO AUTHORITY OF: FAR 43.103(a) D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor 0 is not, ? is required to sign this document and return 1 copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, Including solicitation/contract subject matter where feasible.) The purpose of this modification is to extend the work and services for CLINs 0001 and 0002 of contract MDA908-91-C-0037. Accordingly contract MDA908-91-C-0037 is modified as shown on page 2, 3, and 4 of this modification. 15~NM~ SAN D TITERO $IR (Type or print) C" V I c.1: SIDE jf T. O a-J aAEZ OF eodTkA&T S 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED c . I&44t.eJ (Signature of person authorized to sign) NSN 7540-01-152-8070 PREVIOUS EDITION UNUSABLE Approved For ReIe f0 /08 : CIR~ STANDARD FORM 30 Prescribed by GSA (48 CFR) 53.243 SGFOIA2 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 Next 2 Page(s) In Document Exempt Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 Approved For Release 2000/08/08 : CIA-RDP96-00789R00300d440001-0 SECEW STA'LPCW lit WMK CAL i AND ANUX S MDA908-91-C-0037 MOD P00002 ATTACHMENT 2 3 July 1992 Page 1 of 5 1.0 (S/ ) P(I E: The purpose of this effort is to conduct research and perform select analyses of anomalous phenomena. SG1B BACET I~ ): 2.0 (0) 2.1 (C) Phenomenological research and analysis as intended by this contract refers to anomalous phenomena associated with human abilities. Investigations in this area have sometimes been referred to as Remote Viewing (RV), Extrasensory Perception (ESP), and recently Anomalous Cognition (AC) or Anomalous Phenomena (AP). Foreign researchers have also used the term psychoenergetics to describe aspects of these areas. 2.2 (S/NF) Over the past sixteen years DIA has followed the field of psychoenergetics for two basic reasons:. 2.4 (S/NF) In 1983 a report with project findings was sent to congressional intelligence and appropriation committees. The report affirmed the existence of remote viewing phenomenon and reoommeryded that additional research for quantifying and developing remote viewing as an intelligence collection tool be pursued. This recommendation was endorsed by a special Science Panel that met to review the project findings. This panel also affirmed that the contractual research was scientifically sound and urged that basic and applied research in psychoenergetics be continued, its scope expanded, and that other laboratories be involved. SDC1 EEr/NOFU M Classified By: DIA/D-r Declassify On: AQJR Enclosure 3 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000)440001-0 MDA908-91-C-0037 MOD P00002 ATTACHMENT 2., 3 July 1992 Page 2 of 5 2.5 (S/NF) The first opportunity to expand this research scope occurred in 1985. The Department of the Army's Surgeon General Office for Research and Development (DASC D) initiated a five year research and development program. The SGRD program centered on two main aspects: basic anomalous phenoanena understanding, and applications-oriented research. DIA established close ties with this R/D effort to ensure that applications research would be adequately pursued. 2.6 (S/NF) In 1987, it became apparent that S(M funding might not be available to carry through to the end of the five year period. Consequently, additional funding was sought by DIA and acquired through funding transfer action by the House Apprepriatiocns Connnittee (HAC). This funding was provided to DIA; NIPR action to the SG RD contract was the most expeditious method of allocating this funding. 2.7 (S/NF) Results of this effort yielded several findings of breakthrough potential. Subsequently, follow-n research support was provided to DIA by Congressional action for FY91; DIA was identified as the executive agent due to long-standing knowledge and expertise in this area. Both R&D and O/M funds were allocated for continuing basic and applied research, for applied investigation and for assisting in assessment of relevant foreign research. Additional funds were also provided by congressional action in FY92 to continue this effort and to start new research. 3.0 (S/NF) C18JHCTrIVE: The objective of this contract is to continue the most promising basic and applied research in this area that resulted from the FY 1991 effort. It also includes follow-on to exploratory work in order to demonstrate statistical significance and identify underlying parameters. 4.0 (S/NF) SOOPE: Basic research, applied research and threat assessments will be accomplished for this ph encxnerological area. 5.0 (S/NF) TECRUCMWOHM ]D ATIc2 : 5.1 (S/NF) All research activities and findings resulting Emma previous programs in psychoenergetics shall be brought to bear on this effort. In addition, expertise in multidisciplinary areas throughout SAIL shall be made available as consultants or for special support as required. 5.2 (U) Specialized support, if not available at the cuo itrctor, can be obtained via consultant or subcontract efforts with prior approval by the OYIR. Every effort should be made to insure such support is from the recognized experts in the field. Sane of the specific tasks in section 6.0 can be performed in unclassified facilities. 5.3 (S/NF) This effort will utilize a technical review group (e.g., a Scientific oversight cmnnittee, a Human Use Review Panel and a Policy Board) that was established in the previous effort. SDCRET/N0FO 1 2 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 Approved For Release 2000/08/08 : CIA-RDP96-00789R00300d440001-0 MDA908-91-C-0037 MOD P00002 ATTACHMENT 3 July 1992 Page Ij of 5 5.4 (S/NF) Some of the experiments/investigations required to fulfill this contract may require participation of select govenm~ent personnel. All such investigations will be fully planned and coordinated with the WIR and will be under the purviews of the SOC and the Ikmian Use Review Committee. 5.5 (U) Should unforseen schedule of other issues arise concerning any of the specific tasks identified in section 6.0, the CORR will be given immediate notice. If necessary, adjustments to priorities and schedules can be approved by the cm if there is no cost or other impact on the over-all program. The OYIR will also review/approve all anticipated research protocols. 5.6 (U) All items in sections 6.0 and 7.0 will be funded from R&D funding provided by this contract, and shall be expended NItr 18 months after contract award. Acaaunting procedures to clearly identify the R&D expenditures shall be implemented by the contractor. 5.7 (U) Terms of reference and additional task details are on file by the WIR and will be provided to the contractor to insure adequate task understanding. This material is contained in DIA publication DRLS-1007-S, 29 NOV 1990. 6.0 SPBCMC 'DISKS: 6.1 (U) Basic Research: 6.1.1 (U) Biophysical Measurements (Follow-on to SOW 6.3.1 in PR 330/012Z/91): 6.1.1.1 (S/NF) Determine how magnetoenoephalograph (MM) measurements correlate with counterpart electroencephalograph (EDG) data. This effort will assist in simplifying over all brain wave t activity, will form the initial phases of the larger data base required for establishing statistical significance, and will assist in screening/ selection. 6.1.1.2 (C) Perform refined M,EX data analysis for individuals involved in the previous effort for the purpose of isolating neurophysical parameters that correlate with anomalous performau~ces. This analysis will use new/improved statistical procedures not available in previous efforts. 6.2 (U) Data Patterns/Carrelations (Follow-oar to SOW 6.3.2 of PR 330/012Z/91): 6.2.1 (C) Z tend analysis of sender/no saxler analyses to include new statistical evaluation methods involving artificial intelligence procedures for high performance candidates identified during the previous effort. Develop inplications regarding target-individual match. SDCItEI'/NOFUW 3 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 MDA908-91-C-0037 MOD P00002 ATTACHMENT '2j 3 July 1992 Page 4 of 5 6.2.2 (U) mine all relevant NEG/EDG data and worldwide anomalous cognition research to identify performance testing/patterns and to help isolate key physical/psychological/biophysical parameters. 6.3 (U) Applied Research (Follow-on to SOW 6.2.3.3 In PR 330/012Z/91): 6.3.1 (S/NF) Cb uct long distance anomalous eom un ation experiments that involve leading candidates identified in previous research. The key variable will be location, and will involve controlled sites selected by the OOI'R. 6.4 (U) Theoretical Issues (Follow-on to SOW 6.2.5 in PR 330/012Z/91): 6.4.1 (U) Perform anomalous phenomena experiments in the presence of select sensitive instrumentation that may help identify underlying physical parameters. Pilot work should include an off-fihe-shelf Mossbaur device. 6.4.2 (U) Identify physical mechanism models for anomalous cognition and develop protocols for testable experiments using select individuals. 6.5 (U) Research Methodology (Follow-on to SOW 6.4 of PR 330/012Z/91): 6.5.1 (U) Provide appropriate research methodology support to include reviews/approvals by the established Scientific Oversight Committee, the Policy Board and the Human Use Review Panel for the follow-on activity. 6.5.2 (S/NF) Provide appropriate management support and appropriate project research support activity to include document preparation, administration, and all project associated travel for contractor personnel, consultants, and other experts. This task includes research methodology assessment of related worldwide activity to search for new scientifically-sound approaches. Select conference attendence or sponsorship may also be required to identify new methodologies. 7.0 (U) QUICK R riCv CAPABa.T1Y (ORC) : The contractor will maintain a quick response capability and be prepared to respond in less than 24 hours to problems or unexpected demands for brief technical papers that may be developed during the term of this project. SEC 2ET/NOFORN 4 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 MDA908-91-C-0037 Approved For Release 2000/08/08 : CIA-RDP96-00789R00300 440001-0 MOD P00002 ATTACHMENT ;V 3 July 1992 SEC12Er Page 5 of 5 8.0 (U) ArZO 1!EC2 OFF OPT: The level of effort to be applied to each basic task category is shown in the following paragraphs. (U) Basic Task No. Allocation of Effort/ % Funding (R&D) 6.1 30 6.2 20 6.3 10 6.4 10 6.5 25 7.0 5 SBCRET/NOF T 5 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 --~ ?fl/rr~ FI a Q,. IQ Q~96 00 9.R003Q400a,~ CONTRZ., I ~JMJi-:, R~eU ~~IY 1 L.I 1 OMB No. 0704-0188 Public reporting burden for this collection ? f Information Is estimated to average 440 hours per response, Including the time for reviewing Instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of Information. Send comments regarding this burden estimate or any other aspect of this collection of Information, Including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 4302,and tothe Office of Management and Budget, vaperwork Reduction Project (0704-0188). Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the ContracdPR No. listed in Block E. A.,fpJ RACT LINE ITEM NO. U(UJLL B. EXHIBIT B C. CATEGORY: TDP TM OTHER X D. SYSTEM/ITEM enomen0 ogica Research and-Analysis E. CONTRACT/PR NO. 330/025Z/92 F. CONTRACTOR SAIC 1. DATA ITEM NO. B001 2. TITLE OF DATA ITEM Contractor I s progress, status and management report 3. SUBTITLE Periodic Status Reports 4. AUTHORITY (Data Acquisition Document No.) S. CONTRACT REFERENCE S . 0 . W DI-MGMT-80227 C.6.1 'C.6.2 C.6.3 C.6.4 6. REQUIRING OFFICE DIA/ODT-S 7. DD 250 REQ 9. 01ST STATEMENT REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION BI-MO 5 DARC b. COPIES 8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Dr f Final A O a Reg epro R 16. EM eT Rflock 12: Contractor will rovide draft re ort QDT-S p p 5 DARP Draft will be returned within 7 workin da s TIP` . g y . 15. TOTAL 1. DATA ITEM NO. B002 2. TITLE OF DATA ITEM Technical Report-Study/Services 3. SUBTITLE Interim Technical Reports 4. AUTHORITY (Data Acquisition Document No.) DI-MISC-80508 S. CONTRACT REFERENCE S . 0 . W .6.1, C.6.2, C.6.3, C.6.4 6. REQUIRING OFFICE DIA/ODT-S 7. DD 250 REQ 9. DIST STATEMENT REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION 4TIME 5 DARC b. COPIES 8 APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE D ft Final A O ra Reg Repro 16. rEM a s f dock 12 Co a ill id d ft t t t ODT-S 2 2 e : n r or w prov c ra repor e 5 DARP D ft ill b d d t ithin 7 ki . ra w e re urne w wor ng ays. 1S. TOTAL 1. DATA ITEM NO. B003 2. TITLE OF DATA ITEM 3. SUBTITLE Final Technical Report 4. AUTHORITY (Data Acquisition Document No.) S. CONTRACT REFERENCE (C, . 0 . W . ) DI-MISC-80508 .6.1, C.6.2, C.6.3, C.6,4 6. REQUIRING OFFICE DIA/ODT-S 7. OD 250 REQ 9. DIST STATEMENT REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION ONE/R See block 16 b. COPIES a APP CODE 11. AS OF DATE C 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE D f Final A l ra t Reg Repro 16. REMARKS Ref Block 12: Contents of this report will QDT-S 2 6 encompass A002 plus any remaining contract period. provide draft report 5 DARP. Draft Contractor will , will 15. TOTAL -fir- 2 6 1. DATA ITEM NO. B004 2. TITLE OF DATA ITEM 3. SUBTITLE Special Report 4. AUTHORITY (Data Acquisition Document No.) DI-MISC-80508 S. CONTRACT REFERENCE SOW Para C.6.1 6. REQUIRING OFFICE DIA/ODT-S 7. OD 250 REQ 9. DIST STATEMENT REQUIRED 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION 5TIME SEE BLOCK 16 b. COPIES 8 APP CODE 11. AS OF DATE 13. DATE OF SBSEQUENT SUBMISSION a. ADDRESSEE D f Final 0 ra t Reg Repro 16. REMARKS Ref Block 12: COR will advise contractor on specific date for this congressional support item. SG1J H. DATE 10 DD Form 1423 JUO` 0 prey/ou 1 T J. DATE v4_%L-~TL ,nf )ems ,.... , 1161/183 Enclosure 9 18. ESTIMATED TOTAL PRICE 18. ESTIMATED TOTAL PRICE 18. ESTIMATED TOTAL PRICE 18. ESTIMATED TOTAL PRICE Approved For F I51se 20 ~g.%A-QP?&- oIW@'RR(R0004MOb4 (See DoD 5010. 12-M for detailed instructions.) FOR GOVERNMENT PERSONNEL Item A. Self-explanatory. Item B. Self-explanatory. Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM-Technical Manual; Other - other category of data, such as 'Provisioning.' 'Configuration Management'. etc. ftem'D. Enter name of system/item being acquired that data will support. Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). item G. Signature of preparer of CDRL. Item H. Date CDRL was prepared. Item L Signature of CDRL approval authority. item J. Date CDRL was approved. Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering. Rem 2. Enter title as it appears on data acquisition document cited in Item 4. Item 3. Enter subtitle of data item for further definition of data item (optional entry). Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements. Item S. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number). Item 6. Enter technical office responsible for ensuring adequacy of the data item. item 7. Specify requirement for inspection/acceptance of the data item by the Government. Item B. Specify requirement for approval of a draft before preparation of the final data item. Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24). Item 10. Specify number of times data items are to be delivered. Item 11. Specify as-of date of data item, when applicable. Item 12. Specify when first submittal is required. Item 13. Specify when subsequent submittals are required, when applicable. Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16. Item 15. Enter total number of draft/final copies to be delivered. Item 16. Use for additional/clarifying information for items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item. FOR THE CONTRACTOR Cl Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423. a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423. Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government b. Group It. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item. Estimated Price - Costs to be included under Group II are those Incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government. c. Group fit. Definition - Data which the contractor must develop for his internal use in performance of the. primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item. Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government. d. Group IV. Definition = Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal. Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost. Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract. ;D Form 1423 1pp . dMdOQlelease 2000/08/08 : CIA-RDP96-00789R003000440001-0 c Form Approved DATA ITEM DESCRIPTION OMENo.0704-0168 Egrp. Cate: Jun 30.1986 1. TITLE 2. IDENTIFICATION NUMBER Contractor's Progress, Status and Management Report DI-MGMT-80227 3. OESCRIP TION/PURPOSE 3.1 The Contractor's Progress, Status and Management Report indicates the progress of work and the status of the program and of the assigned tasks, reports costs, and informs of existing or potential problem areas. 4. APPROVAL DATE S. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC REQUIRED 6b. GIDE? REQUIRED (YYMMDO) N/SPAWAR 860905 7. APPLICATION I INTERRELATIONSHIP 7.1 This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task .requirement for this data included in the contract. 7.2 This DID may be applied in any-contract and during any program phase. 7.3 This DID supersedes DI-A-2090A, DI-A-3025A, UDI-A-22050B, UDI-A-22052A, UDI-A-23960, DI-A-30024, and DI-A-30606. (coat. on page 2) 8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER N3947 10. PREPARATION INSTRUCTIONS specific and 10.1 Contract - This data item is generated by the contract which contains a s dis crete work task to develop this data product. 10.2 Format - This report shall be typewritten on standard size (e.g. 8.1/2" by 11") white paper, and securely stapled: Pages shall be sequentially numbered. All attachments shall be identified and referenced in the text of the report. The report shall be prepared in the contractor's format and shall be legible and suitable for reproduction. 10.3 Content - The report shall include: a. A front cover sheet which includes the contractor's name and address, the - contract number, the nomenclature of the system or program, the date of the report, the period covered by the report, the title of the report, either the .serial number of the report or the Contract Data Requirements List (CDRL) -sequence number, the security classification, and the name of the issuing Government activity; b. Description of the progress made against milestones during the reporting period; c. Results, positive or negative, obtained related to previously-identified problem areas, with conclusions and recommendations; d. Any significant changes to the contractor's organization or method of operation, to the project management networks or to the milestone chart; e.- Problem areas affecting technical or scheduling elements, with background and any recommendations for solutions beyond the' scope of the contract.; f. Problem areas affecting cost elements, with background and any recommendations fo solutions beyond the scope of the contract; g. Cost curves showing actual and projected conditions throughout the contract; h. Any cost incurred for the reporting period and total contractual expenditures as of reporting date; i. Person-hours expended for-the reporting period and cumulatively for the contract; j. Any trips and significant results; (cont.-on page 2) 2 ?&G#S Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 /' '=Approved. For Release 2000/08/08 : CIA-PDP96-00789R003000440001-0 9-i Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 DI-MGMT- 80227 7. APPLICATION/INTERRELATIONSHIP (Cont'd) 7.4 Paragraphs 10.3.f, 10.3.g, and 10.3.h herein should be tailored on DD Form 1423 ? when such cost data is already submitted through a sophisticated cost reporting system under the contract. 10. PREPARATION INSTRUCTIONS (Cont'd) k. Record of all significant telephone calls and any commitments made by telephone; 1. Summary of Engineering Change Proposal (ECP) status, including identification of proposed ECPs, approved ECPs, and implemented ECPs; m. Contract schedule status; n. Plans for activities during the following reporting period; o. Name and telephone number of preparer of the report; p. Appendixes for any necessary tables, references, photographs, illustrations, and charts. *U.S. GOVERNMENT PRINTING OFFICE: 1986-704-037150176 k. Approved For Release 2000/08/08 : `CIA-RDP96-00789R00300044460 r l -s1 si~ _ _ ^ _ _ ~. _ _ . -.._.. _00 - A rJW9d Form Approved OMB No. 0704-0188 2. TITLE 1. IDENTIFICATION NUMBER Technical Report - Study/Services DI-MISC-80508 3. DESCRIPTION/PURPOSE 3.1 A technical report provides fully documented results of studies or analyses performed. 4.;APPROVAL DATE 5. OFFICE OF PRIMARY 6a.DTIC 6b.GIDEP (YYMMDD) RESPONSIBILITY(OPR) APPLICABLE APPLICABLE 880115 G/T2137 X 7. APPLICATION/INTERRELATIONSHIP 7.1 This data item description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract. 7.2 This DID supersedes DI-A-5029. 7.3 Defense Technical Information Center (DTIC), Cameron Station, Alexandria, VA 22314. B. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER G4291 10. PREPARATION INSTRUCTIONS 10.1 Format. (a) The report and all attachments shall be typewritten, or otherwise clearly lettered, and shall be duplicated using non-fading ink. (b) Text shall be prepared on standard letter size paper (e 1/2" X 11"). (c) When attachments are included, they shall be fully identified, referenced in the text, and folded to conform to the size paper used in the report. . (d) Security classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist? as applicable. 10.2 Content. (a) Title Page - Identifies the report by providing contract number, project name or purchase description title, task number, and reporting period. (continued on page 2) 11. DISTRIBUTION STATEMENT DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Fore 1664, JUN 86 (FACSINILE) Previous editions are obsolete. ' Approved For Release 2000/08/08 : CIA-RDP96-00789R00300044000pV. I of 2 Pages Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0 DI-MGMT- 80508 Block 10. Preparation Instructions (Continued) (b) Table of Contents (c) Section I - Includes the following: (1) Introduction (2) Summary - A brief statement of results obtained from the analytic effort. (3) Conclusions and their condensed technical substantiations. (d) Section II - A complete and detailed description of the analytic results which led to the conclusions stated in Section I above. Page 2 of 2 Pages Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0