PAG-TA MONTHLY ACTIVITY REPORT - AUGUST 1993
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP96-00789R002500230056-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
November 4, 2016
Document Release Date:
April 27, 2000
Sequence Number:
56
Case Number:
Publication Date:
September 7, 1993
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP96-00789R002500230056-9.pdf | 198.83 KB |
Body:
Approved For Release 2000: CIA-RDP96-00789R002500230056-9
UNITED STATES GOVERNMENT
memorandum
DATE: 7 September 93
RATTN TO : PAG-TA
S-28,082/PAG-TA
SUBJECT: PAG-TA Monthly Activity Report - August 1993 (U)
1. (U) Personnel:
- Action taken to update all Activity SF-52's, and
position descriptions. Action to be completed NLT
10 Sep 93.
- Activity TDA authorization reduced from 11 to 10
positions at NMIPC direction.
2. (U) Administration:
- Zero base review of Activity files completed.
- Coordination effected with DIA physical security for
removal and destruction of classified and nonpulpable
material from our facility.
- Activity functional file system established.
- Game plan for move to Building 2845 updated. With the
transfer of FT. Meade from FORSCOM to MDW, we have been
advised that our move from our present facilities will
not occur until Jan 94. On-going dialogue with Ft.
Meade/DIA points of contact continuing. A letter has
been drafted requesting cost estimates to renovate our
new facility will allow us to store classified material
at the SCI level. This will allow us to have HIGGINS
and access to SAFE at Ft. Meade. Copies of the letter
will be furnished to Post and DIA points of contact in
early September.
REPRODUCTION REQUIRES WARNING NOTICE-INTELLIGENCE
APPROVAL OF ORIGINATOR SOURCES OR METHODS INVOLVED
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DoD AUTHORITY
CLASSIFIED BY MULTIPLE SOURCES
DECLASSIFY ON OADR
OPTIONAL FORM NO. 10
(REV. 1-60)
NOT RELEASABLE TO FOREIGN NATIONALS GSA FPMR
41 CFR) 101-11.6
Approved For Release 2000/08iRCd* DP96-00789R002500 0056-9
Approved For Release 2000/08/0 6-00789R002500230056-9
Memo sent to DIAC requesting seven STU-III phones. DIAC
personnel will install in early September. The
additions w$Q1Give us a total of eic t1jTU-III phones.
24 Aug 93: met with to
receive the es used f DIA
correspondence. As a result, an office correspondence
manual was prepared for reference.
3. (U) Training: SG1J
- 2-3 Aug 93: completed Sybase training
(Introduction t&G ructure Query Language (SQL)).
- 26-27 Aug 93: completed the Contracting for
Contracting Officer s Representatives course.
4. (U) Travel: SG1J
- Due to sickness, was unable to attend the
annual Parapsych ociation meeting in
Toronto, Canada.
- FY 94 Activity travel plan was drafted. Will be
forwarded to PAG in early September.
5. (U) Transportation/Logistics:
- No change from August 93.
- Activity facilities continue to be "spruced up".
6. (S/NF/WN/SG/:? JS) Operations:
SG1 B
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DoD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
Approved For R AWis HM68A I 0 -ffi9ft1500230056-9
Approved For Release 2000/08/ 96-00789R002500230056-9
SG1J
- 5 Aug 93: et
SG1 B
SG1 B
Memo prepared for PAG/PA/PC.
note drafted per request of Mr. Berbrich.
- 5 Aug 93: Responded to NMIPC tasker #93-022363, subject:
"Peace Shield Campaign" letter to Dir,
DIA - 13 Jul 93). Response signe =EMIR by PAG to
SGFOIA SGFOIA3
SG1 H
SG1 B
SG1J
with a Johns Hopkins Physics Laboratory (APL) physicist
concerning information received regarding research,
- 17 Aug 93: Responded to NMIPC tasker #93-022793, subject:
Request for letter on "STAR GATE". Background letter and
covering letter providing updated program status for key
Congressional staffers forwarded thru PAG/PA to PC for Mr.
Berbrich's signature.
- 17 Aug 93: Met with key U.S. Army personnel of the Target
Exploitation Division to discuss Activity Program.
Division Chief (Adam Henritzy) is amenable to working with
us. Program briefing for Commanders of the FIC/FIA and
their senior operations personnel is to be scheduled for
mid-September 93.
- 18 Aug 93: chaired the monthly, interagency
Scientific and Technical Intelligence Subcommittee -
Collection (STIC-C) meeting. Meeting minutes published
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
Approved For R NSsHM68T i4Afi? -6ffl9Rbh00230056-9
Approved For Release 2000/08 -OO789ROO25OO23OO56-9
SG1 B
SG1 B
in the 24 Aug 93 msg announcing the agenda for the
8 September meeting. Copy of message furnished to PAG/PA
for information.
- 23 Aug 93: Forwarded to DAP-4 a modified statement of
work (SOW) for the $24K contract add-on to provide this
Activity with an electronic data base to support
intelligence assessment activities and a viewer
certification program.
- 25 Aug 93: Briefed Deputy Director, PA and Director, PG
on program.
- 30 Aug 93: Prepared Activity response to FSTC article on
- 31 Aug 93: Conducted an in-depth review on operations
(in-house investigations). Results include development
of an FY94 training plan, briefing, and drafting of
protocols for operations and personnel selection.
- Two additional designated projects completed. To date
six projects have been completed. One additional
report provided to requestor and to PAG in August 93.
- FY 94 Activity production plan is being developed.
Estimated completion date is o/a 30 Sep 93.
reviewed and filed
classified and open source literature on Activity related
R&D efforts in Russia, FSU, Europe, China, - and SG6A
Central and South America.
7. ($31Jiture Highlights:
will brief commander's of the U.S. Army
FIC FIA on program activities in mid-September 93.
- 10 Sep: Activity is hosting an office picnic.
REPRODUCTION REQUIRES WARNING NOTICE-INTELLIGENCE
APPROVAL OF ORIGINATOR SOURCES OR METHODS INVOLVED
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DoD AUTHORITY
Approved For ReY&ffs99/I4--$bb2500230056-9
Approved For Release 2000/08/ 6-00789R002500230056-9
SG1J
- 29 Sep - 1 Oct 93: is scheduled to attend
the White House Workshop: A Public Policy Seminar.
SG1J - 16 - 17 Nov 93: re
scheduled to attend the classified non-let al conference
sponsored by the Los Alamos National Laboratory and
hosted by the Johns Hopkins Applied Physics laboratory
in Laurel, MD.
8. (U) Other:
- Enclosed FYI are the Aug 93 individual monthly activity
SGFOIA3 reports.
SG1J
4 Enclosures:
1. Activity Repor
(C/NF) 1 Cy
2. Activity Repor
(U) 1 Cy
3. Activity Repor
(U) 1 Cy
4. Activity Repor
(U) 1 Cy
REPRODUCTION REQUIRES WARNING NOTICE-INTELLIGENCE
APPROVAL OF ORIGINATOR SOURCES OR METHODS INVOLVED
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DoD AUTHORITY
MSINNMDV~
Approved For R @Ws8 'aR A;l 9 ~-~~?~~1500230056-9