PAG-TA MONTHLY ACTIVITY REPORT - DECEMBER 1994
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP96-00789R002500230012-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
November 4, 2016
Document Release Date:
April 27, 2000
Sequence Number:
12
Case Number:
Publication Date:
January 25, 1995
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP96-00789R002500230012-7.pdf | 97.4 KB |
Body:
Approved For Release 2000/08/08 : CIA-RL ,9r610D789R002500230012-7
UNITED STATES GOVERNMENT
memorandum
DATE: 25 January 1995 S-23,003/PAG-TA
REPLY TO
ATTN OF: PAG-TA
SuBJEcT: PAG-TA Monthly Activity Report - December 1994 (U)
To: PAG
1. (U) Personnel:
- Per NMIPC (P-AS1) our authorized strength remains at
~;jGjaj.th seven personnel assigned.
was offered and accepted a position in
the NMISC (SV-3). Effective date of the transfer is
23 Jan 95.
2. (U) Administration:
- PAG-TA move to Building 2845 is scheduled for 19 Jan 95.
- Clean up day at old facility was h7Mjon 2 Dec 94.
- W8)promotion packets provided to
for completion.
3. (U) Training:
- None.
4. (C) Travel:
- None.
5. (U) Transportation/Logistics:
- Dec 94 mileage report forwarded to DAL-2 on
on 4 Jan 95.
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
CLASSIFIED BY MULTIPLE SOURCES
DECLASSIFY ON OADR
OPTIONAL FORM NO. 10
IR_ 1-801
Approved For Relem!90ftWLQ?AIM&R Wd $> MtUVAI&7 G
SAFPMR(41CFR)101-11.6
STAR GATE 5010-114
Approved For Release 2000/08/08 : CIA-RDP96-00789R002500230012-7
6. (S/NF/WN/SG/LIMDIS) Operations:
- To date, we have completed six projects in support of
PAN/PAG. Additional requirements from PAG-1 are
anticipated.
- Four projects were conducted in support of Joint
Interagency Task Force-West (formerly JTF-5)
requirements. Since 3 Mar 94 we have completed 33
projects.
- Four projects were conducted in support of Joint
Interagency Task Force-East (formerly JTF-4)
requirements. To date we have completed eight projects.
- Software and the optical disk drive for our foreign data
base management system installed. We are awaiting for
the contractor to install the program that will preclude
the data to be stored on the hard disk drive.
- 6 Dec 94: At our initiative we briefed key CIA/CMS reps
regarding our mission, functions and organization.
Memorandum forwarded as to results.
- 13 Dec 94: Project STAR GATE status report provided to
PDO in respc8GeJto a SAPOC request for information.
- 14 Dec 94: chaired the monthly STIC-C
meeting. M 1J as to results and sent to
STIC/STIC-C address
- 15 Dec 95: Mes . opm
met with at our location regarding mission
requirements. as drafted protocols for our
follow-on support a& 3.irities.
- 5/8/12/19 Dec 94: ttended Technical
SG1C Intelligence Collection Review (TICR) meetings. He is
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
Approved For Relea 8~0 fig(> , i -r~IGN 0HW39M-
STAR GATE
Approved For Release 2000/08/08 : Cl ~QR002500230012-7
SG1C
7. (S/NF/SG/LIMDIS) Future Highlights:
- 19 Jan 95: Move to Building 2845.
- Continued participation TICR participation through
Feb 95.
- CDA respons(6(r,4 JSAC due.
- 11 Jan 95: tc8(so6A3monthly STIC-C meeting.
8. (U) Other:
- None.
REPRODUCTION REQUIRES WARNING NOTICE-INTELLIGENCE
APPROVAL OF ORIGINATOR SOURCES OR METHODS INVOLVED
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
NOT RELEASABLE TO FOREIGN NATIONALS
Approved For Release 2000/08/08: CI94"t89R002500230012-7