PAG-TA MONTHLY ACTIVITY REPORT - JANUARY 1995
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP96-00789R002500230011-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
November 4, 2016
Document Release Date:
November 12, 2002
Sequence Number:
11
Case Number:
Publication Date:
February 9, 1995
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP96-00789R002500230011-8.pdf | 108.34 KB |
Body:
memorandum
DATE: 9 February 1995 S-23,011/PAG-TA
REPLY TO
ATTN OF: PAG-TA
suerECT: PAG-TA Monthly Activity Report - January 1995 (U)
To: PAG
1. (U) Personnel:
- Per NMIPC (P-AS1) our authorized strength remains at
11 with six personnel assigned.
SG1J - SIO, PAG-TA, was offered and accepted
a position in the NMISC (SV-3). Effective date of the
transfer was 23 Jan 95.
2. (U) Administration:
SG1J
Approved For Release 2003/0 - P96-00789R002500230011-8
PAG-TA move to Building 2845 was effected on 19 Jan 95.
A superb team effort by all our personnel. Special
thanks to DAL for their logistical/manpower support.
Especially commendable was the effort of
s our POC for this move; it would not have been
shed without his effort.
- Removal of excess property from former facility
scheduled for 9 Feb 95.
3. (U) Training:
- None.
4. (C) Travel:
- None.
5. (U) Transportation/Logistics:
- Jan 95 mileage report forwarded to DAL-2 on
on 8 Feb 95.
REPRODUCTION REQUIRES WARNING NOTICE-INTELLIGENCE
APPROVAL OF ORIGINATOR SOURCES OR METHODS INVOLVED
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
CLASSIFIED BY MULTIPLE SOURCES
DECLASSIFY ON OADR
OPTIONAL FORM NO. 10
Approved F~-ie1~~17T~1~~p0(~Ig2300 K~#E8 1-~)
GSA FPMR (41 CFR) f01-11.6
STAR GATE 5010-114
SG1J
Approved For Release 2003/01/17 : CIA-RDP96-00789R002500230011-8
SG1A
6. (S/NF/WN/SG/LiMDIS) Operations:
- To date, we have completed six projects in support of
PAN/PAG. Additional requirements from PAG-1 are
anticipated.
No projects were conducted in support of Joint
Interagency Task Force-West (formerly JTF-5)
requirements during Jan 95. Since 3 Mar 94 we have
completed 33 projects.
One project was conducted in support of Joint
Interagency Task Force-East (formerly JTF-4)
requirements. To date we have completed nine projects.
One project was conducted in support of ONI requirements
(counterdrug) during Jan 95. Operations initiated in
support of briefings conducted at the NMIC during
Dec 94.
Software and the optical disk drive for our foreign data
base management system installed. We are awaiting for
the contractor to install the program that will preclude
the data to be stored on the hard dick drive during the
early part of Feb 95 . I lis our focal ou l J
point for this effort.
SG1J
SG1C
11 Jan 95: chaired the monthly STIC-C
meeting. MSG prepared as to results and sent to
STIC/STIC-C addressees.
26 Jan 95: briefed
Patricia Keith, ocean Resources Branch, and Lynn Wright,
Ocean Web Production, ONI. Requirements to follow.
3/10/13/17/20/24/31 Jan 95: ttended
Technical Intelligence Collection
(TICK)/Community Steering Group meetings. He is
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
SG1J
SG1J
Approved F%NIE$/ N 41M&0N7J(b30011-8
STAR GATE
Approved For Release 2003/01/17 : CIr96-00789RO02500230011-8
SG1C
7. (S/NF/SG/LIMDIS) Future Highlights:
- 6 Feb 95: Meeting set with c
Project STAR GATE program manager.
- Continued participation TICR participation through
Feb 95.
- CDA response to SAC due to GS.
to chair monthly STIC-C meeting.
- 15 Feb: Meeting scheduled with
8. (U) Other:
- None.
PAG-TA
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
IORD/CIA, new
ORD/CIA.
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
SG1I
SG1J
'JayBW8230011-8
Approved FQJlJl i&1 477&"0
STAR GATE