INITIATION OF INSCOM GRILL FLAME PROJECT (IGFP) CONTRACT PHASE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP96-00788R002000150001-4
Release Decision:
RIFPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
November 4, 2016
Document Release Date:
June 22, 1998
Sequence Number:
1
Case Number:
Publication Date:
May 16, 1979
Content Type:
MFR
File:
Attachment | Size |
---|---|
CIA-RDP96-00788R002000150001-4.pdf | 77.34 KB |
Body:
Approved For Release 2001 /03/0 . 0788R002000150001-4
DEPARTMENT OF THE ARMY
US ARMY INTELLIGENCE AND SECURITY COMMAND
FORT GEORGE G. MEADE, MARYLAND 20755
16 May 1979
SUBJECT: Initiation of INSCOM GRILL FLAME Project (IGFP)
Contract Phase (U)
1. (S) On 14 May 1979, the first of six selected. INSCOM
personnel began training in remote viewing (RV) at SRI, Menlo
Park, California. Attached hereto is a handout which SRI
provided explaining the planned activities at SRI during the
initial phases of the training cycle.
2. (S) One RV session was conducted while the undersigned
was at SRI. It was very successful and all were glad to get
off to a good start.
3. (U) Of particular note to the undersigned was the lack
of OPSEC at SRI. Much of their work is unclassified and it
appeared as though there was a lack of respect for security
of the IGFP.
CLASSIFIED BY: Director, DIA
DECLASSIFY ON: 16 May 99
EXTENDED BY: Director, DIA
REASON: 2-301-C (3) (6)
Approved For Release 2001 /03/ ,% .q 96-00j&r8 0L0L0TIVANE
?11E
1.~7~ 111~~ il..~~
.14-1141W
4. (S) SRI personnel have proposed the use of a PSE as an
evaluation aid. They plan to use the PSE on the RV session
tapes produced by IGFP remote viewers. The MI community has
generally taken a dim view of the use of a PSE because it can
be employed clandestinely against a suspect or subject of an
investigation, Obviously, SRI does not plan or propose such
a scheme. But perhaps OACSI should make a legal determination
in this matter similar to the one governing the use of record-
ing devices in the IGFP. Attached is information explaining
the PSE which was obtained from Tech Div, 902d MI Group.
'Approved For Release 20
DP96-00788R002000150001-4
IAFM-OPS-HUP 16 May 1979
SUBJECT: Initiation of INSCOM GRILL FLAME Project (IGFP)
Contract Phase (U)
5. (U) Contractor personnel have requested a two week
break in the training cycle from 2 through 13 July 1979.
A tentative agreement was reached that Colonel Hamel and
Major Watt would meet with contractor personnel the week
of 16 July 1979 to determine which trainees will continue
the follow-on portion.
147
Incl FREDERICK H. ATWATER
as 1LT, MI
Operations Officer, IGFP