LOGNOTE....OPERATIONS GROUP....22 OCTOBER 1986
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP94-00798R000200180004-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 27, 2016
Document Release Date:
January 28, 2013
Sequence Number:
4
Case Number:
Publication Date:
October 22, 1986
Content Type:
MISC
File:
Attachment | Size |
---|---|
CIA-RDP94-00798R000200180004-2.pdf | 123.95 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2013/01/28: CIA-RDP94-00798R000200180004-2
OPERATIONS GROUP FILE
LOGNOTE OPERATIONS GROUP 22 October 1986
FIELD BUREAU AUTOMATION -- Plans for FBIS field STAT
bureau modernization were reviewed at LEC in Plainfield, New
Jersey, during the AFS Program Review on 21 October 1986.
It was reported that -- at FBIS direction -- planning for
FBIS field bureau modernization was currently being held in
abeyance. FBIS has instead directed LEC to develop a "Quick
Reaction Communication Plan" (QRC Plan) for field bureaus.
Attached is LEC's current "time line" plan for the QRC Plan.
During a Bureau Operability Group (BOG) meeting on 10
October, DC/ADD discussed the QRC Plan. I did STAT
not attend but FPO/DRD, attended and I routed blAl
her lognote on the meeting through C/Ops office.
LEC and ADD met on 14 October and reviewed the commo
requirements for Key West bureau's QRC Plan. Key West is
expected to be completed (all equipment in place, system up
and running) by this Thanksgiving! Another meeting is
scheduled for the last week in October. I don't believe
any Ops Group representative attended (or is invited) to
the discussions on bureau commo requirements.
Continuing the discussion of field bureau modernization,
and related to the QRC Plan at Key West, I mentioned my belief
that a requirement existed for LEC to ensure that their designs
include the capability of supporting the CRW designed BACH
header generation software. LEC said they would look at the
BACH program as much as their tight schedule permitted but that
the integratio_n_ol_BAEH_m_as not a requirement on their design.
DC/ADD informed me that LEC's field bureau STAT
design was required to follow "system specification" documents
already formalized which DID NOT include the BACH software
requirement. DC/ADD said CRW's BACH documentation was faulty,
and BACH's configuration control was highly suspect. CRW has
modified (individualized) BACH's software for use in specific
bureaus (Vienna's BACH is different from Hong Kong's which is
different from Okinawa's which is ...). According to DC/ADD,
requiring LEC to integrate BACH into LEC's design would be
like asking them to "hit a moving target."
Declassified in Part - Sanitized Copy Approved for Release 2013/01/28: CIA-RDP94-00798R000200180004-2
Sanitized Copy Approved for Release 2013/01/28: CIA-RDP94-00798R000200180004-2
TASK
FIELD BUREAU - ORC PLAN
1986 -4-
11/1 11/15 12/1 12/15 1/1 1/15
111_1
2/1 2/15 3/1
1 1
1987
3/15 4/1 4/15 5/1 5/15
Ill
FBIS PROVIDE
DATA ON BACH &
EXISTING-SW
KEY WEST REQ REVIEWS
KEY WEST PRESHIP
KEY WEST SITE ACTIVITY
LEC QRC STUDY
& PROGRAM PLAN
LEC LAN DEVELOPMENT
FACILITY
1co
10/14
10/27
11/12 EARLIEST
IOC EARLIEST
? -1111117
REVIEW REQ & DR
EXIST SW
IOC
BUY HW/SW 17
2/15
PRESHIP
REVIEW
DEVELOP FB#1
& FACTORY TEST ?1111111.1111 START
l&T
SHIP TO SITE (HW/SW)
SITE ACTIVITY
SHIP BALANCE
OF FBs
FI3#1
IOC
ONE
PER MONTH
?Z
AFS-485
NOTES: AUTODIN FBs LAST (INCLUDES LONDON)
LAST FB IOC MID 1988
23
Declassified in Part - Sanitized Copy Approved for Release 2013/01/28: CIA-RDP94-00798R000200180004-2
Declassified in Part - Sanitized Copy Approved for Release 2013/01/28: CIA-RDP94-00798R000200180004-2
ROUTING AND TRANSMITTAL 460
Dato
22 Oct 86
TOt Crew symbol, room number,
Alencyflrose
L EO/Ops
Mitlab
11Mr
Ode
& DC/Ops
& C/Ops
2 e 6
4.
I.
mice
MN
Notemod Worn
Ammmd
For Mama
Per amommthm
As MmumMod
For Comas-gem
PiePare itaPil
Maoists
For Voir Information
'SOO NM
Dammed
MdarillOie
Signature
amitalittathm
Justify
=Man
- I have no idea what all is involved
in the QRC Plan. I would recommend that
C/Ops request ESG brief Ops personnel on
current plans.
I was really surprised that LEC (and ADD)
had never planned on using the BACH program
in the final version of field bureau
modernization. This could be as big a
shock to others as it was to me.
70 pi,' /114 ? Atif eafr
ks;fLa- -14.44;0 tkiattc,
4144. t*urvw/, Itt s g
1?.1tiOT use tirs form as a REOORD ofconeurranoss, disposals. - ?
dioramas, sod actions
Room No.?Bldg.
FROM: (Nam org. symbol, AlroncY/Post)
SA/Ops
Mono No.
S041-102
u.S.3.P.0.:19113 -421-529/320
Declassified in Part - Sanitized Copy Approved for Release 2013/01/28: CIA-RDP94-00798R000200180004-2
OPTIONAL FORM 41 (Rev. 7-70