INTEGRATION PROCESS FOR NEW SOVIET SS-25 ICBM REGIMENTS

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP91T01115R000400650002-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
19
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 18, 2012
Sequence Number: 
2
Case Number: 
Publication Date: 
November 1, 1987
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP91T01115R000400650002-9.pdf570.97 KB
Body: 
Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 NOFORN- Not Releasable to Foreign Nationals NOCONTRACT- Not Releasable to Contractors or Contractor/Consultants PROPIN- Caution-Proprietary Information Involved ORCON- Dissemination and Extraction of Information Controlled by Originator REL ...- This Information has been Authorized for Release to .. . Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret) 25X1 NOFORN NOCONTRACT ~ ~ 25X1 Central Intelligence Agency Washinglun. D C 20505 Directorate of Intelligence November 1987 Integration Process for New Soviet SS-25 ICBM Regiments Summary Since early 1985, the Soviets have deployed a total of 10 regiments of their road-mobile SS-25 ICBMs among three deployment complexes--Yoshkar-01a, Yur'va, and Verkhnvava Sa1da. We have determined, that the launch-critical units of an SS-25 regiment must undergo a complex integration process before the regiment is fully capable of conducting combat operations. The integration process includes the delivery, inspection, and assembly of the launchers, missiles, warheads, and launch support elements that make up an SS-25 regiment. The identification of the integration process enables us to better determine the size of the SS-25 ICBM force, and to a lessen- degree, its readiness. In the past, the size of the SS-25 force was thought to be equivalent to the number of bases that were comp.Zete and capable of housing operational units. Today, through increased Information available as of. 31 Augus>: .7987 was used in this report. .5X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret operational SS-25 launchers and the length of time required for these launchers to be readied for combat duty. Analysis of the integration process for the first 10 SS-25 regiments indicates that integration times varied greatly--from eight weeks to several months. The evidence is tenuous, but it is possible that even after their initial integration, SS-25 regiments may sti11 not be fu11y capable of conducting combat operations, or operating at fu11 readiness and reliability Zevels. Imagery shows that some SS-25 regiments returned to their associated divisional support facilities for additional processing shortly after their initial integration process was completed. We are uncertain if this activity is related to a fine-tuning of the system to correct any problems that may have developed during initial field deployment, or if this activity is actually part of the integration process. If it is part of the process, then the time necessary to integrate an SS-25 regiment extends well beyond eight weeks. We expect that as the Soviets gain familiarity and proficiency with the SS-25 system, the length of time required for integration may be reduced somewhat. In the instances when elements of two or more regiments were delivered to a deployment complex simultaneously, the Soviets probably integrated at Least one battalion in each regiment rather than fu11y integrating all three battalions of any one regiment. This was probably done to give each regiment at Zeast a minimum launch capability should war break out during integration. We are not certain, but it is possible that some SS-25 regiments participated in field training exercises ,before having all three battalions fully operational. 2 Top Secret 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Introduction The road-mobile SS-25 ICBM is a three-stage, solid-propellant missile carrying one reentry vehicle (RV). The SS-25 missile and RV are contained in a canister and mounted on a seven-axle transporter-erector-launcher (TEL). In 1985, the SS-25 became operational, and 72 launchers were deployed among eight bases in the Yoshkar-Ola, Yur'ya, and Verkhnyaya Salda missile complexes (figure 1). During 1986, the Soviets added two more bases at the Verkhnyaya Salda complex. An SS-25 regiment is garrisoned in the operations area of each base (figure 2). A regiment includes three launch battalions and one battalion that provides regimental command and control functions. Each of these launch battalions contains three TELs and associated missile support vehicles (MSVs). A regiment also inrl-~zdes field support units that are normally housed in either the operations area or in an adjacent regimental support area. Figure 3 shows the organization of an SS-25 regiment. Figure 1 Soviet SS-25 Mobile Missile Bases, August 1987 ^ Operational SS-25 base ? Completed SS-25 base ^ SS-25 base under construction r ~ 7eyNOVO (2) ~~~~ ~,~~~ Moscow c~ ~~ Yur'ya (5) ~~ ^ ,/ n k q' f 1( ~ Yoshkar-Ola "''~~ ~ ~~ ~,.r ~ 1 %'~Verkhnyeya Seale (I) ~ k Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret 25X1 Figure 3 SS-25 Unit Organization Regimental C' Battalion Security/ Reconnaissance To become operational and launch-capable, the three launch battalions of an SS-25 regiment undergo a complex integration process at the division-level Integration is the process whereby the various elements of an SS- 25 regiment are delivered to the deployment complex, inspected, and assembled into an operational unit. We have not observed the entire process for any single regiment, e irs - regimen s o ecome operational. This paper describes the integration process for new regiments, the facilities located at the deployment complexes associated with this process, and the time requi a process for each of the first 10 regiments. 5 Top Secret Missile/Vehicle Maintenance Command, Control & Communications 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Key Elements of an SS-25 Regiment An SS-25 regiment is not delivered to a deployment complex ready to conduct combat operations. Because of their diversity, the elements comprising a regiment are developed or produced at different national-level facilities across the Soviet Union. The elements are then routed through a logistics network and delivered separately by rail to the rail-to-road transfer point (RTP) of a deployment complex (figure 4). Various logistic and scheduling considerations require that regimental elements be ~3el;vPrPd to the RTP on a set schedule, usually in battalions. The key elements of an SS-25 regiment are personnel; field support units; command, control, and communications (C3) units; TELs and MSVs; missiles and non-nuclear payload components; and RVs. Preparation and Delivery of the Key Elements of an SS-25 Regiment Personnel The combat Zaunch crews and support t:z?oops serving with SS-25 regiments have received extensive training by the time they reach their regimental base. The combat cz-ews are trained at the Plesetsk Missile Test Center while the support troops are trained at Strategic Rocket Force (SRF) specialist schools and also at Plesetsk. Combat crews train together as a regiment. Training usually lasts six weeks and culminates in a missi_Ze Zaunch. Upon completion of training, combat crews and suppoz-t troops either report directly to their base for duty oz? to an _i.nterim Zocation to atrait the completion of their base. Support tz~oops may arrive months ahead of regimental combat launch crews. Some personnel may report to an, SS-25 regiment fo_Z.lowinq reassignment from another SRF unit. Field_Support Units The support units of a regiment inc_iude combat engineering, security and reconnaissance, general t:r?ansport, driver training, and topographic. and survey. Of these, only driver training units contain equipment and vehicles that are rznique to the SRF. After production, all vehicles are transfez~red to the SRF, routed through a logistics network, and delivered to an RTP. Vehicles and equipment rrray be temporarily stoz?ed at a missile support rear depot (MSRD) during this process. C3 Units The C3 units discussed in this papez- are those associated with the regimental command post (CP) and its three subordinate battalion CPs. The regimental and the three subordinate 6 Top Secret Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 battalions' CPs train with theiz? Launch elements at Plesetsk. Because C3 is an integral part of a mobile missile unit, it is likely that the CPs and launch elements of a regiment are routed together through the logistics network. These CPs have several MSVs--large four-axle MAZ vehicles containing power generators and communications, electronics, and r_omputer equipment--and standard van-bodied trucks containing radio stations. The logistics network for C3 units is the same as fo.r TELs and MSVs. TELs and_M5Vs The TELs and MSVs for SS-25 Launch battalions a.re assembled at the Volgograd Steel and Machine Plant and use large, modified MAZ-543 chassis built at Minsk. Aftez? production is completed, TELs and MSVs are transported via rail to Plesetsk for use in combat cz?ew training or to an MSRD foz- intez-im storage. At Plesetsk, regimental combat crews train with their TELs and MSVs in battalion units. After training, f:he crews and equipment are shipped to a deployment complex RT.P. TFI.,s and MSVs are shipped in battalions to retain unit integrity. An SS-25, launch battalion consists of three .TELs and at -least five MSVs. Missiles and Non-nuclear Payload Components SS-25 missiles and their associated non-nuclear payload components are final assembled at Votkinsk and then shipped either to Plesetsk for use in crew training or to Bobroyskiy MSRD for temporary storage. Top Secret 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret 25X1 Figure 5 SS-25 Integration Sequence Delivery of Field Support Units Delivery of Personnel Secret NOFORN 2 4 6 g Week a Delivery and inspection of TELs, MSVs, C', missiles, payload-associated components and nuclear warheads for regiment. Integration Process for SS-25 Regiments The integration process for an SS-25 regiment includes delivery, inspection, and assembly (figure 5). Integration times varied greatly among the first 10 regiments. However, it appears that at least two or three weeks were required to complete integration for each launch battalion, or about eight weeks for an entire regiment. Most of the time and effort in the integration process is devoted to the inspection and assembly of the regimental Delivery The elements composing an SS-25 regiment generally are delivered in the following sequence: personnel, field support units, C3 units, TELs and MSVs, missiles and non-nuclear payload- associated components, and RVs. This sequence will not vary significantly because of logistic constraints. Some personnel and field support unit probably arrive weeks or months ahead of the launch equipment. The early arrival of these elements reflects the Soviet desire to create a functioning infrastructure before the missiles and launchers arrive. Because they are potentially long-lead items, the time required to deliver personnel and ,field support units is not included in our eight-week estimate. 9 Top Secret Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 After the personnel and field support units arrive, SS-25 launch- related equipment--TELs, MSVs, and C3 units--is delivered to the RTP in integral units (figure 6). The C3 units arrive first, probably to establish a functioning network for control of the nuclear assets. The Soviets have demonstrated that they can offload nearly an entire regiment of launch equipment (about 30 vehicles) from rail flatcars in one or two days. TELs and MSVs then go to their associated base to await the delivery of the missiles. This practice results in launch-related equipment sometimes being imaged at a base, well before a regiment is launch capable. Normally, within days of TEL and MSV delivery, a regiment's missiles and payload-associated crates are delivered in battalion groupings to the RTP (figure 7). Missiles are then transferred directly onto TELs while the payload component crates are loaded d-associated ters. 25X1 25X1 Inspection of TELs and MSVs probably occurs shortly after their delivery to the RTP. TELs and MSVs are inspected for any damage sustained during shipment. Inspection probably occurs in the clerestory building, driver training areas, and the regimental base. TELs are probably checked for performance of erecting mechanisms, leveling jacks, and general vehicle capabilities. MSVs are probably also tested for basic vehicle performance, as well as reliability of their electronics, computer, and communications equipment. After inspection, TELs and MSVs probably return to their base to await the arrival of missiles and payload-associated crates. Next, the payloads and missiles are inspected, and the payload is assembled to the missile. Upon arrival, the payload-associated crates are unloaded from their railcar and normally taken to the NPHF for unpacking.2 At the same time, missiles are transferred directly onto the TELs from their railcars, and the TELs are However, in 1985, at Yur'ya and Verkhynyaya Salda, when the Soviets were integrating more than one regiment at a time, these crates were often taken to other nearby locations for interim storage until needed. For example, numerous sets at Yur'ya were stored at a deactivated SS-7 base. 10 Top Secret Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret) 25X1 driven into the high one-bay and two-bay buildings where the missiles' electrical and propulsion systems are inspected (figure 9). During this time, the non-nuclear payload-associated components--probably including the guidance system and its interfacing structures--are inspected and tested. These components are then assembled to the missile and checked for compatibility. Probably the guidance system's instruments are calibrated, targeting information is in utted, and a simulated flight profile is run. A dual-masted MSV for each TEL being tested, is located outside of the high one-bay and Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Q Next 2 Page(s) In Document Denied Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret two-bay buildings during this procedure (figure 10). The MSV probably monitors missile and guidance diagnostics while providing a C3 interface with the battalion CP, essentially providing the same power, computer, and electronics support to the TEL that it provides when the TEL is field deployed. 25X1 25X1 The RV is the last major element assembled to the SS-25 s stem. It is probably prepared (a 25X1 process that includes the installation of safe, arming, and fuzing mechanisms) and then driven to and mated to the 25X1 missile's post-boost vehicle. After a final checkout, the launch battalions of the integrated SS-25 regiment are driven back to their base.3 Once all three battalions have been integrated and returned to their base the Soviets probably check the C3 links within the regiment. 25X1 The procedures described in this paper have been devoted primarily to the mechanical aspects of integration. However, an SS-25 regiment's capability to successfully fulfill its mission extends beyond the inspection and assembly of components. As a result, an SS-25 regiment is probably not fully operational until the availability of three bays allows the Soviets to 25X1 integrate an entire launch battalion simultaneously. While one battalion the regiment's other two battalions are 25X1 probably in other stages of the integration process. The delivery elements in battalion units permits this overlap. 25X1 15 Top Secret Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 operational procedures. After a successful completion of certification training, the regiment enters combat alert duty. after the integration process is complete. a regiment receives certification by the SRF following delivery to a base. This is usually accomplished through the regiment's first field deployment, where the regiment is graded on its competence in training 25X1 25X1 16 Top Secret Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Q Next 1 Page(s) In Document Denied Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Top Secret 25X1 Table Deployment Milestones for the First 10 SS-25 Regiments Base Complete TEL, MSV, Integration Missile Complete Delivery Yoshkar Ola November 1984 January 1985 March 1985 April 1985 June 1985 Yur'ya 1 December 1984 May 1985 August 1985 June 1985 Yur'ya 3 September 1985 October 19 85 February 1986 November 1 985 Verkhnyaya October 1985 November 1 985 December 1985 Salda 5 Verkhnyaya November 1985 November 1 985 January 1986 Salda 2 December 1 985 Yur'ya 5 October 1985 November 1 985 January 1986 Yur'ya 2 October 1985 November 1 985 June 1986 December 1 985 Yur'ya 4 November 1985 November 1 985 May 1986 December 1 985 Verkhnyaya October 1986 December 1 986 March 1987 Salda 1 January 19 87 Verkhnyaya November 1986 June 1987 September 1987 Salda 3 July 1987 Declassified in Part - Sanitized Copy Approved for Release 2012/07/18: CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9 Declassified in Part -Sanitized Copy Approved for Release 2012/07/18 :CIA-RDP91T01115R000400650002-9