FY-75 KEP
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP91M00696R000500080006-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 15, 2016
Document Release Date:
February 17, 2004
Sequence Number:
6
Case Number:
Publication Date:
March 12, 1975
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 69.19 KB |
Body:
Approved For Rease 2004/05/13 : CIA-RDP91 M00696RIM0500080006-8
DCI/IC 1572-75
12 MAR 1975
MEMORANDUM FOR: D/DCI/NIO
D/DCI/IC
SUBJECT FY-75 KEP
1. At a meeting on 26 February, we reached substantial
agreement concerning the need for a KEP in some form and:
? on the desirability of a uniform approach
in the performance reports produced by
individual NIOs. To that end, we have
adopted a lexicon of terms regarding
degree of fulfillment to facilitate
aggregating.
? that there were no problems with part 3
of Section A or with Sections B and C of
the proposed performance instructions.
2. Following the meeting, NIO views were obtained on
how to prepare parts 1 and 2 of Section A. A redraft of
the proposed cover memo and a proposed standard outline for
NIO narrative evaluations were presented for ICS consideration.
3. As a result, most of the differences on how to
approach the performance assessments have been resolved.
Three problems remain:
? Should each specific collection/production
task/objective enumerated under some of
the KIQs in the Strategy Reports be addressed
specifically or should the evaluation be
done on an exception basis?
? How should consumer satisfaction be treated?
? Should performance evaluations be "put together"
with costing data, and by whom?
The nature of the views on these three points are set forth
in Attachment A.
Approved For Release 2004/05/13 : CIA-RDP91 M00696R000500080006-8
25X1 Approved For Release 2004/05/13 : CIA-RDP91 M00696R000500080006-8
Next 1 Page(s) In Document Exempt
Approved For Release 2004/05/13 : CIA-RDP91 M00696R000500080006-8
Approved For Re"lease 2004/05/13 : CIA-RDP91 M00696'1000500080006-8
4. We feel we have come a long way in removing semantic
problems and ironing out a variety of procedural differences.
The three problems noted above probably ought to be resolved
by the DCI. We recommend, therefore, that the proposed
instructions (Attachment B) be discussed at an early meeting
with him in order to launch the FY-75 KEP with as little
further delay as possible.
C/MPRRD/IC
Narionai n e igence urticer
for Economics
Attachments
As stated
25X1
25X1
Approved For Release 2004/05/13 : CIA-RDP91 M00696R000500080006-8
Approved For Release 2004/05/13 : CIA-RDP91 M00696R000500080006-8
Next 9 Page(s) In Document Exempt
Approved For Release 2004/05/13 : CIA-RDP91 M00696R000500080006-8