MINUTES OF THE 29 JUNE 1988 HCS TECHNICAL EXCHANGE MEETING
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP91-01355R000300100003-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
21
Document Creation Date:
December 23, 2016
Document Release Date:
July 8, 2013
Sequence Number:
3
Case Number:
Publication Date:
July 12, 1988
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP91-01355R000300100003-3.pdf | 357.95 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
1..7e7:1
FBIS-2429/88T
1 & JUL 1988
MEMORANDUM FOR: Distribution
FROM: ComMunications Segment Manager, ADD
SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange
Meeting
1. Representatives of FBIS/ESG, OIT/CED, CONTEL, and Lockheed
Electronics (LEC) met in the ESG conference room at 1330 hours on
Wednesday, 29 June 1988. The agenda is provided in Attachment A.
The list of attendees is provided in Attachment B.
2. New Connectivity Requirements - Five telephone changes were
requested by FBIS.
Remove call waI
t na frnm nnn r cure extension
has telephone Many callers in Maryland
ai to use the area code and are routed to this extension, with
a rate as high as 1 each minute. (Note: CONTEL made this
change effective 6 July 1988.)
b. Four additional secure telephones in the User Support
Branch need to support Classified AFS terminals. (Note:
Detailed requirements for these secure lines are being drafted
in memorandum FBIS-2430/88, which is to be submitted to OIT.)
3. Schedules
a. Delivery of LEC reported that the four
terminal server cabinets with wiring harnesses are ready for
delivery to FBIS. Access holes have been punched to permit
running communication cables between the cabinets. It does not
appear that anti-chafing material is required in the holes for
protection of the cables. One hole remains to be punched in the
cabinet side adjacent to the Flex IM. It was agreed to proceed
shipping the cabinets to FBIS during the following week.
(Note: the cabinets arrived at FBIS on 6 July 1988.)
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
STAT
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
F8I5-2429/88
SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting
b. Installation - The Flex IM is positioned in the Data
Center and the fiber optic cable has been installed. The secure
circuits in the Data Center are to be rerouted through the
Flex IM by the end of July 1988. The STE to ITE conversions are
in progress and should be completed by 18 July 1988.
c. Testing
1) has provided the end-to-end circuit test
plan shown in Attachment C. That plan needs to be modified
to reflect the extensive capabilities of the terminal server
in supporting such tests.
2) OIT plans to begin tests after the STE to ITE
conversions are completed. is available for
those tests but does not have the required security
clearances for working with equipment attached to the
secure PBX. As a precaution, he is documenting a test
procedure for CONTEL personnel which makes use of the
terminal server (Action Item HCS-081).
d. Sealing Data Center
1) The non-secure telephone circuits in the Data Center
are expected to be run through fiber optic isolators by the
end of July 1988. It is expected that each circuit
conversion takes no more than thirty minutes to complete.
2) has prepared a letter requesting isolation
of the MINWK and Wang ICT circuits. The letter needs
approval by the respective contracting officers before
CONTEL can accept the task. It is expected that each
circuit conversion may take several hours to complete.
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
STAT
STAT
STAT
iv
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
F5I5-2429/88
SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting
4. Security Concerns
a. The present configuration of the terminal server ports
is set up as:
Configuration
Dial-up Ports
Nailed Terminal Ports
Nailed Printer Ports
See
Qty Attachment
17 D
377 E
54 F
Total Ports
448
b. Requirements call for twenty one dial-up terminals to
access AFS. This means that there are four more dial-up
terminals than available dial-up terminal server ports.
a) Reduce the number of dial-up circuits to match
the available number of dial-up ports.
-3-
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
73
FBIS-2429/88
SUBJECT: Minutes of the 29 June 1988 RCS Technical Exchange Meeting
b) Reduce the number of nailed circuits attached to
the terminal server, freeing up ports to be reconfigured
for supporting dial-up terminals. In this case, the
nailed circuits remain in place but cannot be used until
the number of terminal server ports is expanded to
accommodate them. FBIS needs to determine which
circuits can be disconnected. (Note: the only reason
for dial-up AFS circuits is to permit sharing of
telephone lines with VM terminals.)
5. Port Distribution - Detailed informat4on reardin terminal
server port distribution has been provided to DC/AFSB.
Some of the information needs to be updated but no significant
problems are evident at this time.
6. Action Item Review - The status of the action items reviewed
in the meeting are listed as Attachment G.
7. Future HCS Communications Technical Exchange Meetings may
not be required. It is expected that present outstanding issues can
be addressed outside the TEM environment.
Attachments
-4-
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
STAT
STAT
3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
FBIS-2429/88
SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting
DS&T/FBIS/ESG/ADD/SES
Distribution:
Original C/ESG
DC/ESG
SA/ESG
C/HED
DC/HED
C/EB
C/AFSB
nr/APRR
1 -
1 -
1 -
1 -
1 - GE/SES Chrono
1 - FBIS Registry
C/ADD
DC/ADD
-5-
05JUL88)
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
FBIS-2429/88
Attachment A
CONTEL/FBIS/LEC/OIT TEM Agenda
29 June 1988
1330 Hours
New Connectivity Requirements
Schedules
- Delivery
- Installation
- Testing
- Sealing Data Center
Security Concerns
Port Distribution
Action Items
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
FBIS-2429/88
Attachment C
Page 1 of 8
June 28, 1988
DATA TESTING
?
Test Configurations:
(reference drawing #1)
1. Nailed 3 wire ckts
2. Dial-up 3 wire ckts
3. Nailed 5 wire modem control ckts
Test Equipment Recommended:
1. 2/Async terminals (RS-232 Interface) (GTE)
Type 1 2. 2/Source for Transmitting Data (1 CFE and 1 GEE)
Type 2 3. 2/Source for Transmitting Data (capable of operating
in modem control). (To be used in alternate modem control
testing, if supplied by the customer.)
4. 1/Test printer (capable of operating in modem control).
(To be used in alternate modem control testing, if
supplied by the customer.)
Type 1 5. 2/RS-232 cables (straight through, supporting pins
2, 3 and 7).
Type 2 6. 2/RS-232 cables (straight through, supporting pins 2, 3,
6, 7 and 20).
NOTE: The data communication parameters will be the same for all tests:
9.6K Baud
8 Bit Word
No Parity
1 stop Bit
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Data Testing
June 28, 1988
Page Two
FBIS-2429/88
Attachment C
Page 2 of 8
1. Nailed 3 Wire Ckts
(reference drawing #2)
Verification of end-to-end data transfer can be accomplished
by:
A. Station Equipment
1. Connecting a Type 1 RS-232 cable to the A0I-100 or DOB-1
being tested.
2. Connecting an async terminal to the other end of the cable
installed in step 1 (above)..
B. Switch Equipment
1. Connecting a Type 1 RS-232 cable to the ADI-101 being tested.
2. Connecting a Type 1 data source to the other end of the cable
installed in step 1 (above).
Upon completion of steps A and B (above) verify data transfer
by:
Transmitting data (the Quick Brown Fox message) from the switch
equipment data source, and receiving the transmitted data at the
station equipment terminal.
Disconnect the Async terminal from the station equipment RS-232
cable, and connect the Type 1 data source to the RS-232 cable.
Disconnect the Type 1 data source from the switch equipment
RS-232 cable, and connect the Async terminal to the RS-232
cable.
Transmit data (the Quick Brown Fox message) from the station
equipment data source, and receiving the transmitted data at
the switch equipment terminal.
Repeat these procedures for each applicable station equipment
locations and the associated switch equipment locations.
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
? Data Testing
June 28, 1988
Page 2hree FBIS-2429/88
Attachment C
2. Dial-up 3 wire ckts Page 3 of 8
(reference drawing #2)
Verification of end-to-end data transfer can be accomplished
by:
A. Station Equipment
1. Connecting a Type 1 RS-232 cable to the AD/-100 or DOB-1 being
tested.
2. Connecting a Async terminal to the other end of the cable
installed in step 1 (above).
B. Switch Equipment
1. Connecting a Type 1 RS-232 cable to the 11DI-101 being tested.
2. Connecting a Type 1 data source to the other end of the
cable installed in step 1 (above).
Upon completion of steps A and B (above) verify data transfer
by:
Going off-hook on the ITE 12 Plus or ITE 128, dialing the
appropriate directory number, hearing the carrier tone (the
data lamp will be flashing).
Push the data button to make connection (the data lamp will be
solid), and going on-hook. (The data lamp will remain solidly
lit.)
Transmitting data (the Quick Brown Fox message) from the
switch equipment data source, and receiving the transmitted
data at the station equipment terminal.
Disconnect the Async terminal from the station equipment
RS-232 cable, and connect the Type 1 data source to the RS-232
cable.
Disconnect the Type 1 data source from the switch equipment
RS-232 cable, and connect the Async terminal to the RS-232
cable.
Transmit data (the Quick Brown Fox message) from the station
equipment data source, and-verify receiving the transmitted
data at the switch equipment terminal.
(When data transfer has been verified, push the data button to
disconnect the data path, the data lamp will be extinguished.)
Repeat these procedures for each applicable switch equipment
location. (ADI-101 in the dial-up group), also, perform this
test from each applicable station equipment location (only 1
switch equipment location. ADI-101, need be tested from the
remaining station equipment locations.)
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
? maLa sescsng
June 28, 1988
Page Four FBIS-2429/88
Attachment C
Page 4 of 8
3. Nailed 5 wire modem control ckts
(reference drawing #3)
Verification of end-to-end data transfer can be accomplished by:
A. Station Equipment
1. Connecting a Type 2 RS-232 cable to ADI-100 or DOB-1 being
tested.
2. Connecting a RS-232 break-out box, DCE adaptor, to the other end
of the cable installed in step 1 (above).
3. Connecting an Async terminal to the DTE adaptor end of the
breakout box installed in step 2 (above).
B. $witch Equipment
1. Connecting a Type 2 RS-232 cable to the ADI-101 being tested.
2. Connecting a RS-232 breakout box, DCE adaptor, to the other end
of the cable installed in step 1 (above).
3. Connecting a Type 1 data source to the DTE adaptor end of the
RS-232 breakout box installed in step 2 (above).
Upon completion of steps A and B (above), verify data transfer
by:
Transmitting data (the Quick Brown Fox message) from the switch
equipment data source, and receiving the transmitted data at the
station equipment terminal.
Verify modem control leads by:
insterting positive voltage on Pin 20 at the switch equipment
breakout box, and seeing pin 6 become active at the station
equipment breakout box.
(repeat the above step from the station equipment breakout box
to the switch equipment breakout box.)
Disconnect the Async terminal from the station equipment RS-232
cable, and connect the Type 1 data source to the RS-232 cable.
Disconnect the Type 1 data source from the switch equipment
RS-232 cable, and connect the Async terminal to the RS-232 cable.
Transmit data (the Quick Brown Fox message) from the station
equipment data source, and verify receiving the transmitted data
at the switch equipment terminal.
Repeat these procedures for each applicable station location,
and the associated switch equipment location.
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08 : CIA-RDP91-01355R000300100003-3
Data Testing
June 28, 1988
Page Five
362C
FBIS-2429/88
Attachment C
Page 5 of 8
An alternate modem control ckt test can be performed, if a Type
2 data sburce is provided and an item #4 test printer is
provided.
Verify Modem control by:
Transmitting data from the switch equipment Type 2 data source
to the test printer, verify that data transfers.
Repeat these procedures for each applicable station equipment
location and associated switch equipment locations.
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
DTE
STATION VIRE
AFS DATA END-TO-END TESTING
ADI-100
ITE 12+
OR
ITE 12B
EX SAE
FIBER LINK
FLEX It-1
ADI-101
CABINET
DRAWING if 1
FS-23Z
TERMINAL
SERVER
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
OTE
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
RS-232
PN 2
1113
IN 7
STATION WIRE
ADI-100
3 WIRE DIAL-UP 84 NAILED cKTs
ITE 12+
OR
fTE 128
IBX S/80
FIBER LINK
FLEX II1
ADI-101
CABINET
DRAWING #2
PIN?
PIN 3
PIN 2
TERMINAL
SERVER
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
RS-232
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
RS-232 STATION WIRE
P
TERm
Pin 7
AD1-100
Plat_
P I
AFS MODEM CONTROL CKTS
ITE 12+
OR
1TE 12B
IBX siso
FIBER LINK
FLEX IM
ADI-101
CABINET
TERMINAL
SERVER
DRAWING 43
BIN 2EL_
PIN 7
PIN 6
PIN 3
PIN 2
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
PS-23a
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
TERMINAL
3 WIRE DIAL-UP CKTS
PIN 2 (TX)
PIN 3 (RX)
PIN 7 (SG)
IBX S/80
PIN 2 (TX)
PIN 3 (RX)
*414\ PIN 7 (SG)
SEE NOTE:
TERMINAL
SERVER
NOTE:
REPRESENTS THE CONNECTION POINT
WHERE A DIAL-UP DATA CALL IS CONNECTED
OR DISCONNECTED
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
eclassified in Part - Sanitized Copy Approved for Release 2013/07/08 CIA-RDP91-01355R000300100003-3
3 WIRE NAILED CKTS
PIN 2 (TX)
0
0 IBX 5/80
0
;
PIN 2 (TX)
9 1.1
el to
rt H
TERMINAL
TERMINAL
SERVER
PIN 3 (RX)
;
PIN 3 (RX)
PIN 7 (SG)
?
PIN 7 .(SG)
?
?
?
?
poianse 2013/07/08 : CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
TERMINAL
MODEM CONTROL NAILED CKTS
?
PIN 2 (TX)
PIN 3 (RX)
PIN 6 DSR
PIN 20 DTR
PIN 7 (SG)
IBX S/80
PIN 2 (TX)
PIN 3 (RX)
PIN 6 DSR
PIN 20 DTR
PIN 7 (SG)
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
TERMINAL
SERVER
stl
rt
rt fri
lb EA
C)
5
CD N.)
PO
0 C.
rt
CO
tri CO
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Action Item Status Report
FBIS-2429/88
Attachment G
Page 1
ACTION ORIGIN ACTION ITEM/ACTIONEE/DUE DATE STATUS
ITEM # and DATE DATE COMPLETED
HCS-056 TEM Forward preliminary LEC delivery COMPLETE 4/27/88
3/31/88 schedule to CONTEL through COTR.
HCS-057
TEM
3/31/88
4/15/88
for data
6/29/88
COMPLETE 6/29/88
Testing to start in 3rd
week of July.
STAT
STAT
Develop test schedule
circuits
HCS-058
TEM
Forward full-scale drawing
of
COMPLETE
4/27/88
3/31/88
DECserver rack, cabinet,
mtg to CONTEL
and ADI
4/15/88
STAT
HCS-059
TEM
3/31/88
Identify ADI ports which
support APS printers.
are to
COMPLETE
4/27/88
4/27/88
STAT
HCS-060
TEM
Forward ADI chassis to
LEC.
COMPLETE
5/11/88
1 3/31/88 LEC received hardware
5/11/88.
HCS-061 TEM
3/31/88
HCS-062 TEM
3/31/88
5/11/88
Investigate whether special
security arrangements are needed
for Flex IM or attached circuits.
OPEN
Awaiting Security
response to letter from
OIT.
Determine if there is sufficient COMPLETE 4/27/88
room for overhead trough above 25 pair cables will be
ADI cabinets, run underfloor.
4/27/88
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08 : CIA-RDP91-01355R000300100003-3
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
FBIS-2429/88
Attachment G
Page 2
Action Item Status Report
ACTION ORIGIN ACTION ITEM/ACTIONEE/DUE DATE
ITEM # and DATE
HCS-063 TEM
3/31/88
Contact at HOs
regarding Wang circuits through
shielded enclosure
STATUS
DATE COMPLETED
COMPLETE 4/27/88
Deferred to HCS-066.
4/27/88
HCS-064
TEM Investigate whether ITEs
can be
COMPLETE 5/09/88
3/31/88
wall-mounted in the Data
Center.
Wall mounting brackets
have been ordered.
5/18/88
HCS-069
TEM
Identify requirements
for ADI
COMPLETE 5/18/88
4/27/88 101s to LEC and CONTEL.
Cabinets will support 448
active ADIs, 12 spares.
HCS-070 TEM
5/18/88
Obtain two terminals for CONTEL
4/27/88 tests of data circuits.
HCS-073 TEM
_ 5/19/88
7/15/88
Review AFS circuit testing plans
with Office of Security
OPEN
Terminals will need to
meet Reston zoning
requirements.
COMPLETE 6/29/88
STAT
STAT
STAT
STAT
STAT
6/29/88
STAT
HCS-074
TEM
5/19/88
Address AFS terminal server
distributions.
port
OPEN
CONTEL has provided
circuit configuration to
APSE. Being reviewed.
7/05/88
STAT
HCS-080
TEM
Estimate cost for programming
PBX
OPEN
6/29/88
to give each dial-up user a
unique T/S port.
This is needed to prevent
security problems caused
by interrupted sessions.
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3
FBIS-2429/88
Action Item Status Report Attachment G
Page 3
ACTION ORIGIN ACTION ITEM/ACTIONEE/DUE DATE STATUS
ITEM # and DATE DATE COMPLETED
HCS-081 TEM
6/29/88
Document procedure for testing OPEN
Cleared personnel needed
for hands-on testing.
circuits with DEC Server.
7/18/88
HCS-082 TEM Revise connectivity needs so that OPEN
6/29/88 each dial-up user has a unique This is in support of
T/S port. Action Item HCS-080.
if
7/18/88
IDeclassified in Part - Sanitized Copy Approved for Release 2013/07/08 CIA-RDP91-01355R000300100003-3
STAT
STAT