UNFUNDED REQUEST - ORIGINAL HEADQUARTERS BUILDING UTILITY UPGRADE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP91-00058R000100090015-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 23, 2016
Document Release Date: 
August 27, 2012
Sequence Number: 
15
Case Number: 
Publication Date: 
July 17, 1987
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP91-00058R000100090015-5.pdf118.45 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 STAT ROUTING AND TRANSMITTAL SUP TUt (Nam., oMlco symbol, room number, AgsncylPoat) 146ft sto 2. UA S. 4. L Action Flit No* AgxovW For Clearance Per Co.su iua: ,.;: ; ; . As PagLiested CMcu1Ma For Correction For Your Information plipwo Ss. M-~. `: ? ? : _, >..'; /^ w mmsnt I 6 3`y OPTIONAL FORM 41(Rw. 7-79) PPMMR 4 Cfl)101-11.200 I Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 0 ? L. n Z 1 dry en e zz 17 JUL 1987 MEMORANDUM FOR: Deputy Director for Administration FROM: John M. Ray Director of Logistics SUBJECT: Unfunded Request - Original Headquarters Building Utility Upgrade his memorandum requests an unfunded allocation of 25X1 for use in the Original Headquarters Building (OHB) in 25X1 order to upgrade electrical capacity i the grounding system for the building, and the medium voltage distribution system. The design and construction of an upgraded vault is an immediate necessity in order to correct the current situation and to prepare for the Off e of Imagery Analysis (OIA) 25X1 backfill move. The load is near capacity now, and we will be forced to redirect energy from other vaults to support electrical requirements in the Northwest quadrant of the building when OIA moves. The introduction of PC systems throughout the OHB has exacerbated this problem. Construction must commence in the near term to meet the projected move-in schedule for both OIA and other components requiring increased power. Current projections indicate sporadic overloads in 1988 and, with the move-in of OIA, a more critical overload 25X1 situation in early 1989 if F__-1capacity is not increased. 2. The cost of replacing the PCB transformers in the OHB was not included in the backfill funding profile because GSA had volunteered to fund the project. GSA has now informed us that they cannot begin the replacement in FY 88 as planned, due to insufficient funding for that year. However, Facilities Management Division/OL, must have OIA operational by 1 March 1989. OIA is a large power consumer and will be drawing from a transformer vault that cannot supply the additional load. The 25X1 construction costs are presently estimated to be for upgrade. 25X1 25X1 3. Thel upgrade provides an additional economic opportunity to improve the entire OHB grounding system and also to upgrade the medium voltage distribution system. The cost estimate for a study and full design contract, is Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 5 L L x 1: 1? SUBJECT: Unfunded Request - Original Headquarters Building Utility Upgrade 25X1 25X1 sed on the above justification, it is requested that e provided for these unfunded projects. V ohn M. Ray U Deputy Director for Administration Date Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5 S E C R E T SUBJECT: Unfunded Request - Original Headquarters Building Utility Upgrade 25X1 OL/FM 1 J (17July87) 25X1 Retype d:mg~ uly87) Distribution: Orig - Addressee - (Return to OL-FMD Official) 2 - DDA 1 - OL Files 1 - OL/B&F 1 - FMD Chrono Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP91-00058R000100090015-5