LOC'S PROPOSED SUBMISSION FOR DCI'S ANNUAL REPORT TO CONGRESS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90-00379R000100320011-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
7
Document Creation Date: 
December 27, 2016
Document Release Date: 
August 27, 2012
Sequence Number: 
11
Case Number: 
Publication Date: 
January 7, 1987
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP90-00379R000100320011-8.pdf1.65 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 ROUTING AND RECORD SHEET SUBJECT: (Opdanal) Proposed Submission for DCI's Annual Report to Congress FROM: 1 EXTENSION NO. DATE 7 January 1987 TO: (OffIcor designation, room number, and building) DATE OFFICER'S INITIALS COMMENTS (Number each comment to show from whom to whom. Draw a line across column after each comment.) RECEIVED FORWARDED L C/SD/OL Tony, Per your request, attached are bullets for possible inclusion in the DCI Annual Report to Congress. We have attached two graphics for consideration. _ L. 3. C/ IMSS/OL 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. FORM 61Cl MONS GPO 1-79 GPO : 1983 0 - 411-632 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 STAT STAT STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 R Next 2 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 25X1 25X1 25X1 G.J/V I Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 CONFIDENTIAL You Want What? Shipped Where? By When? CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 410 Project ? 21 March 1986 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 CONFIDENTIAL CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 CONFIDENTIAL After some deliberation, agreement was reached to lease the facility by the Office of Logistics over a multi-year timeframe. PIPE funds were utilized for the lease as well as a goodly portion of the fit-up costs by OS in conjunction with their program. The leased facility will be referred to hereafter as Building E, but more specifically the three buildings will be referred to as Buildings El, E2, E3. Construction of the Building E leased facility will be accomplished in three phases as follows: Building E In September 1986 the "cold shell" for Building El was completed. A "cold shell" is referred to as a warehouse storage type facility with minimum heating, lighting, and plumbing. A contract awarded for Fit up" costs to include offices, testing laboratories, air conditioning and the like. Structural and electric work began in October and plumbing and mechanical work should begin in late November. Beneficial occupancy of the building' by OS is anticipated in March 1987. Building consisting of two levels ol 25X1 25X1 ft. each level 25X1 Construction of the "cold shell" should begin in December 1986 with a target date of June 1987 as a beneficial occupancy date. However, if offices, laboratories and environmental requirements are needed for tenant organizations, construction in these areas would commence sometime in Spring 1987 in concert with completion of the "cold shell" with a beneficial occupancy date for the completed facil- ity estimated in September 1987. Identification of tenant organizations are being finalized. Building E3 q. ft. In late November 1986 the contractor will begin setting steel for this building which will be, once again, completed as a "cold shell." Present planning estimates that the building should be "under roof" by late January 1987. The "cold shell" portion of the building should be completed by 1 March 1987. Depending upon the tenant organization going into this particular facility, the beneficial occupancy date should be September 1987. CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8 book, cy 716, of "U.S. Foreign Intelligence Requirements Categories and Priorities," prepared for the DCI by the Intelligence Community Staff, and dated 2 Oct 85, seen by EO, DD/L, D/L, and C/IMSS and sent to Registry for filing, 11/15/85. Declassified in Part - Sanitized Copy Approved for Release 2012/08/27: CIA-RDP90-00379R000100320011-8