BREAKFAST BULLETS FOR THE WEEK OF 29 AUGUST 1988
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP90-00078R000100050026-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
24
Document Creation Date:
December 27, 2016
Document Release Date:
January 30, 2013
Sequence Number:
26
Case Number:
Publication Date:
August 29, 1988
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP90-00078R000100050026-6.pdf | 910.52 KB |
Body:
25Y1 ..
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30 : CIA-RDP90-00078R000100050026-6 i1
A
29 August 1988
NOTE FOR: Deputy Director for Administration
FROM: John M. Ray
Director of Logistics
SUBJECT: Breakfast Bullets for the Week of 29 August 1988
Following are some OL activities which you may wish to include in your
discussions with the DCI on Tuesday morning:
25X1
New Headquarters Building: Over the weekend (26 and 27 August), OL moved
the Office of Near Eastern and South Asian Analysis/DI (NESA to their new
location on the 6th floor of the New Headquarters Building.
Boiler Malfunction: At approximately 0815 hours on 29 August, a
malfunction in the ignition process caused an explosion within boiler
number 3 at the Central Plant while it was being put on line. A visual
inspection of the exterior reveals that the steel wall of the boiler has
buckled in a few places. An examination of the interior of the boiler
will be done when it cools down, probably late 30 August. No one was
? Auto Accident: At approximately 1130 on 29 August, a Mail and Courier
vehicle a was returning to Headquarters from Rosslyn via the G.W. Parkway.
Due to heavy rain and water accumulation on the highway, the engine
stalled. A Volkswagon was unable to stop which caused a rear-end
collision. There were no personal injuries; it appears both vehicles were
totalled. No one was charged due to the inclement weather.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Next 2 Page(s) In Document Denied
Iq
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25x1, 1i
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
24 August 1988
MEMORANDUM FOR: Deputy Director for Administration
FROM: John M. Ray
Director of Logistics
SUBJECT: Report of Significant Logistics Activities for
25X1 the Period Ending 23 August 1988
1. Events of Major Interest That Have Occurred During the
Preceding Week:
e. On 17 August, Shaw University of Raleigh, North Carolina, picked
25X1 up 103 pieces of excess furniture, valued at $7,400,
25X1 This was the fifth o ion of Agency excess materiel made
to Vistorically Black Universities.
25X1
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
25X1
g. On 17 August 1988 on behalf of the Office of Information
Resources, the Printing and Photography Group, OL (P&PG/OL), made arrangements
for a commercial vendor to transfer a 35mm black and white movie film onto a
videocassette.
j. On 22 Au ust the Real Estate and Construction Division, OL
25X1 (RECD/OL), and lessor executed a lease agreement for 18,400
square feet of space on the 1st floor of the building. The Office of
Personnel will have 6,600 square feet and the Office of Security 11,800 square
feet of space. The lease is for 5 years with an annual rental rate of
$357,000 for the first year. RECD is continuing to negotiate for an
25X1 additional 7,700 square feet of space on the 2nd floor also for the
Offices of Personnel and Security. In an effort to meet Agency parkin
25X1 requirements, the lessor agreed to lease additional parking s aces
25X1
* k. OL reports that Mr. Lawrence Ludtke, sculptor of the Donovan
statue, will travel to New York on 6 September to inspect the final casting of
the bronze figure and make shipping arrangements. Upon arrival, the statue
will be placed on an incised marble base in the main lobby of the Original
25X1 Headquarters Building.
* 1. On 25 August, OL reports that the bas-relief of Mr. Casey will be
mounted in the entrance lobby, 4th floor of the New Headquarters
25X1 Building.
m. On 16 and 17 August, the Facilities Management Division, OL,
conducted a traffic flow count on the Headquarters Compound. The survey
indicated that ridership per vehicle remains at 1.2. The vehicular usage
during the morning rush hour is greater by 100 vehicles at the Route 193
entrance than at the G.W. Parkway Entrance. The Route 123 entrance showed a
decrease of approximately 80, vehicles during the morning rush as compared to
25X1 the March survey
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
are .. .-,
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
n. On 23 August, approximately 600 employees attended the Federal
Women's Symposium, "Looking Ahead: New Rules-New Roles." The Facilities
Management Division, OL, Kane Movers and Allied personnel supported this
symposium by er in the quadrangle and providing food service from
the cafeteria.
* o. OL reports that on 18 August, a representative from the National
Capital Planning Commission visited the proposed site for the Child Day Care
Center (CDCC). He was impressed with the natural, open environment for the
CDCC and that the trees will shield it from view on all sides. His opinion
was that we have one of the best sites he has evaluated, and is optimistic
that our plans will be approved. The formal presentation of our plans to the
25X1 Commission is scheduled for 6 September.
25X1
25X1
p. With the dismantling of the pneumatic tube system, the Mail and
Courier Branch, OL, will provide dedicated courier service between the DO
Information Service Centers and the Office of Information Technology
Communications Center, specifically for the timely distribution of cable
traffic. This service will only continue until the delivery process is
automated, sometime in the near future.
r. OL has prepared a letter to the Virginia Department of
Transportation (VDOT) requesting permission to locate the new fence around
Scattergood-Thorne on their property in order not to disturb the surrounding
trees. This location had previously been approved by the Virginia Power
Company and it is anticipated that VDOT will also approve this request. OL is
also attempting to identify a local Architect/Engineering firm which
specializes in the rehabilitation of historic buildings so that interior
design work may start on, the Manor House. Additionally, construction on the
jogging track fence is nearing completion. The contractor building the new
house adjacent to the Agency's property has been asked to move his trash
dumpsters and vehicles off government property as they are obstructing fence
25X1 construction.
2. Significant Events Anticipated During the Coming Week:
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
s~ r r
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
25X1
b. On 26 and 27 August, OL will move the Office of Near Eastern and
South Asian Analysis, DI (NESA/DI), to their new location on the 6th floor of
the New Headquarters Building. During this reporting period, the Building
Services Branch, OL, is completing final preparations (inst~ conserva-
files, workstation accessories, etc) in the NESA area.
F y
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
cuAr I IIN 1 1fkL
OL/FMD WEEKLY REPORT
25X1
1. Progress Reports on Tasks Assigned by or of Interest to
Senior Management:
a. Lawrence Ludtke, sculptor of the Donovan statue,
reports that the Tallix Foundry in Beacon, New York, has finished
casting of the bronze figure. He will travel from Texas to inspect
it on 6 September, and will be able to arrange shipping within
2 weeks of that date. Upon arrival, the statue will be placed on
an incised marble base in the Original Headquarters Building main
lobby.
~-.. .hey of Mr. Casey will be mounted in the New
Headouarters Bu;"1,4,-- ( 7 B) west entrance lobby on 25 August.
2. Major Events that Have Occurred During the Preceding Week:
a. Status of Chilled South Side Chilled Water Lines: A
formal architecture-engineer selection panel will be convened to
rank five firms who have been identified as having significant
expertise in mechanical systems. The firm selected will be asked,
to develop options and recommendations regarding the replacement of
the existing south side chilled water line.
The Route 123 entrance showed a decrease of approximately 80
b. Parking and Traffic Management:
(1) On 16 and 17 August, the FMD/OL,
conducted a traffic flow count at the Headquarters Compound. The
survey indicated that ridership per vehicle remains at 1.2. The
vehicular usage was greater at the Route 193 entrance than at the
G. W. Parkway Entrance by 100 vehicles during the a.m. rush hour.
Expansion on the Headquarters Compound. The IFB was provided to~
g fV
V G 1111.1Ga UUL 111 g/ 1.111 a JU. IIIG it lil 1 VLL
(2) On 18 August, the Contracts Staff, FMD/OL,
issued Invitation for Bid (IFB) for the West "A" Parkin Lot
six potential bidders, and requires that bids be submitted by
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP9O-00078ROO0100050026-6
LuririDLVIIAL
c. Backfill Project:
design-of the A-vault and B-vault primary electrical distribution
systems. The contractor proposed a total amount of $424,369 for
the 2 design packages. The negotiated price for the 2 projects is
$360,000. The design packages are being acquired in support of the
(1) On 17 August, the Contracts Staff, FMD/OL,
completed negotiations with RTKL Associates to acquire Design
Packages 16 and 17. The design packages include the survey and
Backfill Program to renovate the Original Headquarters Building.
access flooring in support of the Headquarters Backfill Program.
The resulting contract will be a six year requirements type
contract. The RFP was provided to four potential bidders with
(2) On 19 August, the Contracts Staff, FMD/OL,
issued Request for Proposal (RFP) No. 88-Z32 to acquire raised
over the six years is $7 million.
proposals due by 7 September. The estimated value of the flooring
On 23 August,
25X1
25X1
W 1 1 1 UU 111 C l 11Ci LUI C11 VFV11 V V I L VILV I L U I V IL C111U L11CiL LLccJ W111 J111ri1U 1L
from view on all sides. His opinion was that we have one of the
best sites which he has evaluated, and is optimistic that our plans
wi11 be approved. , -se -ted
t.o--t-h _liC-P- --s a-f-f---and-- om-6 e-p tTn b-e -h e-st-a+f --w 1?9- m-k-e mh-e ao r m a 1
~"??W?r?l~
d-w
i
~h~
-
-s-
t--
te i-
~t
?tfi?e?~`C~ mm i~`s~i~~
~b-
-?-
on t ac t
~
-
pr
e
ea
a
c~n
~
:
.
e
e
~
,
25X1 r e?1-t?s- t . 1
n During the w
of 15 August, the FMD/OL, moveee202
Office of Scientific and Weapons Research (OSWR) personnel into the
New Headquarters Building. This completes the move of OSWR
25X1 / personnel a ~n o m~moa~ ~( 8 p~i=ec s )
wayd,A2..0-a e
25X1 ~ ra a tra ~~er 4wo=als -f xc-es `r to '1 "GSA-;-'
25X1
approximately 600 employees attended the Federal Women's Symposium,
"Looking Ahead: New Rules-New Roles." FMD, Kane Movers and Allied
personnel provided support which included the erection of tents in
the auad and food service from the cafeteria.
e. Scattergood-Thorne Property Renovation: Reroofing of
the main house and guest house continues and is scheduled for
completion circa 15 September. The project is 42 percent
f. A representative of the National Capital Planning
Ximmission (NUC) visited the proposed site of
complete.
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP9O-00078ROO0100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
LUN1'IULNIiAL
Building.
i. Significant Construction Projects: On 17 August, the
Contracts Staff, FMD/OL, issued two Invitations for Bids (IFB).
The IFB's were sent to five contractors, and each requires bids to
be submitted by 7 September. The two solicitations were:
(1) IFB to construct a new guard post at the DCI
Tunnel Entrance to the Original Headquarters Building. The work is
being accomplished for the Office of Security.
(2) IFB for renovations to the ground and first
floors of the Printing and Photography (P&P) Building. Also, on
26 August, a prebid meeting will be held for the renovation of the
P&P Building.
j. Significant Customer Service Efforts:
(1) The South dock of Headquarters Building is now
opening for business half an hour earlier than in the past., at 0530
hours during the week. It is also being opened for two hours on
Saturday and Sunday mornings to allow for direct receipt of the
newspapers at this loading dock. This expansion of hours is
resulting in earl' of daily newspapers
during the week. 'W 1111Glt
FMD 0 will
establish a dedicated courier run,_ Information
Management Staff/DO, for the delivery of routine cable traffic in
support of the Directorate of Operations. Incident to the riL...
dismantling of the tube system, the DO'requested to provide
special courier service to and from DO Information Service Centers
(ISCs) and the Office of Information Technology (OIT)
Communications Center,,snecifically for the distribution of cables
25X1
25X
25X
25X
h. Significant Meetings with Officers Outside OL: As a
part of the introductory briefings for Mr. Kevin Shiad, the new
Office of Management and Budget examiner for the Agency, the Deputy
Chief of FMD took Mr. Shiad on a tour of the New Headquarters
7;/~ /LI Ta ~i ,v /5
(3) M$CB commenced service to OIT Information
Services Center in the New Headquarters Building at 5 on
15 August. This ISC supports components of OSWR.
k. Operational support:
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
UUNr1JLN11AL
3. Upcoming Events:
a. During the week of 22 August, BSB will complete.final
-prparations (new executive furniture and workstation accessories
for the Office of Near Eastern and South Asian Analysis (NESA)/DI
move into the 6th floor of the New Headquarters Building and will
t move the 150 NESA personnel, 26 and 27 August. BSB will also be
no and st-orina fi
iture from the former OSWR-spaces.
25X1~`~ 7
b. On 26 August, FMD personnel will brief the DDA on
25X1 various projects.
75X1
25X1
4. Management Activities and Concerns:
The exodus of summer only employees has begun. During
this period nine summer only employees departed FMD. Also, the
following assignments/reassignments , occurred: from Operations/FMD
- to M$CB/FMD -
and to MPB/FMD
Chief
Facilities Management Division
4
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
C O N T 'l D E N '1' I A L
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
WEEKLY REPORT FOR AGENCY CONTRACTS GROUP
FOR PERIOD ENDING
23 AUGUST 1988
25X1
25X1
25X1
25X1
25X1
1. Progress Report of Tasks Assigned by the DCI/DDCI:
No tasks assigned during this reporting period.
2. Items or Events of Major Interest that have Occurred During
c. Agency Contracts Group, Office of Logistics, negotiated a
modification to a firm-fixed-price contract on behalf of the Office
of Training and Education with Garant and Associates. This agreement
provides for the presentation of the courses entitled "How to be an
Effective User", and "What do Programmers Do". at a cost of $19.439
with completion by 30 September 1988.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100050026-6
25X1
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
U U N r 1 ll t N 1 1 A L.
25, Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
25X1
1. Agency Contracts Group, Office of Logistics, received a FLASH
request from the Counterintelligence Center/Support Staff for the
procurement of a Piranha shredder to replace an inoperative unit in
the Office of the Counterintelligence Center. The ne
dshredde r-~~
elivered the same day for a dollar value of $2884.
p. On 15 August 1988, Agency Contracts Group, Office of
Logistics, completed negotiations with Hitt Contracting, Inc. on
several changes on four FY87 contracts. The contractor requested
$12,717 and offered a credit of $4,184 for work deleted by the
Government on one contract. The claims were settled by denying
$3,345, accepting $3,358, and agreeing on $6,014 for the credit.
These contracts can now be closed.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
C O N F I D E N T I A L
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP9O-00078ROO0100050026-6
q. On 15 August 1988, Agency Contracts Group, Office of
Logistics, issued four Invitation for Bids (IFB) for projects to be
accomplished in the New Headquarters Building. The IFB's were sent to
five Contractors, and each requires bids to be submitted by 31 August
1988. The four solicitations are:
-IFB 88-Z28 for Renovations to Rooms 4N25, 29 and 31.. The project
is being accomplished for the Office of Training and Education.
The estimated price range for the work is between $25,000 and
$100,000.
-IFB 88-Z29 for Renovations to Room GU1101. The project is being
accomplished for the Office of Information Technology. The
estimated price for the work is less than $25,000.
-IFB 88-Z30 for Renovations to Room 2W03. The project is being
accomplished for the Office of Information Technology. The
estimated price for the work is less than $25,000.
-IFB 88-Z31 for Renovations to Rooms 3Y36 and 3Y64. The project
is being accomplished for the Office of Information Technology.
The estimated price range for the work is between $25,000 and
25X1 $100,000.
r. On 16 August 1988, Agency Contracts Group, Office of
Logistics, held a pre-bid conference for Invitation for Bids 88-Z20-
Renovations to the GCO3/lDO4 areas in the Original Headquarters
Building. Representatives from four of the twelve companies solicited
participated on the meeting and the jobsite visit. This renovation
project is part of the Headquarters Backfill Program to renovate the
s. On 17 August 1988, Agency Contracts Group, Office of
Logistics, completed negotiations with RTKL Associates to acquire
Design Packages 16 and 17. The Design Packages include the survey
and design of the A-Vault and B-Vault Primary Electrical Distribution
Systems. The contractor proposed a total amount of $424,369 for the
two design packages. The negotiated price for the two projects is
$360,000. The design packages are being acquired in support of the
Original Headquarters Building.
Backfill Program to renovate the Original Headquarters Building.
3. Significant Events Anticipated During the Coming Week:
None
4. Management Activities and Concerns:
None
C O N F I D E N T I A L
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP9O-00078ROO0100050026-6
25X1
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Next 1 Page(s) In Document Denied
Iq
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
w" L U N r 1 JJ L N I 1 A L
PROCUREMENT MANAGEMENT STAFF, OL
WEEKLY REPORT
Week Ending 23 August 1988
25X1
25X1
25X1
25X1
25X1
1. Status of Tasks Assigned by Senior Management:
a. On August 22, 1988, Procurement Management Staff (PMS)
received a copy of Centel's comments dated August 19, 198'8 based on
the protest conference held at the General Accounting Office (GAO) on
August 10th. This Centel package contains further argumentation and
porting materials against the award to ITC.
The Agency's responses to the conference is in the final stages
of preparation and will be submitted to GAO as scheduled on
August 25.
b. On August 23, 1988 C/PMS conferred with) lof the
Office of Congressional Affairs (OCA) to review the status of PMS/OL
responses to legislative initiatives. Upon review, it was confirmed
that PMS was totally correct in all responses with no outstanding
items being due. OCA had earlier and erroneously reported two items
as pending. John clarified the situation by confirming that these
items had not yet been sent to PMS. He expressed his continuing
appreciation for PMS support.
2. Major Events That Have Occurred During the Preceding Week:
a.
reviewed 12 files and interviewed five applicants for the Computer
Staff Assistant vacancy in PMS per the request of Office of GVI
Logistics, Personnel and Training Staff (OL/P&TS). A consensus
selection matrix was prepared and submitted for appropriate
follow-on action
b. I (reported that Logistics Notice 7-4/FN
33-82 regarding the implementation of Office of Management and
Budget Circular A-125 Prompt Payment is in the process of being
jointly updated between OL and Office of Finance (OF) to reflect the
revised guidance contained in the Federal Acquisition Regulations
regarding Prompt Pay.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
- t, U IN r? .i L t IN 1 1 Ail
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
SUBJECT: OL/PMS Weekly Report for the Period Ending 23 August 1988
C.
activities.
will be set
months.
for use in the
The equipment
tin. tested and
reports that the hardware and software
prototype automaton of CORE Team's
will begin arriving in about 30 days, an'd.
evaluated over the subsequent three
d.l lalso reports that the FARA program from
Compusearch Corporation was ordered for contract generation on the
CORE Team prototype. Compusearch agreed to provide FARA free of
charge to OL/PMS for use in developing and tailoring better uses of
FARA by PMS and all contract teams.
e. A total of 377 contract actions and 238 amendment actions
were input into the CONIF database during this reporting period.
g. On August 23, C/PMS was dyised by the DCI Admin Office
Staff that the TDY assignment of7 should be extended if
possible to 7 October. After discussions with the Deputy Director
of OL concurrence was provided.
h.
at Headquarters on 23 August.
3. Upcoming Events:
attended the Federal Woman's Program
The quarterly newsletter is being prepared and will be ready for
release the week of 6 September.
4. Management Activities and Concerns:
OL/PMS will continue to keep management apprised of any
significant management activities and/or concerns as they arise.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
=a
INFORMATION AND MANAGEMENT SUPPORT STAFF
WEEKLY REPORT FOR PERIOD ENDING 23 AUGUST 1988
I. Progress Report on Tasks Assigned by the DCI/DDCI:
II. Items or Events of Major Interest that have Occurred During
the Preceding Week:
A. TECHNICAL GROUP:
3. FCS (Field Computer System) The Field Comnuter
System (FCS) team returned from ASCA I This
completes the final, scheduled installation. of the Field
25X1
25X1
25X1
25X1
Computer System. All system hardware and software was
successfully installed and tested. Upon return from temporary
duty (TDY) the FCS team received a cable from ASCA. The cable
commended the team for " ..working cooperatively and
diligently with our,1nrn1 staff, and it is to be commended for
a job well done.".
4, has been working on a pamphlet for
Technical Group. This pamphlet covers topics relating to
ADP. modified the pamphlet adding a glossary of
terms and urt er explained some of the software products
supported
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30 : CIA-RDP90-00078R000100050026-6
INFORMATION AND MANAGEMENT SUPPORT STAFF
WEEKLY REPORT FOR PERIOD ENDING 23 AUGUST 1988
25X1
25X1
1. IMSS traveled OHB and
NHB to Capture e logs officers and contracting officers on 35mm
film for use in future OL Quarterlies and various OL
publications.
Day, Saturday, 1 October 1988. A response to the DA
representatives from the D/L was prepared stating the support
2. In response to a memo from the Chief, DA Management
Staff, IMSS prepared a list of OL significant accomplishments 'on for in prepay u ming IC Staff/OMB 1990/91 Budget
Hearings.
3. IMSS coordinated with OL Groups, Divisions, and
Staffs relative to the extent of the OL contribution to Family
OL plans to provide for this Agencywide event.
C. CLAS:
On 23 August the Office of Information Technology made
the official delivery of the Inventory Control System (ICS)
conversion program. This program was developed to convert ICS
stock number and inventory data to the Cullinet Bill of
Material (BOM) part master file. The ICS-BOM interface
program was also delivered on 23 August. This program permits
the batch transfer of data between ICS and BOM. This software
delivery was scheduled for completion by 26 July and was more
than three weeks behind schedule, however, the Supply Team
members feel they will be able to accomplish the necessary
acceptance testing on schedule.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
" n " n r. V
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30 : CIA-RDP90-00078R000100050026-6
INFORMATION AND MANAGEMENT SUPPORT STAFF
WEEKLY REPORT FOR PERIOD ENDING 23 AUGUST 1988
3. Significant Events Anticipated During the Coming Week:
4. Perspective of Staff Activity:
3
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Next 1 Page(s) In Document Denied
Iq
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
STAT
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
PRINTING AND PHOTOGRAPHY GROUP
WEEKLY REPORT FOR PERIOD OF
16 August 1988 - 23 August 1988
I. Status of Tasks Assigned by Senior Management:
STAT
STAT
II. Items or Events of Major Interest that have Occurred
During the Preceding Week:
A. The Office of Logistics, Printing and Photography Group
(OL/P$PG) continues conversion of the PPG Management Information
System (MIS) Inventory Control Module for use with -the new Copier
Supply Program (CSP). This conversion will assist in the
implementation of an enhanced Agency Copier Management Program
(ACMP) including the establishment of a Copier Supply Program (CSP).
Once the conversion is completed, the MIS and ACMP databases will
accommodate bar code inputs for processing data for the new ACMP and
CSP systems. Work on this project is expected to continue through
B. The Office of Logistics, Printing and Photography Group
(OL/P$PG) is continuing work on a bar code project to track
production statistics throughout P&PG production areas. When
implemented, employees will use a hand held bar code reader, or a
bar code "wedge" attached to a personal computer, to,"wand"
individual production-statistics into the PPG Management
Information System (MIS). The current procedure involves the
completion of production statistics forms, by each employee, for
input by other P$PG personnel. The new bar code system will
eliminate both the form and manual data entry requirements and speed
the update of the MIS. Initial testing of the capture of production
data, using the hand held bar code reader, began on the evening of
22 August in the P&PG Camera Section. On 23 August, the data
captured during testing was processed into the MIS and the results
evaluated. Based on favorable results from these tests, other PPG
sections will be included in the initial testing which will continue
the end of August.
through the rest of this week.
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
125X1
25X1
L~A1
D. What appeared at first to be a relatively minor electronic
malfunction with one of the Office of Logistics, Printing and
Photography Group's (OL/P&PG) Dicomed color graphic recorders has
led to an extended period of downtime. A service call was placed to
Crosfield Electronics, Inc., (CEI) on Wednesday morning, 17 August,
when the system would not boot up. A CEI technician diagnosed the
problem and ordered parts shipped in the ususal manner for pickup
the following morning. On Thursday morning, 18 August, the
technician called from Dulles Airport to report that the parts had
not arrived. He later confirmed that the parts had not been shipped
for reasons unknown at that time. Another senior technician stated
that several employees in the CEI Parts Department had been given
lay-off notices due to an upcoming reorganization, and that morale
is very low at this time. Arrangements were made to have the parts
sent on a regular passenger flight on Thursday afternoon. The
technician arrived with the parts at 1630 hours, and the system was
operational by 1700 hours. On Friday morning, 19 August, the system
was down again, apparently due to the same problem. A service call
was n1aced and the cvctem was reactivated by COB on 19 August.
E. The first of the Office of Logistics, Printing and
Photography Group's (OL/P&PG) new Datagraphix COM recorders arrived
at the P&PG Computer Output Microfiche (COM) Center on 18 August.
These recorders are to replace the existing outmoded ones now in the
COM Center. Allied maintenance electricians are installing the
necessary receptacles and began installation on 22 August.
Photography Group (OL/P$PG). Recent OIT tapes, created in the lower
density format than before, seem to be more compatible with the tape
F. Programmers from the Office of Information Technology,
Applications Management Branch (OIT/AMB) may have solved the ongoing
problem of tape data errors on the biweekly payroll microfiche
requests that are processed by the Office of Logistics, Printing and
drives in the P&PG Computer Output Microfilm (COM) Center.
S E C R E T
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
J l; U K l; I
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6
25X1
25X1
25X1
25X1
25X1
25X1
25X1
stated that the EXCOM briefing was rescheduled once again for the
morning of 22 August. The job was completed over the weekend and
G. Late Thursday afternoon, 18 August, the Directorate of
Operations, Counterintelligence Center, Analytical Group (DO/CIC/AG)
tasked the Office of Logistics, Printing and Photography Group
(OL/P$PG) to create four complex vugraphs by the next day for an
EXCOM briefing to be held the morning of 22 August. Production
started immediately and a laser proof of one finished vugraph was
reviewed by the customer the morning of 19 August. However, the
client notified PPG that the scheduled briefing was changed to
later the following week. As of 1300 hours on 19 August, the client
picked up by the customer on Monday morning, 22 August.
H. The Office of Logistics, Printing and Photography Group
(OL/P&PG) received a request on 11 August from the Office of
Information Resources, Visual Media Branch (OIR/VMB) to transfer
35mm black & white movie film onto videocassette.
Capitol Video Communications in Washington, D.C. was not available
until 17 August. Six additional videocassettes were produced in
house by PPG Center from the commercially-produced master video.
The job was completed and ready for customer pickup by Thursday, 18
The film-to-video transfer must be done
y a cleared commercial vendor, but secure available time with
August.
III. Upcoming Events:
None.
IV. Management Activities and Concerns:
None.
S E C R E T
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100050026-6