INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 19 JANUARY 1988

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90-00078R000100010037-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 27, 2016
Document Release Date: 
February 13, 2013
Sequence Number: 
37
Case Number: 
Publication Date: 
January 19, 1988
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP90-00078R000100010037-8.pdf225.52 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8 25X1 25X1 25X1 25X1 25X1 2bAl 25X1 25X1 25X1 25X1 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 19 JANUARY 1988 1. Progress Report on Tasks Assigned by the DCl/DDCI: 2. Items or Events of Major Interest that have Occurred During the Preceding Week: A. TECHNICAL GROUP Federal Automated Requisition System (FARS). demonstrated the log-on procedure in VM to he Interdepartmental Support Branch (IDSB/SD/OL). She also completed changes to the parameter files for Integrated Database Management System/Relational (IDMS/R) FARS. All errors have been corrected and the files are ready for use with other programs in IDMS/R FARS. Also completed were the menu changes that were requested by (FARS DBM). As a result of the changes there are five new menus that have replaced one menu for working with suspense requisitions. There now is a separate menu for adding, modifying, deleting, querying, and cancelling requisitions. In addition she wrote process code to remove data from the FARSUSP file for Integrated Database Management System/Relational (IDMS/R) FARS. discovered that there was data in the file wnen testing a CULPRIT report. also wrote process code to add, modify, delete and query data in the FARSUSP file. The new process code will require testing; so has asked IDSB/SD to input sample data to test various programs. ( 2 ) attended the FARS Engineering Review Board (ERB) meeting, where the discussion centered around the progress made on the conversion of FARS from the Data General (DG) to Integrated Database Management System/ Relational (IDMS/R). The ERB also discussed concerns on the 3812 printer, the relocation of VM terminals and phone lines for the new system. The next FARS ERE meeting will be held on Tuesday, 16 February 1988, from 1000 until 1200 in room Building. (3) (IDSB/SD/OL) has arranged a meeting with Department of the Army representatives to discuss their data processing procedures in relation to the FARS system interface. The meeting is scheduled for 21 January 1988. TG/IMSS will be in attendance. Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8 Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8 25X1 25X1(2) 25X1 25X1 25X1 ')c)(1 25X1 25X1 ocyi 25X1'-'e"' 25X1 cD 25X1 N. 0 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 19 JANUARY 1988 (4) conversion. has requested a briefing for (C/SD/OL) on the status of the FARS The briefing is scheduled for 19 January. ""(-5-)----FtrIXT-CWIYarer-Syst'artrtFCS`rt. On 14 January, received control of all General Electric Company's (GE) documentation, notes, and software code that dealt with the Logistics Automated Data System (LADS III) conversion. This action cormallitx_a_c_t_-- with the Office of Logistics (6) informed TG/IMSS/OL that a TK50 tape cartridge had become lodged in the Micro VAX II tape drive during system backup. Office of Communication technicians were able to remove the tape drive to be Tech-Rec'ed back to Headquarters to remove the tape cartridge and repair the drive. A new tape drive will be sent back to is still running, but does not have backup/restore capabilities. (7) Logistics Overtime Tracking System (LOTS). completed rewriting the LOTS NOMAD system. This procedure and significantly included major modifications to the menu and one minor SCHEMA correction. The new system enhances the presently-used OVERTIME s ste submitted her new system to successfully with one minor completion of a user manual production. who tested 1.L suggestion, and with the it should be ready to go to (8) Inventory Control System (ICS). responded to a request by the Data Base Manager of ICS to examine the impact in providing "read only" access to the ICS dictionaries for an organization which has read-only access for many ICS files, but not dictionaries. Meeting the request would involve changing the GIMS security for all the data dictionaries, which would entail about one week of changes, testing and implementation on ICS production. (9) Contract Team Local Area Network (CTLAN). A representative attended the CTLAN working group meeting. The meeting, chaired by (PMS/OL), addressed the duties and responsibilities of the contract teams. By understanding their current situation, the group can look for ways to increase their productivity through automation. The group also began defining what actions would take place on the CTLAN and which would take place in CLAS. 2 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8 Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8 25X1 25X1 25X1 25X1 25X1 25X1 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 19 JANUARY 1988 (10) Logistics Employee Training and Tracking System (LETTS). A file has been created that lists employees in OL by social security number and the number of courses they have taken, in addition to the extracts from the PRIM and PYRAMID databases. The extracts will be used to create individualized personnel history statements for OL employees. (11) In response to a memo received from Operations Support Branch, Supply Division (OSB/SD/OL), portions of the User's Manual for the Wang/CRAFT Accountable Property System (APS) are being revised by a TG Programmer Trainee. Upon completion of these revisions, the manual will be sent forward for final review and approval. A representative of the Audit Staff, who has been involved in the development of APS, advises that an approval memo has been prepared by his office and is in the process of being signed by the appropriate Audit Staff officials. B. PLANNING IMSS is working with Budget and Fiscal Branch (B&FB) to revise the written justification for the OL Base Program. C. CLAS (1) Meeting with Cullinet: Representatives of the CLAS/BARS Project met with Cullinet at their office on Wednesday to discuss the trip to Boston for the three Office Directors. We conveyed to Cullinet our concerns regarding Cullinet's delivery schedules of software that affect our project implementation schedules and asked them to propose a scenario for an IOC on 1 October that they can guarantee with respect to software availability, contractual support for interfaces and on-site support. An agenda is set as well an objectives paper that will be given to the Office Directors. (2) The CLAS Supply Team has successfully completed two additional prototype test packets Both tests were considered satisfactory and the details of how to format and print this information is being investigated. (3) The data base error #3026, which self-corrected on the first test packet has resurfaced. The error is appearing in the receiving function in an erratic manner which increases the difficulty to pin point the problem area. The CLAS technical staff is continuing their rese rch in coordination with Cullinet representatives. 3 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/02/13 : CIA-RDP90-00078R000100010037-8 Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8 25X1 \ \ 25X1 tj 25X1 25X1 25X1 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 19 JANUARY 1988 . REGULATIONS (1) The following OL regulation was signed and published: Small Purchases Branch (2) The following Agency regulations were originated by OL and submitted to the Regulatory Policy Division, DA: Change in Electric Typewriter Repair Contract New Agency Shuttle Service (3) The following Agency regulations originating outside OL were coordinated within OL and concurred in: Waiver of Claims for Erroneous Payment 3. Significant Events Anticipated During the Coming Week 4. Perspective of Staff Activities 4 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/02/13: CIA-RDP90-00078R000100010037-8