13 - 17 JANUARY 1986

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90-00037R000100110025-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
10
Document Creation Date: 
December 23, 2016
Document Release Date: 
August 24, 2012
Sequence Number: 
25
Case Number: 
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP90-00037R000100110025-5.pdf302.37 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 13 - 17 January 1986 25X1 25X1 25X1 25X1 25X1 25X1 25X1 OC-PBS 2. All FY-88 New Initiatives have been revised, ranked and 28 positions in FY-88, are being submitted to the DDA. and rewritten. Twelve initiatives, totaling bye OC-CS This contract will, on a quick reaction basis, provide services, studies, spare parts, modifications to and repair of Time Division Multiple Access (TDMA) equipment. 3. A total of ~ hours of annual leave was forfeited OC employees in 1985. 1. A contract has been negotiated with covering the remainder of FY-86. 2. Contract negotiations with the were completed on 17 January. Under the Statement of Work, 0 will install 10 kW and 1 kW trans- mitters, remote control systems, equipment racks, including patch panels, Other Equipment Manufacturer (OEM) equipment and wiring Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 OC-CS (Continued) OC-MPS 1. The FY88-92 New Communications Services have been received from all the Directorates except for the DI. Costing figures for these requirements will be coordinated between OIT components and the OC Divisions in the very near future. 2. Responses to the corporate business areas of the OC Strategic Plan are being integrated into the OC-MPS Requirements Tracking System (RTS). The RTS will allow the Office to maintain a chronology and track the development of each business area. 3. Satellites: a. participated in a special MILSATCOM Panel working session on 14-15 January at the MILSATCOM Office, Arlington Hall Station (AHS). The purpose of the session was to collect, analyze and prepare to present information relating to an EHF wideband package to the C3 Review Council. A second working session is planned during the first week of February. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 25X1 25X1 OC-MPS (Continued) OC-AMD 1. OTE careerist, reported in 21 January as Chief, Developmental Training Branch. Ihas been named to replace as OC's Security Officer. The tentative aate tor i.s reporting is 10 February. 3. About 20 employees attended the Wang PC briefing on 17 January. The audience was comprised of personnel with a variety of interest and levels of experience in the use of the Wang PCs. As a follow-up to the briefing, the forming of an OC Wang PC Users Group was discussed and will be explored. 4. On 16 January, the D/CO accompanied Mr. Richard J. Kerr, Deputy Director for Administration, on a tour of the training facility and an introduction to the Department Chiefs. 6. Four operations training instructors are conducting overseas training with six additional instructors processing for on-site training. There is presently a lull in training activities but projections for February and March indicate a significant increase in overseas training requirements may be expected. the Communications School instructor utilized the training session to determine minimum terminal downtime required 7. With completion of the second TDMA installation in Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 OC-AMD (Continued) for TDMA training. Although the goal was a minimum of 24 hours, only eight hours downtime was required to conduct this training. 8. Staff (ESS as the Video Prod is transferring will join the Educational Support uction Specialist on 21 January. from the DI Television Center at Head quarters. 10. On 12 January, the second running of Project SCREEN testing was held at the Ramada Inn with nine TCO applicants taking the profile testing. 11. OC-AMD/RES personnel telephoned more than 600 individuals who had received Personal History Statement (PHS) packets from OC in response to reviews of their resumes or from recruitment presentations to request they return the completed PHS packets as soon as possible. An interesting note evolved from this endeavor. Of 102 applicants who stated they no longer had an interest in employment with the Agency, 36 indicated their lack of interest was due to the increase in terrorism throughout the world. Although several other reasons, such as continuing education or additional job opportunities, were also cited, the requirement to serve overseas and the associated risk from terrorism was the major reason given for cancelling many employment applications. 12. All biographic profiles produced by OP for OC have now been placed in the soft files. 13. Agency records retention schedules have been modified to allow us to keep soft files on retirees for up to 18 months. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 orlyi 25X1 25X1 OC-AMD (Continued) This will be particularly useful when annuitants are processed for independent contracts. Because soft files cannot be stored at the Records Center, it will be necessary to send all original material to OP for inclusion in an employee's Official Personnel File and destroy the remainder. Retention beyond 18 months would be difficult even if the schedules allowed more flexibility. The new motorized OC filing system requires careful monitoring for balance. Before the recent purge of retiree files, the machinery was beginning to experience considerable stress due to load imbalance. Reduction of the files on retirees and resignees has corrected the problem. 14. OC Officers attended the Upward Mobility Program, DA Career Day, which was held at Headquarters on 16 January. _ - OC advertised three Upward Mobility vacancy noti es: F 1 represented the ADP Librarian position. Several employees were interviewed in connection with the vacant positions. The DA was well represented and a special "thanks" is extended to the three participants who represented OC. (OC-AMD) represented the TCO pos represented the ET position and' OC-CSD 1. The DDA and the D/CO toured the Cryptographic Materiels Branch (CMB) on 16 January. 2. CMB personnel received a well-earned certificate of appreciation and cash awards on 17 December. The awards were in recognition of sustained high performances during the period 1984-1985. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 25X1 25X1 25X1 OC-CSD (Continued) 4. On 15 January, of OC-CSD/NSB attended a briefing at NSA by two representatives of , on voice recognition technology. NSB is gathering information to apply wards recognition project. The representatives from will forward their research information on the su ject as well as an extensive bibliography to us via our NSA liaison. 6. also performed software certification testing on the WASH-SPARS system from 9-14 January, which was subsequently certified for on-line operation. OC-ED 1. MERCURY Program Office (MPO): 25X1 2bA1 25X1 . A meeting between representatives from and MPO was conducted on 15 January. The purpose of the meeting was to resolve the last outstanding Design Problem Report from the External Network Server detailed design review conducted last December. b working level meetings were held on 14 January at and 16 January at OIT/DNG to formulate a list of Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 OC-ED (Continued) candidate circuits for the Initial Operational Capability Packet Switch (IOCp). The listings will be compiled into a tasking memorandum to the appropriate OC and OIT offices for approval. A total of 60 circuits and 30 circuits at OIT have been identified as most representative of the circuitry handled by the message switches. c. CONTEL presented an updated draft of the results of a network simulation model to determine potential problems in the MERCURY architecture. The results show that projected volumes can be handled for the four-node CONUS network which will be fielded from 1986 through 1988. Additional refinements of the model data will occur and expansion to simulate remote deployment of MERCURY systems is planned. 2. Second Phase Automated Relay Switch (SPARS): 25X1 25X1 25X1 25X1 25X1 25X1 LZDAI installation. Control of the PCS SPARS Programmer b. depar team members re SP turned after a successful ARS was transferred to the ted on 18 January for TDY to install the Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 OC-ED (Continued) 25X1 5. STU-III - 25X1 (OC-CSD) and (OIT/VCB) attended the STU-III Users Conference from 15-17 January. NSA provided briefings on the Key Management Center, STU-III terminal acquisition, Integrated Logistics Support, STU-II/STU-III swap-out, terminal testing and the STU-III contractors provided information on their base model terminals and the enhancement options. The Users Conference also provided the opportunity to develop contacts with the three contractors. OC-FND 1. In response to requests, Agency communications support was provided to: Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 25X1 25X1 25X1 25X1 OC-FND (Continued) 6. Capitalization Program Status: PRS-6/7 TERP-IIA Systems Operational Installations in Progress Equipment on Site Equipment Being Shipped PRS installations are underway system was "partially activated" on 17 January due to the sudden demise of the existing PRS-lA transmit system. RP-IIA installations are underway 8. Representatives of OC-FND/RMS and OC-ED visited the to operate the SELCAL unit with new software changes and discuss revisions for operator and maintenance manuals. Price quotations for training to be conducted in the Headquarters area were obtained for both the SELCAL and receiver units. The receiver training has been slipped one month (to early March) due to production delays, but SELCAL production and training is expected to continue on schedule. from 13-16 January Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5 OC-FND (Continued) OL, and representatives of the Wang Corporation on 17 January to discuss current Wang Maintenance contract problems and the possibility of assigning two additional Wang engineers to TSB. 11. Representatives of TSB met with 13. Requisitions for installation materials totalling $66,585 are being held until the OC-FND FY-86 budget reductions have been determined. To date, approximately 47.4 percent of the OC-FND FY-86 budget has been encumbered. ecutive Assistant, OC Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5