13 - 17 JANUARY 1986
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP90-00037R000100110025-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
10
Document Creation Date:
December 23, 2016
Document Release Date:
August 24, 2012
Sequence Number:
25
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 302.37 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
13 - 17 January 1986
25X1
25X1
25X1
25X1
25X1
25X1
25X1
OC-PBS
2. All FY-88 New Initiatives have been revised, ranked
and 28 positions in FY-88, are being submitted to the DDA.
and rewritten. Twelve initiatives, totaling
bye
OC-CS
This contract will, on a quick reaction basis, provide services,
studies, spare parts, modifications to and repair of Time
Division Multiple Access (TDMA) equipment.
3. A total of ~ hours of annual leave was forfeited
OC employees in 1985.
1. A contract has been negotiated with
covering the remainder of FY-86.
2. Contract negotiations with the
were completed on 17 January. Under
the Statement of Work, 0 will install 10 kW and 1 kW trans-
mitters, remote control systems, equipment racks, including patch
panels, Other Equipment Manufacturer (OEM) equipment and wiring
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
OC-CS (Continued)
OC-MPS
1. The FY88-92 New Communications Services have been
received from all the Directorates except for the DI. Costing
figures for these requirements will be coordinated between OIT
components and the OC Divisions in the very near future.
2. Responses to the corporate business areas of the OC
Strategic Plan are being integrated into the OC-MPS Requirements
Tracking System (RTS). The RTS will allow the Office to maintain
a chronology and track the development of each business area.
3. Satellites:
a. participated in a special MILSATCOM
Panel working session on 14-15 January at the MILSATCOM Office,
Arlington Hall Station (AHS). The purpose of the session was to
collect, analyze and prepare to present information relating to
an EHF wideband package to the C3 Review Council. A second
working session is planned during the first week of February.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
25X1
25X1
OC-MPS (Continued)
OC-AMD
1. OTE careerist, reported in 21 January
as Chief, Developmental Training Branch.
Ihas been named to replace
as OC's Security Officer. The tentative
aate tor i.s reporting is 10 February.
3. About 20 employees attended the Wang PC briefing on
17 January. The audience was comprised of personnel with a
variety of interest and levels of experience in the use of the
Wang PCs. As a follow-up to the briefing, the forming of an
OC Wang PC Users Group was discussed and will be explored.
4. On 16 January, the D/CO accompanied Mr. Richard J. Kerr,
Deputy Director for Administration, on a tour of the training
facility and an introduction to the Department Chiefs.
6. Four operations training instructors are conducting
overseas training with six additional instructors processing
for on-site training. There is presently a lull in training
activities but projections for February and March indicate a
significant increase in overseas training requirements may be
expected.
the Communications School instructor utilized the
training session to determine minimum terminal downtime required
7. With completion of the second TDMA installation in
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
OC-AMD (Continued)
for TDMA training. Although the goal was a minimum of 24 hours,
only eight hours downtime was required to conduct this training.
8.
Staff (ESS as the Video Prod
is transferring
will join the Educational Support
uction Specialist on 21 January.
from the DI Television Center at
Head quarters.
10. On 12 January, the second running of Project SCREEN
testing was held at the Ramada Inn with nine TCO applicants
taking the profile testing.
11. OC-AMD/RES personnel telephoned more than 600
individuals who had received Personal History Statement (PHS)
packets from OC in response to reviews of their resumes or from
recruitment presentations to request they return the completed
PHS packets as soon as possible. An interesting note evolved
from this endeavor. Of 102 applicants who stated they no longer
had an interest in employment with the Agency, 36 indicated their
lack of interest was due to the increase in terrorism throughout
the world. Although several other reasons, such as continuing
education or additional job opportunities, were also cited, the
requirement to serve overseas and the associated risk from
terrorism was the major reason given for cancelling many
employment applications.
12. All biographic profiles produced by OP for OC have now
been placed in the soft files.
13. Agency records retention schedules have been modified
to allow us to keep soft files on retirees for up to 18 months.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
orlyi
25X1
25X1
OC-AMD (Continued)
This will be particularly useful when annuitants are processed
for independent contracts. Because soft files cannot be stored
at the Records Center, it will be necessary to send all original
material to OP for inclusion in an employee's Official Personnel
File and destroy the remainder. Retention beyond 18 months would
be difficult even if the schedules allowed more flexibility. The
new motorized OC filing system requires careful monitoring for
balance. Before the recent purge of retiree files, the machinery
was beginning to experience considerable stress due to load
imbalance. Reduction of the files on retirees and resignees
has corrected the problem.
14. OC Officers attended the Upward Mobility Program,
DA Career Day, which was held at Headquarters on 16 January.
_ -
OC advertised three Upward Mobility vacancy noti es: F
1
represented the ADP Librarian position. Several employees were
interviewed in connection with the vacant positions. The DA was
well represented and a special "thanks" is extended to the three
participants who represented OC.
(OC-AMD) represented the TCO pos
represented the ET position and'
OC-CSD
1. The DDA and the D/CO toured the Cryptographic Materiels
Branch (CMB) on 16 January.
2. CMB personnel received a well-earned certificate of
appreciation and cash awards on 17 December. The awards were
in recognition of sustained high performances during the period
1984-1985.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
25X1
25X1
25X1
OC-CSD (Continued)
4. On 15 January, of
OC-CSD/NSB attended a briefing at NSA by two representatives of
, on voice recognition technology. NSB is gathering
information to apply wards recognition project. The
representatives from will forward their research
information on the su ject as well as an extensive bibliography
to us via our NSA liaison.
6. also performed
software certification testing on the WASH-SPARS system from
9-14 January, which was subsequently certified for on-line
operation.
OC-ED
1. MERCURY Program Office (MPO):
25X1
2bA1
25X1
. A meeting between representatives from
and MPO was conducted on 15 January. The
purpose of the meeting was to resolve the last outstanding Design
Problem Report from the External Network Server detailed design
review conducted last December.
b working level meetings were held on 14 January at
and 16 January at OIT/DNG to formulate a list of
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
OC-ED (Continued)
candidate circuits for the Initial Operational Capability Packet
Switch (IOCp). The listings will be compiled into a tasking
memorandum to the appropriate OC and OIT offices for approval.
A total of 60 circuits and 30 circuits at OIT have been
identified as most representative of the circuitry handled by the
message switches.
c. CONTEL presented an updated draft of the results of
a network simulation model to determine potential problems in the
MERCURY architecture. The results show that projected volumes
can be handled for the four-node CONUS network which will be
fielded from 1986 through 1988. Additional refinements of the
model data will occur and expansion to simulate remote deployment
of MERCURY systems is planned.
2. Second Phase Automated Relay Switch (SPARS):
25X1
25X1
25X1
25X1
25X1
25X1
LZDAI
installation. Control of the
PCS SPARS Programmer
b.
depar
team members
re
SP
turned after a successful
ARS was transferred to the
ted on 18 January for TDY
to install the
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
OC-ED (Continued)
25X1
5. STU-III -
25X1
(OC-CSD) and
(OIT/VCB) attended the STU-III Users Conference
from 15-17 January.
NSA provided briefings on the Key Management
Center, STU-III terminal acquisition, Integrated Logistics
Support, STU-II/STU-III swap-out, terminal testing and the
STU-III contractors provided information on their base model
terminals and the enhancement options. The Users Conference
also provided the opportunity to develop contacts with the
three contractors.
OC-FND
1. In response to requests, Agency communications support
was provided to:
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
25X1
25X1
25X1
25X1
OC-FND (Continued)
6. Capitalization Program Status: PRS-6/7 TERP-IIA
Systems Operational
Installations in Progress
Equipment on Site
Equipment Being Shipped
PRS installations are underway
system was "partially activated" on 17 January due
to the sudden demise of the existing PRS-lA transmit system.
RP-IIA installations are underway
8. Representatives of OC-FND/RMS and OC-ED visited the
to operate the SELCAL unit with new software changes and discuss
revisions for operator and maintenance manuals. Price quotations
for training to be conducted in the Headquarters area were
obtained for both the SELCAL and receiver units. The receiver
training has been slipped one month (to early March) due to
production delays, but SELCAL production and training is expected
to continue on schedule.
from 13-16 January
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5
OC-FND (Continued)
OL, and representatives of the Wang Corporation on 17 January
to discuss current Wang Maintenance contract problems and the
possibility of assigning two additional Wang engineers to TSB.
11. Representatives of TSB met with
13. Requisitions for installation materials totalling $66,585
are being held until the OC-FND FY-86 budget reductions have been
determined. To date, approximately 47.4 percent of the OC-FND
FY-86 budget has been encumbered.
ecutive Assistant, OC
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP90-00037R000100110025-5