MISSION 2021

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89B00709R000500960003-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 5, 2011
Sequence Number: 
3
Case Number: 
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP89B00709R000500960003-6.pdf110.53 KB
Body: 
Sanitized Copy Approved for Release 2011/10/05: CIA-RDP89B00709R000500960003-6 on 9 July P89 17J7 ~. --- ---9 i cwas flown and ,S" Band Radar. Duration of 25X1 92 consisted of the delay 25X1 .1 equipment _-ight was eight hours. Take-off was made on schedule, however, of the effected this stated in the preparation atl nssion 25X1 in receipt 2020. No other problems were encountered to of launching this mission. s.,,, i nman't . ame h e c - reported satisfactory operation of However, post flight inspection revealed that one major malfunction occurred 25X1 ed and wound around t ollerlast loo l e met ing p on m e on this mission. The fi o magazine. s after 1028 cycles on the left oblique t egexposure counter failed to operate target of the mission. In addition, The malfeeding camera. occured on during the entire mission on the right oblique sion film on the oblique magazines at end the be inherent in s until of This situation se numerous goccas aup ions. of g the trailer the ma azine, but does not seem too smolt ofathettimeeitaise the the film is at the end of spool and is that is Jammed. The exposure counter Seven er failure was determined be due feet of to the counter and not the maprocessedonethisnmission. fifty The film was tracker film was exposed and tions? 2207E excep not trackable due to undercast with to 1 followin a. From /+949 4 to 5350N 2732E b. From 5256N 2945E to 4908N 1635E c. From 505w 1937E 0707E. d. Sixty miles west of point November to 4953N O Plotting time for this mission was two hours. The electronics recorder seemed to be intermitten in operation short periods of time. 4 several times during the flight or TS # 155330 Page Copy 2 of 2 co Co pies Sanitized Copy Approved for Release 2011/10/05: CIA-RDP89B00709R000500960003-6 Sanitized Copy Approved for Release 2011/10/05: CIA-RDP89B00709R000500960003-6 Ground pre-flight checks were normal but the clock signal on the span channel did not come on at take-off. This tone came on about one hour'and fifteen minutes after take-off. A few radar signals were received during this time but many signals were received after the tone channel came on. The electronic portion of this recorder has been replaced until the trouble can be determined. All other aspects of the mission were satisfactory. The compilation of weather data for the report 25X1 for missions 2020 and the weather statistical report to accompany the 25X1 Commander's Mission report were being compiled at the same time the e g on dera d +.,1a serious cons t e s s sugge I i t 2024. deletion of the report "Documentation of Flig is (Weather)". This information is very accurately covered in the which is dispatched much earlier than the Commander's Report. The time required to complete this Documentation of Flights (Weather) is requiring the weather staff to be on continuous duty preparing reports or preparing weather briefings twenty-four hours a day when operations run concurrently over more than one day. Any comments on the deletion of this study would be appreciated. DISTR: Original .- Headquarters ATTACH1 ENTS : A - Documentation of Flights (Weather) A-2020 (TS#155330A) B - Documentation of Flights (Weather) A-2021 (TS#155330B) TS # 155330 Page 3 of 3 pages Copy of 2 copies 'Ir Lk* 1 .17 iven to the b ti i Sanitized Copy Approved for Release 2011/10/05: CIA-RDP89B00709R000500960003-6