MEETING AT WESTINGHOUSE REGARDING (SANITIZED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89B00487R000300600009-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 21, 2011
Sequence Number: 
9
Case Number: 
Publication Date: 
May 14, 1956
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP89B00487R000300600009-8.pdf125.78 KB
Body: 
Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 SAPC-6194 Copyt of 3 14 May 1956 SUBJECT : Meeting At Westin_7honse Regarding APQ-56 Radar 1. Time and Place of Meeting: The meeting was held on 9 May 1956 in the engineering office of Westinghouse Air Arm, Friendship Airport. 2. Attendance: Westinghouse Project Staff 3. A written concurrence was forwarded to Discussion: a. The first item of discussion was the instructions for delivery of spares. was informed of Project con- currence with his of posing delivery procedure. b. Regarding the total quantity of spares, feels that the present spares list, ded, W111 e adequate to support both the AQUATONE and requirements for a period of one year. As a result, it was agreed that two-thirds of the spares (groups 1 and 2) should be charged and delivered AQTTATONE and group 3 should be charged and delivered to In addition i was geed that three AQUATONE flyaway be made up at out of the group 2 spares, and would make up a single FAK out of their group 3 spares. Wes ng- house is to supply, when able, a recommended list for FAK content. This will be based on maintenance experience gained during the Watertown training phase. Additional FAKs will be required by JBINCLUDE and the USAF projects and should be covered in future procurement contracts, c. The delivery of item #1 appears to be on schedule and the equipment should be installed in the Westinghouse DC-3 before 1 June. All bailment obstacles preventing transfer of B-17 antenna etc., have been removed and the transfer is being made. R me 3M Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 ~rp d. requested a waiver of the final portion of the exp os on tests. This test is designed to prove the presence of an explosive mixture in the explosion chamber. While the "proof" explosion is meant to be contained in a wire cage, recent tests have resulted in overall flame pro- pagation and equipment destruction. A waiver of this portion of the test specification will be sent to Westinghouse by the Contracting Officer. e. The future procurement schedule was the final item discussed. Attachments A and B show the schedule requested by the Project. Underlined items are already covered in the existing contract. Subscripts a, p, u indicated AQUATONE, and USAF equipment respectively. FAK items in parenthesis are to be made up by AQUATONE and out of items G and H. Question marks in these columns indicate times for reconsideration of the depot supply level. f.l Iwas informed that Colonel Geary was working on a priority request for the Westinghouse TWX equipment installation, g. The in-flight processing equipment being developed for the APQ-56 by Photo-Mechanisms and Eastman appears to be progressing very satisfactorily. As a result (EK) will visit Lockheed 114 May to investigate installation on a retro-fit basis. RAK:vd (14 May 1956) Distribution: 1 - EQUINE MASTER 2 - Chrono 3 - Reading Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 Sanitized Copy Approved for Release 2011/09/21: CIA-RDP89B00487R000300600009-8 O' A B p C D ) m H E A O c1 F 03 ca m A u- 40 v r-1 G 62 43 A `~ v H m a) m A O v \c10 TOTALS 19' 5 8 7 7 12 1 1 1 May 1956 la la la (1)a la June la la la la July ip lP Aug. la la (1)a Sept. lp (1)p Oct. la P Nov. 1S ? Dec, la la Jan, 1957 2p 2p 1P 2P P Feb. 2p lp lp lp lp u =- u Mar. 2p lu lp lu 2p ? lu U \ P u Apr. 3u-,,, lu lp lu lu 2p P P P May 3u 2p 2u lp Sanitized C opy Appr oved for Release 2011/09/2 1: CIA-R DP89B0 0487R00 0300600 009-8