BUILDING EVALUATION REPORTS FOR THE 2430 E STREET COMPLEX

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00874R000100150038-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 6, 2008
Sequence Number: 
38
Case Number: 
Publication Date: 
January 28, 1982
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP89-00874R000100150038-0.pdf175.58 KB
Body: 
Approved For Release 2008/06/06: CIA-RDP89-00874R000100150038-0 MEMORANDUM FOR THE RECORD EX 2 8 JAN 1982&A C~i+E~3 SUBJECT: Buildin Evaluation Reports for the 2430 E Street C/r?;LF; Complex Pt __STAT 1. On 12 January 1982, a meeting was held to discuss the Building Evaluation Reports for the 2430 E Street complex. In attendance were: Mr. S. R. Cook - GSA/Building Mr. C. E. Waters - GSA/State Mr. G. E. Kimble - GSA/State Manager Group Group - OTS/LOGS OTS/LOGS - SME,FB/LSD - SM&FB/LSD - FEB/RECD 3. The Building Evaluation Reports for the 2430 E Street complex were the next topic discussed. GSA agreed with the findings and recommendations in the reports. However, they stated that funds were not available in the current budget to begin implementation. They went on to state that funds could not be programmed until the FY 1985 budget. They did state that minor renovations would be accomplished as funds became available to look into these matters and take appropriate action. continuing water leak behind South Building and the resulting ice problem, water leaks in South and Central Buildings, and the installation of a handrail for East Building. GSA agreed 2 ~ ~ AN -1 1) 2. The meeting began with a discussion of the quality of the services provided by GSA at the 2430 E Street complex. It was acknowledged that GSA has made steady progress in improving the level of general housekeeping and maintaining environmental conditions within the buildings in accordance with the Federal Energy Guidelines. GSA crews have also responded to various trouble calls and have effected repairs in a timely manner. However, several problem areas still exist. These include the WARNING NOTICE INTELLIGENCE SOURCES AND METHODS INVOLVED OL 2 0519 Approved For Release 2008/06/06: CIA-RDP89-00874R000100150038-0 Approved For Release 2008/06/06: CIA-RDP89-00874ROO0100150038-0 SUBJECT: Buildin Evaluation Reports for the 2430 E Street Complex 4. In conclusion, GSA agreed to provide the Agency with a copy of the final report. FEB/RECD, OTS/LOGS, and SMHIFB/LSD will review the report and forward comments and recommendations to GSA. FEB/RECD shall continue to monitor the situation at the 2430 E Street complex. Project ngineer Field Engineering Branch, RECD/OL cc: D/L C/LSD OTS/LOGS ,s-tribution: Orig. -. OL/RECD Official 1 - OL/RECD/FEB Chrono OL/RECD/FEB (28 January 1982) STAT STAT STAT STAT 2 Approved For Release 2008/06/06: CIA-RDP89-00874ROO0100150038-0 Approved For Release 2008/06/06: CIA-RDP89-00874R000100150038-0 W EX SA 9 DEC 19B1 C)i E6 R,O C/r Enga - L SUBJECT: Meeting with General Services Administration ?, 9 DEC 198' 1. On 9 December 1981, RECD/01, representatives, STAT met with General Services Administration STAT (GSA:) representatives, Messrs. Jacobson and Craddock. The following topics were discussed. a. (Building Elevators STAT b. Central Depot Paving c. d. 2430 E. Street A/E Study ?. Mr. Jacobson advised that the STAT paving desired by the Agency will be an additive bid item. G.`A will try to do the maximum amount of work with funds availaib:i-e. If the funds are released, it is planned to advertise in the second. quarter of FY 1982. Building Prospectus STAT elevator design is being reviewed and a Government STAT cost estimate is being. prepared. Boilerplate ww,will be added to the design package and GSA plans to advertise in late February of 1082 with bid opening in March of 1982. 3. paving is caught in a budget squeeze STAT and an expiring prospectus. Paving will be done as soon as the budget is approved. There is a dollar limitation on the line item for Building B in the prospectus of $441,000. The additional 4. The prospectus was disapproved by the Central office Prospectus 11 Review oar-. It Was proposed to be included in GSA's facility plan for FY 1985. GSA intends to revise and resubmit the prospectus and ask for reconsidera- r~-n in summer of 1982 and try to get the prospectus back into 1:1' 1985. S. The final report by the architect-engineer on the study for 2430 E. Street (South, Central and East Buildings) was received in GSA on 7 December 1981. They will be reviewing it and will be programming some type of action. There is no STAT Approved For Release 2008/06/06: CIA-RDP89-00874R000100150038-0 Approved For Release 2008/06/06: CIA-RDP89-00874R000100150038-0 0 s SUBJECT: Meeting with General Services Administration money budgeted for this work, and the earliest GSA could get money is about FY 1985. GSA will make an effort to do painting and habitability improvements in the next nine months. It is intended to limit the work with FY 1982 funds to about $100,000 per building. This reduces the number of approvals required for project approval. It is not known at this time whether a prospectus will be required for the major HVAC, utility, and structural repairs. GSA will have more information after the final A/E report has had a thorough GSA review. 6. In closing the meeting, Mr. Jacobson agreed to send a copy of the draft prospectus He expressed STAT concern that it is only a draft and should be handled as such. He also stated he would call regarding the elevator schedule STAT since he is too busy to send a memorandum. Also, it was mentioned that we will be working with Mr. Lopez of GSA to replace the chiller Chief, Field Engineering Branch, RECD/OL Distribution: Orig. - OL/RECD Official 1 - OL/RECD/FEB Chrono OL/RtCD/FEB (9 December 1981) STAT STAT STAT Approved For Release 2008/06/06: CIA-RDP89-00874R000100150038-0