CIA/GSA SPECIAL WORKING GROUP MEETING AT 2430 E STREET ON 14 JULY 1982

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00874R000100150017-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 6, 2008
Sequence Number: 
17
Case Number: 
Publication Date: 
July 19, 1982
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP89-00874R000100150017-3.pdf142.16 KB
Body: 
Approved For Release 2008/06/06: CIA-RDP89-00874R000100150017-3 g WHICH MAY BE USED. (47) TRANSMITTAL SLIP DATE 7/19/82 TO. C/LSD/0L ROOM NO. I BUILDING 3E14 Headquarters FORM NO I FEB 55 . 241 REPLACES (ylp 3RF ~ Approved For Release 2008/06/06: CIA-RDP89-00874R000100150017-3 Approved For Release 2008/06/06: CIA-RDP89-00874R000100150017-3 V V 19 J U L 1982 SUBJECT: CIA/GSA Special W g Group Meeting at 2430 E Street on 14 July 1982 1. The subject meeting convened at 0930 hours at South Building. The General Services Administration (GSA) was represented by Messrs. John Alderson,,, Stanley Langfeld, Ted Leininger, and Sonny Cook. The Agency was represented by Messrs. Dan King. 25X1 25X1 25X11 2. After introductory remarks) Ithe 25X1 group visited a number of typical problem areas in the three main buildings. Featured events were leaks, stains, damaged plaster and ceilings, and various heating, ventilating, and air-conditioning (HVAC) problems. 0 25X1 3. After the tour, the group reconvened in a Conference Room in South Building and discussed those general problem areas of: a. Inadequate preventive maintenance. b. Inadequate custodial services. c. Need to upgrade building utility systems. F7 25X1 4. Without going through the entire list of problems discussed, the general feeling of GSA (Mr. Alderson) was that the Agency had a basis for complaint but that to best achieve results the problems should be categorized into major and minor concerns. The State Building Manager should work with our people and where funds were deficient it would become a Central Office problem. F_ 5. Mr. King alluded to various efforts and assurances on the part of GSA back over the years to do better but that all had depended on resources and priorities. Indicating some skepticism that things could be different in the future, he then alluded to the past tendency to put off major improvements for lack of funding while the Agency continues to provide millions to GSA through the Standard Level Users Charge (SLUG) process with few discernable results of significance being apparent. He subsequently insisted on a schedule by which the improvements could be accomplished. 25X1 fl 1A 25X1 25X1 Approved For Release 2008/06/06: CIA-RDP89-00874R000100150017-3 Il. a H hVi F3' P A H 01 k-111 i! Cr1 to Approved For Release 2008/06/06: CIA-RDP89-00874R000100150017-3 V V SUBJECT: CIA/GSA Special Working Group Meeting at 2430 E Street on 14 July 1982 6. Mr. Leininger alluded to a $700,000,000 backlog with only $42,000,000 authorized per year causing the list to grow larger. When asked about the possibility of increased proportion of the SLUC funds being utilized, he admitted to a 200 to 250 million annual surplus. Dan requested that if GSA couldn't improve things then they should say so such that we could proceed on our own. Mr. Alderson responded, "It seems to me we've said we will do it" and alluded to the existing prospectus and its date. (This general theme was flogged thoroughly for an appreciably longer period with the general result that the Agency should look at the best date GSA could provide and GSA would guarantee them if acceptable). 7. The desirability of having a responsible GSA presence in the complex to relieve Agency people from having to attend to GSA type activities was; discussed. Deputy Chief, Real Estate and Construction Division, OL 8. The events) (were 25X1 brought up and the question of the turndown of the prospectus by the Central Office (twice) will be looked into by Mr. Alderson. F-1 25X1 9. Finally, it was agreed that will commence discussions with Sonny Cook on 27 July 1982 at E Street -- to prioritize needed work. F ] 25X1 cc.: C/LSD/0L Distribution: Orig. OL/RECD Official /i - OL/RECD Chrono 1 - OL Reader OL/RECD (19 July 1982) 25X1 ~'AN Ri~,n ap k7 ti r?klsun E)' {M,tt Approved For Release 2008/06/06: CIA-RDP89-00874R000100150017-3