DI SPACE MODIFICATION IN THE NEW HEADQUARTERS BUILDING (NHB)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00244R001203050007-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 27, 2016
Document Release Date:
May 11, 2011
Sequence Number:
7
Case Number:
Publication Date:
September 11, 1986
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 38.33 KB |
Body:
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP89-00244R001203050007-9
11 September 1986
MEMORANDUM FOR THE RECORD
SUBJECT: DI Space Modification in the New Headquarters Building (NHB)
1. After several discussions and calculations, it seems that the space
designated for ASG would be more advantageous for MPSS, NAASW, and IPC.
This space swap would not cause a construction impact and the square
footage allocated to DI in the NHB would remain the same.
Vacated from NHB
Added from NHB
MPSS
7785
ASG
12095
IPC
1000
OSWR
1290
NAASW
4600
13385
13385
2. The space vacated by MPSS and IPC from the OHB is approximately
8500 sq.ft. vice the 9700 sq.ft. that would have been made available by
moving ASG. However. the 4600 sq.ft. that NAASW is now occupying at
is now planned for the NHB. This seems an apparent
loss of sq.ft. by the DI but it is most likely countered by the expansion
caused by splitting OCR.
Vacated Before OCR Split Proposed Vacated After OCR Split
MPSS 7900
IPC 600
NAASW 4600
ASG 9700 OIR/OLDA Expansion ( ?
9700 Probably Less Than 9700
3. NBPO is prepared to lay out the new office assignments with the
re
ti
spec
ve offices upon approval of this concept.
NBPO Project Engineer
OL/NBPO: llSept86
Orig - File
1 - OL NBPO hrono
1 OL/FMD
1 DI/MPSS
Sanitized Copy Approved for Release 2011/05/11: CIA-RDP89-00244R001203050007-9