HEADQUARTERS EXPANSION BID PACKAGE 3SP SUPPLY CONTRACT - PUMPS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00244R000300150010-7
Release Decision: 
RIFPUB
Original Classification: 
K
Document Page Count: 
19
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 2, 2009
Sequence Number: 
10
Case Number: 
Publication Date: 
November 28, 1983
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP89-00244R000300150010-7.pdf516.48 KB
Body: 
Approved For Release 2009/04/02: CIA-RDP89-00244R000300150010-7 I I I crvL 1 ATE 11/28/33 TIME 17.929 HEADQUARTERS EXPAW Y TITLE PAGE 131D PACKAGE 3SP SUPPLY CONTRACT - PUMPS 7 2) 7 3) 7 4) BID PACKAGE 35P SUPPLY CONTRACT - PUMPS 9) HEADQUARTERS EXPANSION 1U) CENTERAL INTELLIGENCY AGENCY 11) WASHINGTON, D.C. 7 12) 7 13) 7 14) 7 15) 7 16) 7 17) 7 18) 7 19) 7 20) 7 21) 7 22) 7 23) 7 24) 7 25) 7 26) 7 27) 7 28) 29) SMITH, HINCHMAN & GRYLLS ASSOCIATES, INC. 30) ARCHITECTS - ENGINEERS - PLANNERS 31) 455 WEST FORT STREET 32) DETROIT. MICHIGAN 48226 7 33) PROJECT NO. 13155 BP-3SP 34) DECEM6ER 1, 1983 // eO Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 CENTRAL ItJTELL IGEI AGE:tCY F. C T IU:J UoU1 5 PAGE 1 .ATE 11/28/33 TIlE 17.929 LEADPJAR TEES EXPAW 071 LID PACKAGE 3SF TAJLE OF CONTENTS SUPPLY CONTRACT - PUMPS 7 1) DOCUMENT/ 2) SECTIO'J NO. 3) ----------- 4) 7 5) uIDDIt1G REJ'JIREMENTS 7 o) UJU10 TITLE PAGE 7) JJU15 TA3LE OF CONTENTS 7 3) - +SOLICITATION, OFFER. AND AWARD 9) (STANDARD FORM 33 - REV. 3-77) 7 19) 00033ATTA ATTACHMENT 'A' TO STANDARD FORM 33 11) (PUMPS) . 7 12) 00033N +MODIFICA'TIO(J TO STANDARD FORM 33 7 13) +SOLICITATION INSTRJCY1014S AND CO`JDITIUNS (STANJDARD FORM 33-A - REV. 1-73) FGEJERAL PROVISIONS (SUPPLY CONTRACT) (i TAADARD FORM 32 - REV. 4-75) +USA SUPPLE-MENTAL PROJI SIONS (35.4 FOEN 1424 - REJ. 9-78) 7 21) UU110 22) +:MJUIFICATIU'1 OF GSA SUPPLEMENTAL PR3VISI:):j3 SPECIAL CONDITIONS (SUPPLY CONTRACT) 7 23) OJ11CA APPENDIX 'A' - WARRANTY 7 24) SPECIFICATIONS 7 25) DIVISION .1 - GENERAL REQUIREMENTS 7 26) 01310 SCHEDULE AND TIME OF COMPLETION 7 27) 01340 SHJP DRAWINGS, PRODUCT DATA AND SAMPLES 7 28) 0134UA APPENDIX 'A' - GOVEkIL'IENT'S SUU.4ITTALS REVIEW STAMP 7 29) 01600 DELIVERY AND STORAGE 7 30) DIVISION 15 - MECHANICAL 7 31) 15610 CONDENSER WATER PUMPS 7 32) + - DOCUMENT TO HE INSERTED BY GSA. Approved For Release 2009/04/02: CIA-RDP89-00244R000300150010-7 CTION 00033ATTA PAGE 1 CENTRAL INTELLIGEN AGENCY WA TE 11/29/53 TIME 18.443 HEADQUARTERS EXPANS ON ATTACHMENT 'A' TO SF33 BID PACKAGE 3SP (PUMPS) SUPPLY CONTRACT - PUMPS T2 2) ATTACHMENT 'A' 3) TO SF33 4) (P MP ) U S 7 5) 7 6) CONTRACT GS-11C. ..................... 7 7) BIDDER'S NAME : .................................................. 7 8) 7 9) 1. BID PRICE FOR SEVEN CONDENSER WATER PUMPS. F.O.B. PROJECT SITE: 7 10) .......................... .................. DOLLARS 7 11) ($ ................................ 7 12) 2. DELIVERY SCHEDULE 7 13) IN ACCORDANCE WITH SECTION 01310. 7 14) 3. DATE BY WHICH 3IDDER MUST RECEIVE APPRUVEu SHOP DRAWINGS. 15) PRODUCT DATA AND RELATED SUBMITTALS IN Okutk TO MEET 16) SPECIFIED DELIVERY DATE: SHAG 13155 BP-3SP SECTION 00110 PAGE 1 Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 ATE 11 /29/83 11 ME 18.443 HEADQUARTERS EXPAF~N 5 SPECIAL CONDITIONS BID PACKAGE 3SP I (SUPPLY CONTRACT) SUPPLY CONTRACT - PUMPS ARTICLE INDEX 1. DEFINITIONS 2. NONPUBLICITY 3. BIDDING REQUIREMENTS 4. FOREIGN OWNERSHIP CONTROL OR INFLUENCE 5. ADMINISTRATION OF THE CONTRACT 6. LIQUIDATED DAMAGES 7. dARRANTIES AND GUARANTIES 8. LAWS, ORDINANCES AND REGULATIONS 9. PATENT INDEMNITY 10. INSURANCE 11. SUCCESSORS AND ASSIGNS 12. WRITTEN NOTICE 13. CLAIMS FOR DAMAGES 14. RIGHTS AND REMEDIES 15. ASSIGNMENT OF CONTRACT ***END OF INDEX 77 92 115 141 3 3) THE CONTRACT DOCUMENTS CONSIST OF Ink SUPPLY CONTRACT (BETWEEN THE 4) GOVERNMENT AND THE CONTRACTOR), THE CONDITIONS OF THE CONTRACT 5) (GENERAL AND SUPPLEMENTAL PROVISIONS, SPECIAL CONDITIONS, AND RELATED. 6) DOCUMENTS), THE DRAWINGS, THE SPECIFICATIONS, AND ALL ADDENDA ISSUED 7) PRIOR TO AND ALL CHANGES ISSUED AFTER EXECUTION OF THE CONTRACT. 8) CHANGES ARE DEFINED IN CLAUSE NO. 2 OF THE GENERAL PROVISIONS. 2 9) THE PROJECT 3 10) . THE PROJECT IS THE TOTAL CONSTRUCTION OF wHICH THE SUPPLIES FURNISHED 11) UNDER THE CONTRACT DOCUMENTS ARE A PART. 14) SMITH, HINCHMAN & GRYLLS ASSOCIATES. INC. 15) 455 WEST FORT STREET 16) DETROIT, MICHIGAN 48226 17) THE TERM "ARCHITECT" MEANS THE ARCHITECT OR HIS 'AUTHORIZED 18) REPRESENTATIVE. 19) THE CONTRACTOR 20) THE CONTRACTOR IS. THE INDIVIDUAL, PARTN[ksHIP, JOINT VENTURE, OR 21) CORPORATION NAMED IN THE SUPPLY CONTRACT, REFERRED TO FROM TIME TO 22) TIME, AS "SUPPLY CONTRACTOR'', FOR PURPOSES WF CLARIFICATION. 23) THE INSTALLING CONTRACTOR cPrTTnN nniin Dncc I SH&G 13155 6P-3SP Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 ENTRAL INTELLIGENCE AGENCY SPECIAL CONDITIONS . HEADQUARTERS EXPANSION (SUPPLY CONTRACT) BID PACKAGE 3SP SUPPLY CONTRACT -'PUMPS 3 24) THE INSTALLING CONTRACTOR IS THE ORGANILATZDh WHOSE CONTRACT WITH THE 25) GOVERNMENT FOR AORK ON THE PROJECT INCLUDES RESPONSIBILITY FOR 26) RECEIVING, TRANSPORTING AFTER RECEIPT, STORING AS APPROPRIATE AND 27) INSTALLING THE SUPPLIES. THE INSTALLING CONTRACTOR WILL BE THE 28) CONTRACTOR FOR BID PACKAGE 3 - POAERHOUSE, 3 30) BENEFICIAL ACCEPTANCE FOR ANY ITEM OF SUPPLIES IS THE DATE THE 31) GOVERNMENT PLACES THAT ITEM In USE FUR ITS INTENDED PURPOSE, 32) SUBSEQUENT TO ONSITE OPERATION FOR START-UP AHD TESTING. 2 33) MISCELLANEOUS DEFINITIONS 3 34) THE TERM "SUPPLIES" SHALL BE READ TO INCLUDE WITHOUT LIMITATION RAW 35) MATERIALS. COMPONENTS INTERMEDIATE ASSEMULIES AND END PRODUCTS TO BE 36) FURNISHED UNDER THE CONTRACT. (REFER. TO CLAUSE NO. 5 OF THE GENERAL 37) PROVISIONS). 3 38) THE TERM "PER" MEANS ''IN ACCORDANCE 41TH THE REQUIREMENTS OF". 3 39) THE TERM "AS APPROVED'' MEANS, "OR EQUAL" AS DESCRIBED IN ARTICLE 40) NO. 32 OF THE GSA SUPPLEMENTAL PROVISIONS. 1 41) 2. NONPUBLICITY 2 42) IT IS A SPECIFIC CONDITION OF THE CONTRACT THAT THE CONTRACTOR SHALL NOT 43) USE OR ALLOW TO BE USED ANY ASPECT OF ]HIS AGREEMENT FOR PUBLICITY OR 44) ADVERTISEMENT PURPOSES. 2 45) IT IS FURTHER UNDERSTOOD THAT THIS OBLIGATION SHALL NOT EXPIRE UPON 46) COMPLETION OR TERMINATION OF THE CONTRACT UUT WILL CONTINUE INDEFINITELY. 2 47) THE CONTRACTOR MAY REQUEST A WAIVER OR RELEASE FROM THE FOREGOING BUT 48) SHALL NOT DEVIATE THEREFROM UNLESS SO AUTHORIZED IN WRITING BY THE 49) GOVERNMENT. 3. BIDDING REQUIREMENTS 2 51) BIDDER SHALL ENTER IN SECTION 00033ATTA. "ATTACHMENT 'A' TO SF33 .52) (PUMPS)", ALL INFORMATION REQUESTED. REFER TO STANDARD FORM 33-A. 3 53) BID PRICE SHALL BE A LUMP SUM FOR DELIVERY OF THE SPECIFIED SUPPLIES 54) F.O.B. PROJECT SITE BY THE DATE SPECIFIED IN SECTION 01310. "SCHEDULE 55) AND TIME OF COMPLETION". 3 56) IN ESTABLISHING DATE BY WHICH BIDDEk MuST RECEIVE SHOP DRAWINGS. 57) PRODUCT DATA AND RELATED SUBMITTALS IN ORDER TO MEET THE SPECIFIED 58) DELIVERY DATE, BIDDER SHALL CONSIDER THE FACT THAT FOR EACH SUBMITTAL. 59) ARCHITECT WILL REQUIRE 14 CALENDAR DAYS FROM DATE SUBMITTAL ENTERS 60) ARCHITECT'S OFFICE UNTIL THE SUBMITTAL LEAVES TO RETURN TO THE 61) CONTRACTOR. 1 62) 4. FOREIGN OWNERSHIP CONTROL OR INFLUENCE 2 63) VENDORS RESPONDING TO THIS REQUEST FOR PRUPGSAL (RFP) ARE ADVISED THAT IT 64) 1S THE GOVERNMENT'S INTENT TO SECURE SERVICLS OR EQUIPMENT FROM FIRMS 65) WHICH ARE NOT UNDER FOREIGN OWNERSHIP, CONTROL, OR INFLUENCE (FOCI) OR 66) WHERE ANY FOCI MAY, IN THE OPINION OF THE GOVERNMENT ADVERSELY IMPACT ON 67) GOVERNMENT SECURITY REQUIREMENTS. ACCORDINGLY. ALL FIRMS RESPONDING TO 68) THIS RFP OR INITIATING PERFORMANCE OF A CONTRACT ARE REQUIRED 70 SUBMIT A 69) DOD FORM 441S (CERTIFICATE PERTAINING TG FOREIGN INTERESTS) WITH THEIR 70) PROPOSAL OR PRIOR TO CONTRACT PERFORMANCE (AS.APPROPRIATE). DOD FORM 441S 71) ENTRIES SHALL SPECIFY, WHERE NECESSARY, THE IDENTITY. NATURE, DEGREE, AND 72) IMPACT OF ANY FOCI ON THEIR ORGANIZATION UN ALTIVITIES. SH.G 13155 BP-3SP ? SCCTION 00110 PAGE 3 Approved For Release 2009/04/02: CIA-RDP89-00244R000300150010-7 'ATE 11 /29/83 TIME 18.443 AGE cern SN SPECIAL CONDITIONS 9ID PACKAGE 3SP (SUPPLY CONTRACT) SUPPLY CONTRACT - PUMPS 73) NOTWITHSTANDING THE LIMITATION ON CONTRACTINU w1TH A VENDOR UNDER FOCI 74) IDENTIFIED ABOVE. THE GOVERNMENT RESERVES THE RIGHT TO CONTRACT WITH SUCH 75) FIRMS UNDER APPROPRIATE ARRANGEMENTS. WHEN IT DETERMINES THAT SUCH 76) CONTRACTS WILL BE IN THE BEST INTEREST OF IHE GOVERNMENT. 3 79) THE CONTRACT WILL BE ADMINISTERED BY THE CONTRACTING OFFICER ON BEHALF 80) OF THE UNITED STATES OF AMERICA (REFERRED TO THROUGHOUT THE CONTRACT 81) DOCUMENTS AS THE GOVERNMENT). 2 82) THE ARCHITECT 3 83) THE ARCHITECT.. (AS REQUIRED BY SEPARATE CONTRACT) UNDER SUPERVISION OF 84) THE GOVERNMENT. WILL, AS PERTINENT TO THIS SUPPLY CONTRACT: 4 85) PROVIDE REVIEW AND APPROVAL OF ALL SHOP DRAWINGS. PRODUCT DATA. 86) SAMPLES. SCHEDULES. ETC., SUBMITTED SY THE CONTRACTOR. 87) REVIEW AND CERTIFY THE VALIDITY OF THE CONTRACTOR'S APPLICATIONS 88) FOR PAYMENT. 3 90) THE CONTRACTOR SHALL FORWARD ALL COMMUNICATIONS TO THE ARCHITECT 91) THROUGH THE CONTRACTING OFFICER. 2 93) REFER TO ARTICLE 11 - DEFAULT, OF THE GENERAL PROVISIONS. REDESIGNATE 94) PARAGRAPHS 11(F) AND 11(G) THERIN AS 11(o).Auo 11(H) RESPECTIVELY. AND .95) INSERT THE FOLLOWING: 7 96) (F) (I) IN THE EVENT THE GOVERNMENT EXERCISES ITS RIGHT OF 97) TERMINATION AS PROVIDED IN PAkAGAAPH (A) ABOVE. THE 98) CONTRACTOR SHALL BE LIABLE TO THE GOVERNMENT. FOR EXCESS 99) COSTS AS PROVIDED IN PARAGRAPH (e) ABOVE AND, IN ADDI- 100) TION, FOR LIQUIDATED DAMAGES, IN THE AMOUNT OF 101) $500.00 AS FIXED, AGREED. AND LIQUIDATED DAMAGES 102) FOR EACH CALENDAR DAY OF DELAY. UNTIL SUCH TIME AS THE 103) GOVERNMENT MAY REASONABLY OBTAIN DELIVERY OF SIMILAR 104) SUPPLIES OR PERFORMANCE OF SIMILAR SERVICES. 7 105) (II) IF THE CONTRACT IS NOT SO TEHMINAIED. NOTWITHSTANDING 106) DELAY, AS PROVIDED IN PARAGRAPH (A) ABOVE, THE CONTRACT- 107) OR SHALL CONTINUE PERFORMANCE AND dE LIABLE TO THE 108) GOVERNMENT FOR SUCH LIQUIDATED DAMAGES FOR EACH CALENDAR 109) DAY OF DELAY UNTIL THE SUPPLIES ARE DELIVERED OR SER- 110) VICES PERFORMED. 7 111) (III) THE CONTRACTOR SHALL NOT BE LIABLE FOR LIQUIDATED 112) DAMAGES FOR DELAYS DUE TO CAUSES WHICH WOULD RELIEVE 113) HIM FROM LIABILITY FOR EXCESS COSTS AS PROVIDED IN PARA- 114) GRAPH (C) OF THIS CLAUSE. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 SH&G 13155 8P-3sP SPCTION 00110 PAW 4 COAL INTELLIGENCE AGENCY DATE 11/29/83 TIME 1 443 HEADQUARTERS EXPANSION SPECIAL CONDITIONS BID PACKAGE 35P (SUPPLY CONTRACT) SUPPLY CONTRACT - PUMPS 2 116) WARRANTY 3 117) THE CONTRACTOR WARRANTS TO THE GOVERNMENT THAT ALL SUPPLIES FURNISHED 113) UNDER THIS CONTRACT WILL HE NEW UNLESS OTHERWISE SPECIFIED, AND THAT FECTS 119) ALL WORK WILL BE OF GOOD QUALITY, FREE FRUH FAULTS ANDD ECONFORMING TO 120) CONFORMANCE WITH THE CONTRACT DOCUMENTS. ALL WORK NOT 121) THESE REQUIREMENTS. INCLUDING SUBSTITUTIONS NUT PROPERLY APPROVED AND 122) AUTHORIZED, MAY BE CONSIDERED DEFECTIVE. IF REQUIRED BY THE CONTRACT 123) DOCUMENTS OR THE CONTRACTING OFFICER. Tht CONTRACTOR SHALL FURNISH 124) SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF SUPPLIES 125) FURNISHED, THIS WARRANTY IS NOT LIMITED BY THE PROVISIONS FOR 126) CORRECTION OF DEFECTIVE OR NONCONFORMING WUkc HEREIN. 2 127) CORRECTION OF DEFECTS 3 128) IF, WITHIN ONE YEAR AFTER BENEFICIAL ACCEPTANCE. BY THE OWNER OF 129) DESIGNATED SUPPLIES OR WITHIN SUCH LONGER PERIOD OF TIME AS MAY BE 130) PRESCRIBED BY LAW OR BY THE TERMS OF ANY APPLICABLE SPECIAL WARRANTY 131) REQUIRED BY THE CONTRACT DOCUMENTS, ANY SUPPLIES ARE FOUND TO BE 132) DEFECTIVE OR NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE 133) CONTRACTOR SHALL MAKE CORRECTION PROMPTLY AFTER RECEIPT OF A WRITTEN 134) NOTICE FROM THE GOVERNMENT TO DO SO. UNLESS IN THE PUBLIC INTEREST THE A A 135) GOVERNMENT CONSENTS TO ACCEPT SUCHS SOOPLIES WW ITH S ANL APPROPRIATE 136) ADJUSTMENT IN CONTRACT PRICE. 137) TERMINATION OF THE CONTRACT. 2 138) PRIOR TO FINAL PAYMENT. SUBMIT TO THE CONTRACT1NG OFFICER A WARRANTY FOR FURNISHED. THE 00110A, ' 'APPENDIXY 'ASHALL UE IN ' - W ARRANIYR'PLICATE IN THE FORM 139) THE 140) SHOWSNUPPLIES 8. LA+S. ORDINANCES AND REGULATIONS 1 141) 2 142) THE CONTRACTOR SHALL COMPLY WITH ALL APPLICAOLE FEDERAL, STATE AND LOCAL 143) LAWS, ORDINANCES. AND REGULATIONS. AND SHALL REQUIRE SUCH COMPLIANCE, BY 144) ALL OTHER PERSONS WITH WHOM HE SHALL ENTER 1NTU ANY CONTRACT PERTAINING 145) TO THE WORK. THE CONTRACTOR SHALL BE LIABLE FUR AND INDEMNIFY AND HOLD 146) HARMLESS THE GOVERNMENT, AND THE ARCHITECT AND THEIR RESPECTIVE 147) CONSULTANTS. AGENTS AND EMPLOYEES FROM ANY AND ALL LIABILITY OR DAMAGE 146) ARISING BY REASON OF THE BREACH OF THE PROVISIONS HEREIN SET FORTH. 2 149) IT IS NOT THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE CERTAIN THAT THE 150) CONTRACT DOCUMENTS ARE IN ACCORDANCE WITH APPLICABLE LAWS, ORDINANCES AND 151) REGULATIONS. HOWEVER, IF THE CONTRACTOR OoSERVCS THAT ANY OF THE CONTRACT 152) DOCUMENTS ARE AT VARIANCE THEREWITH IN ANY RESPECT. HE SHALL PROMPTLY 153) NOTIFY THE CONTRACTING OFFICER AND ANY NECESSARY CHANGES SHALL BE 154) ACCOMPLISHED BY APPROPRIATE CHANGE ORDER. 2 155) IF THE CONTRACTOR PERFORMS ANY WORK KNOWING IT TO BE CONTRARY TO SUCH 156) LAWS. ORDINANCES. AND REGULATIONS. AND WITHOUT SUCH NOTICE TO THE 157) CONTRACTING OFFICER. HE SHALL ASSUME FULL RESPONSIBILITY THEREFOR AND 158) SHALL BEAR ALL COSTS ATTRIBUTABLE THERETO. 9. PATENT INDEMNITY 1 159) 2 160) REFER TO CLAUSE NO. 39 OF THE SUPPLEMENTAL PROVISIONS. EDIT INTERNALLY AS 161) FOLLOWS: 3 162) FOLLOWING THE WORD . "EMPLOYEES" IN THE FIRST SENTENCE. INSERT THE 163) PHRASE ''AND THE ARCHITECT. AND HIS CONSULTANTS. AGENTS AND 154) EMPLOYEES''. SH&G 13155 BP-35P SLCTION U011U PAUL ) Approved For Release 2009/04/02:CIA-RDP89-00244R000300150010-7 ATE 11/29/83 TIME 18.443 ftMUUUARICHS tXPAN?N SPECIAL CONDITIONS BID PACKAGE 3SP (SUPPLY CONTRACT) SUPPLY CONTRACT - PUMPS 3 167) THE CONTRACTOR SHALL PURCHASE AND MAINTAIN PROPERTY INSURANCE FOR THE 168) FULL-CONTRACT VALUE THEREOF UPON SUPPLIES FuH WHICH ANY PAYMENT HAS 169) BEEN MADE AND SUPPLIES WHICH HAVE bEEN DELAYED IN SHIPMENT AT THE 170) GOVERNMENT'S REQUEST. 3 171) THE CONTRACTOR SHALL FILE TWO CERTIFIED CuPIES OF ALL POLICIES WITH 172) THE CONTRACTING OFFICER BEFORE EXPOSURE TO LOSS CAN OCCUR. IF THE 173) GOVERNMENT IS DAMAGED BY THE FAILURE OF THE CONTRACTOR TO MAINTAIN 174) SUCH INSURANCE AND TO SO NOTIFY THE CONTRACTING OFFICER, THEN THE 175) CONTRACTOR SHALL BEAR ALL REASONAULE COSTS PROPERLY ATTRIBUTABLE 176) THERETO. 3 178) THE CONTRACTOR SHALL PURCHASE AND MAINTAIN DURING SHIPMENT TRANSIT 179) INSURANCE FOR THE FULL CONTRACT VALUE THEREOF UPON SUPPLIES FOR WHICH 180) ANY PAYMENT HAS BEEN MADE. 1 181) 11. SUCCESSORS AND ASSIGNS 2 182) THE GOVERNMENT AND THE CONTRACTOR EACH BINDS ITSELF, ITS PARTNERS, 183) SUCCESORS, ASSIGNS AND LEGAL REPRESENTATIVES TO THE OTHER PARTY HERETO 184) AND TO THE PARTNERS, SUCCESSORS, ASSIGNS AND LEGAL REPRESENTATIVES OF 185) SUCH OTHER PARTY IN RESPECT TO ALL COVENANTS, AGREEMENTS AND OBLIGATIONS 186) CONTAINED IN THE CONTRACT DOCUMENTS. NEITHER PARTY TO THE CONTRACT SHALL 187) ASSIGN THE CONTRACT OR SUBLET IT AS A WHOLE w11HJUT THE WRITTEN CONSENT 188) OF THE OTHER. 1 189) 12. WRITTEN NOTICE 2 190) WRITTEN NOTICE SHALL BE DEEMED TO HAVE CEEN DULY SERVED IF DELIVERED IN 191) PERSON TO THE INDIVIDUAL OR MEMBER OF THE FIRM OR ENTITY OR TO AN OFFICER 192) OF THE CORPORATION FOR WHOM IT WAS INTENDED, OR IF DELIVERED AT OR SENT 193) BY REGISTERED OR CERTIFIED MAIL TO THE LAST SuSINESS ADDRESS KNOWN TO HIM 194) WHO GIVES THE NOTICE. 1 195) 13. CLAIMS FOR DAMAGES 2 196) SHOULD EITHER PARTY TO THE CONTRACT SUFFEk INJURY OR DAMAGE TO PERSON OR 197) PROPERTY BECAUSE OF ANY ACT OR OMISSION OF THE OTHER PARTY OR OF ANY OF 198) HIS EMPLOYEES, AGENTS OR OTHERS FOR WHOSE ACTS HE IS LEGALLY LIABLE. 199) CLAIM SHALL BE MADE IN WRITING TO SUCH OTHER PARTY WITHIN A REASONABLE 200) TIME AFTER THE FIRST OBSERVANCE OF SUCH INJURY OR DAMAGE. 1 201) 14. RIGHTS AND REMEDIES 2 202) THE DUTIES AND OBLIGATIONS IMPOSED BY THE CONTRACT DOCUMENTS AND THE 203) RIGHT'S AND REMEDIES AVAILABLE THEREUNDER SHALL E IN ADDITION TO AND NOT 204) A LIMITATION OF ANY DUTIES, OBLIGATIONS, RIGHTS AND REMEDIES OTHERWISE 205) IMPOSED OR AVILABLE BY LAW. 2 206) NO ACTION OR FAILURE TO ACT BY THE CONTRAC1INU OFFICER, ARCHITECT OR 207) CONTRACTOR SHALL CONSTITUTE A WAIVER OF ANY RIuHI OR DUTY AFFORDED ANY OF 2U8) THEM UNDER THE CONTRACT, NOR SHALL ANY SuCh ACTION OR FAILURE TO ACT 209)- CONSTITUTE AN APPROVAL OF OR ACQUIESCENCE IN ANY BREACH THEREUNDER, 210) EXCEPT AS MAY BE SPECIFICALLY AGREED-IN WHITINU. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 SH&G 13155 bP-3SP PA ,. 6 LeRAL INTELLIGENCE AGENCY SECTION 60110 DATE 11/79/83 TIME 443 HEADaUARTERS EXPANSION BID PACKAGE 35P SPECIAL CONDITIONS SUPPLY CONTRACT - PUMPS (SUPPLY CONTRACT) 15. ASSIGNMENT OF CONTRACT 1 211) RIGHT TO ASSIGN THIS 212) THE GOVERNMENT RESERVES AND IS HEREBY OH Ahi THE 213) CONTRACT TO THE INSTALLING CONTRACTOR AND ,pAnc IT A PART OF THE CONTRACT 2 AGREES THAT, wHEN SUCH BID PACKAGE 3. THE SUPPLY CONTR4CTUR 215) ASSIGNMENT IS MADE, HE WILL WORK UNDER R THC INSIALLING CONTRACTOR IN THE 216) SAME MANNER AS HE WOULD HAD THE CONTRACT EEN ORIGINALLYT AAWARDEED TO HH IM 217) BY THE INSTALLING CONTRACTOR, AND THAT HE LILL I of BOUND 218) TOWARD THE INSTALLING CONTRACTOR ALL THE UIUAIION$ AND RESPONSIBILITIES BY HIS CONTRACT, ASSUMES TUwARD THE GOVERNMENT. IN CASE OF 219) THAT HE, PAYMENTS TO THE SUPPLY CONTRACTOR ILL BE BY THE INSTALLING 220) ASSIGNMENT, 221) CONTRACTOR. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 ION 00110A PAGE 1 CENTRAL INTELLIGENCE CY D - 11/14/83 TIME 19.368 ? HEADQUARTERS EXPANSIO APPENDIX 'A' - WARRANTY BID PACKAGE 3SP SUPPLY CONTRACT - PUMPS 2) WARRANTY 3) 4) PROJECT TITLE AND LOCATION 5) ................................ ................................ ................................ 8) ARCHITECT PROJECT NUMBER/ 9) CONTRACT IDENTIFIER 10) CONTRACTOR PROJECT NUMBER 11) WARRANTED SUPPLIES 12) 13) SPECIFICATION SECTION AND 14) LINE NUMBER REFERENCE 15) LENGTH OF WARRANTY (YEARS) 16) CONTRACTOR 17) SUBCONTRACTOR ................................ ................................ ................................ ................................ ................................ ................................ ................................ ................................ 18) THE UNDERSIGNED HEREWITH WARRANT THAT THE ABOVE SUPPLIES HAVE BEEN 19) MANUFACTURED IN CONFORMANCE WITH THE REQUIREMENTS OF THE CONTRACT 20) DOCUMENTS FOR THE PROJECT/CONTRACT NAMED AND WARRANT SAID SUPPLIES TO 21) PERFORM WITHOUT FAILURE AS SPECIFIED FOR THE ABOVE STATED PERIOD OF TIME 22) STARTING ON ........... 198...... AND ENDING ON ........... 198 ..... 23) THIS WARRANTY DOES NOT APPLY TO FAILURE TO PERFORM DUE TO ABUSE OR 24) NEGLECT BY THE GOVERNMENT OR OTHERS OR DAMAGE BY VANDALISM. ..................................................... ..................................................... ..................................................... ..................................................... 27) 28) TITLE 29) NOTARY 3U) DATE 7 34) TITLE 7 35) NOTARY 7 36) DATE ..................................................... ..................................................... ..................................................... ..................................................... .................... Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 TIDN 01310 PAGE 1 . Sr1 G 13155 bp- CENTRAL INTELL IGENCE~TGENCY WE 11123183 TIRE 17.429 HEADGUARTERS ExPANSION SCHEDULE .AND TIME DF COM'LETION BID PACKAGE 3SP SUPPLY CONTRACT - PUMPS ARTICLE SCHEDULE ..*END OF INDEX 1 3) 2 4) MILESTONE DATES. 7 5) INVITATION FOR BIDS FEBRUARY 1. 1984. MARCH 1, 1)34 7 6) BID OPENING . 7 7) CONTRACT AWARD APRIL 1. 1934. 7 8) NOTICE TO PROCEED APRIL 1, 1934. 7 9) DELIVERY OF SEVEN PUMPS NOVEMBER 1. 1954. 7 13) TENTATIVE BENEFICIAL 11) ACCEPTANCE OF THE 12) SEVEN PUMPS Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 ECTION 01340 PAGE 1 CENTRAL INT ELL IGENAGENCY TE 11/23/83 TIME 17.924 HEADQUARTERS EXPAAS ON HOP DRAWINGS, PRODUCT DATA BID PACKAGE 3SP AND SAMPLES SUPPLY CONTRACT - PUMPS ARTICLE INDEX 1. GENERAL 2. DESCRIPTIONS AND SUBMITTALS 3. raAJSMITTAL AND APPROVAL ... END OF INDEX 2 2) REFER TO SECTION 01340A, "APPENDIX 'A' - GOVERNMENT'S REVIEW STAMP-1. 3) WITH FIRST 5UBM15SI34 OF SHOP DRAWINGS. ETC.. FURNISH TO CONTRACTING 4) OFFICER FOUR RUBBER STAMPS IN THE FORM SHOWN IN APPENDIX 'A'. FAILURE TO 5) FURNISH THESE STAMPS MAY BE CAUSE FOR REJECTION OF THE SUBMITTED 6) MATERIAL. 2 7) SCHEDULE SHOP DRAWING, PRODUCT DATA AND SAMPLE SUJMITTALS FOR 8) INTER-RELATED ITEMS AT THE SAME TIME. 2 9) SHOP DRAWINGS SUBMITTED WHICH ARE NOT REQUIRED BY THE SPECIFICATIONS OR 10) THE CONTRACTING OFFICER WILL BERETURNED WITH NO COMMENT. 1 11) 2. DESCRIPTIONS AND SUBMITTALS 2 12) MODEL NUMBERS, RATINGS, PERFORMANCE CHARACTERISTICS AND OTHER PERTINENT 13) DATA SHALL SE CLEARLY MARKED AND IDENTIFIED ON SUHM ITTALS. IN FOR Fi6T I ON 14) PERTAINING TO SEVERAL SIZES OR GRADES OF ONE CLASSIFICATION OF SJPPLIES 15) OR TO SEVERAL COMPONENTS OF A SPECIFIC SYSTEM, SHALL HE BOUND TOGETHER 16) AND CLEARLY IDENTIFIED. EQUIPMENT OR PRODUCT, SHALL BE BOUND TOGETiER AND 17) CLEARLY IDENTIFIED. WHERE PRINTED MATERIALS DESCRIDE MORE THAN ONE 18) PRODUCT OR MODEL, CLEARLY IDENTIFY WHICH IS TO GE FURNISHED. 3 20) 21) 22) 23) 3 24) 25) 26) SHOP DRAWINGS ARE DRAWINGS, DIAGRAMS, SCHEDULES AND OTHER DATA SPECIALLY PREPARED FOR THE WORK BY THE CONTRACTOR OR ANY SUBCONTRACTOR, MANUFACTURER, SUPPLIER OR DISTRIBUTOR TO ILLUSTRATE SOME PORTION OF THE WORK. SUBMIT SHOP DRAWINGS IN THE FORM OF ONE REPRODUCIBLE TRANSPARENCY AND TWO COPIES (PRINTED FROM THE TRANSPARENCY). DO NOT SEND MORE THAN THE SPECIFIED NUMBER OF COPIES. ADDITIONAL COPIES WILL BE DISCARDED. 4 27) TRANSPARENCIES SHALL HAVE AN UNOBSTRUCTED SPACE AT THE RIGHT SIDE 28) OR BOTTOM OF SIZE NOT LESS THAN 6 INCHES BY d INCHES FOR APPROVAL 29) STAMPS AND DOCUMENT CONTROL NUMBERING. 4 3U) TRANSPARENCIES OF THE SAME ITEM OR SYSTEM SHALL BE OF UNIFORM SIZE 31) AND BE NUMBERED CONSECUTIVELY. 2 32) PRODUCT DATA 3 33) PRODUCT DATA ARE ILLUSTRATIONS, STANDARD SCHEDULES. PERFORMANCE CHARTS 34) AND TEST DATA. INSTRUCTIONS, BROCHURES. DIAGRAMS AND OTHER INFORMATION 35) FURNISHED BY THE CONTRACTOR TO ILLUSTRATE AN I T E hI OR ELEMENT OF 36) MATERIAL. EQUIPMENT OR SYSTEM FOR SUM PORTION OF THE WORK. 3 37) SUBMIT PRODUCT DATA (GENERALLY 3-1/2 BY 11 INCH SIZE) IN TIE FORM OF 3d) THREE, CLEAR, TOTALLY REPRODUCIBLE COPIES MADE JY REPRODUCTIVE MEANS 39) ON 8-1/2 BY 14 INCH (LEGAL SIZE) PAPER. THE 3 BY 8-1/2 INCH SPACE 40) RESULTING FROM THE USE OF LEGAL SIZE PAPER SHALL HE LEFT UN03STRUCTED 41) FOR PPP;~VAL STAMPS AND NOTATIONS. 3 42) PRODUCT DATA THAT CANNOT BE SUUMITTED IN REPRODUCIBLE FORM, SUCH AS. 43) PAINT COLOR CARDS, SHALL BE SUBMITTED IN FIVE COPIES. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 SHSG 13155 BP-3SP SE?C T ION 01340 PA( CEWAL INTELLIGENCE AGENCY DATE 11/28/53 TIRE 1 29 HEADQUARTERS EXPANSION SHOP DRAWINGS, PRODUCT DATA BID PACKAGE 3SP AND SAMPLES SUPPLY CONTRACT - PUMPS 2 44) SAMPLES 3 45) SAMPLES ARE PHYSICAL EXAMPLES WHICH ILLUSTRATE MATERIALS, EQUIPMENT OR 46) WORKMANSHIP AND ESTABLISH STANDARDS 3Y WHICH THE WORK WILL BE JJDGED. 3 47) SUBMIT SAMPLES IN TRIPLICATE UNLESS DIFFERENT NUMBER IS SPECIFIED, 48) TRANSPORTATION CHARGES PREPAID. WITH IDENTIFYING LAB EL FIRMLY 49) ATTACHED. 4 5U) LABELS SHALL BE OF A SIZE TO RECEIVE APPROVAL STAMPS AND NOTATIONS. 51) IN ADDITION TO THE IDENTIFYING INFORMATION SPECIFIED BELOW. 2 52) TITLE ULOCK 3 53) IN ADDITION TO CO'ITRACTOR'S, SUUCONTRACTOR'S AND MANUFACTURER'S OR 54) SUPPLIER'S IDENTIFYING AND APPROVAL INDICATIONS, SHOP DRAWINGS. 55) PRODUCT DATA AND LA3ELS FOR SAMPLES SHALL HAVE IDENTIFYING TITLE 56) BLOCKS. TITLE BLOCKS SHALL CONTAIN: 4 57) PROJECT TITLE. 4 56) NAME OF CONTRACT. 4 59) GOVERNMENT'S CONTRACT NUMBER. 4 60) ARCHITECT'S NA 4E AND PROJECT NUMBER INCLUDING CONTRACT IDENTIFIER. 4 61) ADDRESS (SECTION AND LINE NUMBERS) IN THE SPECIFICATION SECTION OF 62) THE REQUIRED SUBMITTAL. 4 63) DATE OF INITIAL SUBMITTAL. 4 64) CONTROL NUMBER. 2 65) NOTE: 3 66) SHOP DRAWINGS NOT SUBMITTED IN THE FORM, OF REPRODUCIBLE TRA'1SPARENC IES 67) WILL NOT BE ACCEPTED FOR REVIEW. 3 68) PRODUCT DATA NOT SUBMITTED IN THE FORM OF REPROD-JCI3LE COPIES WILL NOT 69) BE ACCEPTED FOR REVIEW, EXCEPT PRODUCT DATA SPECIFICALLY EXEMPTED FROM 70) THE REPRODUCIULE COPIES REQUIREMENT. 3 71) SHOP DRAWINGS. PRODUCT DATA AND SAMPLES NOT BEARING THE CONTRACTOR'S 72) STAMP OF APPROVAL WILL NOT BE ACCEPTED FOR REVIEW. 3 73) SHOP DRAWINGS, PRODUCT DATA AND SAMPLES SUBMITTED WITHOUT SPECIFIED 74) SPACE FOR APPROVAL STAMPS WILL NOT BE ACCEPTED FOR REVIEW. 3 75) SAMPLES WHICH ARRIVE WITHOUT THE TRA.'JSPORTATION CHARGES PREPAID WILL 76) NOT BE ACCEPTED FOR REVIEW. 3 77) THE FIRST TWO SU3i41TTALS Of EACH SHOP DRAWING OR PRODUCT DATA JILL BE 78) PROCESSED WITHOUT COST TO THE CONTRACTOR. BEGI'4NING WITH THE THIRD 79) SUBMITTAL THE GOVERNi?1ENT MAY CHARGE THE CONTRACTOR FOR THE COST OF 80) SUCH SU-SEU'UENT PROCESSING OF SHOP DRAWINGS AND PRODUCT DATA UNLESS AN 81) APPROVED CHANGE ORDER IS ISSUED AFFECTING THE SHOP DRAWINGS AND 82) PRODUCT DATA. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 TION 01340 PAGE 3 .C ENTRAL INTELLIGENCE EN CY 11/28/83 TIME 17.929 HEADQUARTERS EXPANSLV WP DRAWINGS, PRODUCT DATA dID PACKAGE SSP AND SAMPLES SUPPLY CONTRACT - PUMPS 1 83) Z 84) TRANSIq ITTAL 3 85) TRANSMIT SHOP DRAWINGS. PRODUCT DATA AND SAMPLES US17G TRANSH I TTAL 86) FORMS FURNISHED 9Y THE (,CVE RNFIENT. F ILL OUT TRANSMITTAL FORM. 4 87) INCOMPLETE OR ERRONEOUS TRANSMITTALS WILL BE RETURNED WI THOUI 88) ACTION. 4 89) PORTIONS OF TRANSMITTAL FORM WILL BE COMPLETED BY THE GOVERNMENT. 3 90) RESUBMITTAL PROCEDURE SHALL FOLLOW SAME PROCEDURE AS THE INITIAL 91) SUBMITTAL. 2 92) APPROVAL 3 93) GOVERNMENT'S STAMP ON CONTRACTOR'S SUBMITTAL CHECKED "APPROVED" 94) (CODE NO. 1). OR ' 'APPROVED AS NOTED" (CODE NO. 2). APPROVAL DOES NOT 95) AUTHORIZE CHANGES TO CONTRACT SUM U'1LESS STATED IN SEPARATE LETTER OR 96) CHANGE ORDER. 3 97) UPON RECEIPT OF "APPROVED" OR "APPROVED AS NOTED'' SUBMITTALS. MAKE 98) NECESSARY COPIES FOR DISTRI9UIIUN TO PARTIES REQUIRING THE APPROVED 99) INFORMATION. 2 100) DISAPPROVAL. 3 101) GOVERNMENT'S STA:AP CHECKED 'REVISE AND RESU3M1 T'' (CODE NO. 3), OR 102) "NOT APPROVED" (CODE NO. 4). RESUBMIT CORRECTED COPIES FOR FINAL 103) APPROVAL. CORRECTION SHALL BE LIMITED TO ITEMS MARKED. 3 104) THE DISAPPROVAL OF SHOP DRAWINGS. PRODUCT DATA AND SAMPLES OR DELAY IN 105) SUBMITTING OR RESUBMITTING SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 100) SHALL NOT BE DEEMED CAUSE FOR AN EXTENSION OF TIME. 107) THE GOVERNMENT MAY HOLD SHOP DRAWINGS. PRODUCT DATA AND SAMPLES IN CASES 108) WHERE PARTIAL SUBMITTAL CANNOT HE REVIEWED UNTIL THE COMPLETE SU3MITTAL 109) HAS BEEN RECEIVED OR WHERE SUCH SUBMITTAL CANNOT BE REVIEWED UNTIL 110) ASSOCIATED ITEMS HAVE BEEN RECEIVED. WHEN SUCH SUO:?IITTALS ARE HELD BY THE 111) GOVERNMENT, IT WILL SO ADVISE THE CONTRACTOR IN WRITING. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 ? S Section 01340A - Appendix 'A' Government's Submittals Review Stamp Date Received Document Control No. General Services Administration Smith, Hinchman & Grylls Associates, Inc. Architects Engineers Planners Reviewing is only for conformance with the design concept of the work and compliance with the information given in the Contract Documents. The Contractor is responsible for dimensions to be confirmed and correlated at the site; for information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences and pro- cedures of construction; and for coordination of the work of all trades. Highest Number Prevails Code Approved 1 Approved as Noted 2 Revise and Resubmit 3 Not Approved - Resubmit 4 Dept. Chkd.By Date Code Arch. Struct. Mech. Elect. Civil Security '9N 016UU PAUL I Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 10/27/83 TIME 17.737 CENTRAL INTELLIGENCE AWY - DELIVERY AND STORAGE HEADQUARTERS EXPANSION BID PACKAGE 3SP SUPPLY CONTRACT - PUMPS ARTICLE 1. DELIVERY 2. UNLOADING AND POSSESSION ***END OF INDEX 1 1) 2 2) ALL DELIVERIES TO THE PROJECT FOR ALL CONTRACTS WILL BE ACCORDING TO 3) PRECISE SCHEDULES. 2 4) PLAN AND EXECUTE DELIVERIES OF THE SUPPLIES ACCORDING TO THE SCHEDULE 5) WORKED OUT WITH THE INSTALLING CONTRACTOR. 2. UNLOADING AND POSSESSION 1 b) 2 7) CONTRACTOR'S AUTHORIZED REPRESENTATIVE SHALL BE PRESENT AT ALL TIMES OF 8) ARRIVAL OF THE SUPPLIES AT THE PROJECT SITE, SHALL OBSERVE THE WORK OF 9) UNLOADING, AND SHALL CERTIFY TO THE CONTRACTING OFFICER, IN WRITING, THAT 10) THE SUPPLIES WERE UNLOADED WITHOUT DAMAGE, IF SUCH IS TRUE. TO MAKE 2 111) POSSESSION 2) INSTALLING CONTRACTOR U ATL MOMENT H WHEN INSTALLING CONTRACTOR CONTRACTOR 13) ATTACHMENTS FOR UNLOADING. 2 14) POSSESSION BY INSTALLING CONTRACTOR SHALL IN NO WAY DIMINISH THE SUPPLY 15) CONTRACTOR'S RESPONSIBILITY FOR PROPER PERFORMANCE OF THE SUPPLIES IN THE 16) ABSENCE OF DAMAGE CAUSED BY INSTALLING CONTRACTOR'S OPERATIONS. o_xco SECTION 1561C PAGE 1 Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 11 /29/83 TIME 18.443 HEADUUARTERS EXPANSION CONDENSER WATER PUMPS BID PACKAGE 3SP SUPPLY CONTRACT - PUMPS INDEX LINE ARTICLE CONDENSER WATER PUMPS 1 ?**END OF INDEX 1 1) 2 2) GENERAL 3 3) FURNISH A TOTAL OF SEVEN (7) CONDENSER ,.ATER PUMPS. 3 4) PUMPS SHALL HAVE THE CAPACITIES AND CHARACTERISTICS AS HEREINAFTER 5) SPECIFIED. 3 6) PUMP NAMEPLATES SHALL CONTAIN THE GPM AND HEAD AT THE SELECTION POINT. 7) SINCE PUMP NAMEPLATE IS TO BE COVERED nY FIXED INSULATION, THE GPM AND 8) HEAD AT THE SELECTION POINT SHALL ALSO BE INCLUDED IN THE MOTOR 9) NAMEPLATE DATA. 3 10) FURNISH CERTIFIED PUMP CHARACTERISTIC CUkvES WITH THE PUMPS SHOWING 11) CAPACITIES, HEADS, EFFICIENCIES AND BRAKE HORSEPOWER THROUGHOUT THE 12) ENTIRE RANGE OF THE PUMPS WHEN OPERATING SINULY AND THRU THE RANGE OF 13) THE ENTIRE SEVEN PUMPS OPERATING IN PARALLEL. 3 14) PUMPS SHALL BE SELECTED TO PERFORM THE SPECIFIC DUTY FOR WHICH THEY 15) ARE INTENDED. 3 16) THE RATIO OF THE MAXIMUM PUMP IMPELLER ulAnETER TO THE SELECTED PUMP 17) IMPELLER DIAMETER SHALL BE 1.15 OR GREATER. 3 18) PUMPS SHALL BE CHECKED FOR LUBRICATION.. ALLIGNMENT AND OPERATING 19) CONDITIONS BY A FACTORY REPRESENTAT,VE AFTER PUMPS HAVE BEEN SET. 20.) LEVELLED, GROUTED, CONNECTED TO PIPING. AND SYSTEM FILLED READY TO 21) OPERATE. 3 22) PUMPS SHALL BE SELECTED TO OPERATE wlTHIN TWO PERCENTAGE POINTS OF 23) MAXIMUM EFFICIENCY ON THE IMPELLER CURVE SELECTED AND HAVE A MAXIMUM 24) SUCTION VELOCITY OF EIGHT FEET PER SECGNG. 3 25) NO POINT ON THE HEAD-CAPACITY CURVE SHALL EXCEED THE MOTOR HCRSEPOWER 26) SELECTED TO DRIVE THE PUMP. 3 27) MOTOR HORSEPOWER AT THE SELECTION POINT SHALL NOT EXCEED 95 PERCENT OF 28) THE RATED MOTOR HORSEPOWER. 3 29) PUMPS SHALL BE DOUBLE SUCTION SPLIT CASL TYPE. MOTOR DRIVEN THRU A 30) FLEXIBLE COUPLING, MOUNTED ON A COMMO4 ENCLOSED CAST IRON OR STEEL 31) BASE SUITABLE FOR AND WITH ADEQUATE PRUvIS10NS FOR GROUTING. 3 32) PUMP CASINGS SHALL BE CLOSE GRAINED CAST IkON SUITABLE FOR 175 LB. 33) WORKING PRESSURE WITH 125 LB. ANSI FLANUES. 3 34) THE PUMP VOLUTE SHALL BE SUPPLIED WITn PLUGGED VENT, DRAIN AND GAGE 35) TAPPINGS. 3 36) PUMP SHAFTS SHALL BE OF STAINLESS STEEL. 3 37) BEARINGS SHALL BE REGREASABLE BALL TYPE. 3 38) IMPELLERS SHALL BE BRONZE. ENCLOSED DC.UtlLE SUCTION TYPE, KEYED TO 39) SHAFT AND DYNAMICALLY BALANCED FOR QUIET UPEkATIGN. 3 40) PUMPS SHALL BE EQUIPPED WITH PACKED STUFFII.u BOX CONSTRUCTION WITH A 41) MINIMUM OF 4 RINGS OF PACKING PLUS AN EXTERNALLY SUPPLIED FLUSH RING 42) TO PROVIDE PROPER FLUSH LUBRICATION. PUMPS SHALL BE EQUIPPED WITH 43) SUITABLE DRIP PAN WITH TAPPED CONNECTION ALD PIPING TO DRAIN. - SH&G 13155 BP-3SP Approved For Release 2009/04/02 : CIA-RDP89-00244R0003001500107 L INTELLIGENCE AGENCY DARE IIIGY/O1 .I'll CONDENSER WATER PUMPS S EAD(JUARTERS EXPANSION BID PACKAGE 3SF SUPPLY CONTRACT.- PUMPS 44) PUMPS SHALL EACH HAVE A CAPACITY OF 445, UPM AT A TOTAL DYNAF.IC HEAD 45) OF 125 FEET WHEN DRIVEN AT 1750 RPM BY A Luu MAXIMUM HORSEPOWER MOTOR. 46) PUMPS WILL HAVE A TOTAL 14 NPSH AVAILAULE. 3 47) PUMPS SHALL BE INGERSOLL-RAND WORTHINGTON: BUFFALO FORGE; AURORA; 48) PEERLESS: WEINMAN, OR AS APPROVED. 2 49) MOTORS 3 50) MOTORS SHALL CONFORM TO THE FOLLOWING STANDARDS AND REQUIREMENTS: 4 51) "AMERICAN STANDARDS FOR ROTATING ELECTRICAL MACHINERY, C50', 52) AMERICAN NATIONAL STANDARDS INSTITUTE. 4 53) "AMERICAN STANDARD TERMINAL MARKINGS FOR ELECTRICAL APPARATUS 54) C6.11* AMERICAN NATIONAL STANDARDS INSTITUTE. "NEMA STANDARDS FOR MOTORS AND GENERATORS " , LATEST EDITION. 4 56) "AMERICAN STANDARD DEFINITIONS OF ELECTRICAL TERMS", AMERICAN 57) NATIONAL STANDARDS INSTITUTE. SHALL BE HEU SHOWN ACCEPTABLED SCHEDULED, OR SPEEDS 3 558) THE 9) UNDERSTOOD HORSEPOWER EE RATINGS 60) THE MAXIMUM ACCEPTABLE. 3 61) MOTORS SHALL BE WOUND FOR 4000 VOLT, WYE, 3 PHASE, 60 HERTZ, 200 HP. 3 62) MOTORS SHALL BE NEMA RATED "U" FRAME. "I'' FRAME MOTORS ARE NOT 63) ACCEPTABLE. 3 64) MOTORS SHALL BE GENERAL PURPOSE, SQUIRREL CAVE INDUCTION TYPE, DESIGN 65) " B", ACROSS-THE-LINE FULL VOLTAGE STARTiNO WITH MAXIMUM SLIP OF 5 66) PERCENT AND LOCKED ROTOR AND BREAKDOWN fuRUutS AS DEFINED IN NEMA. 3 67) MOTORS SHALL BE OPEN, DRIP-PROOF NEMA CLASS B INSULATION, RATED 1.15 68) SERVICE FACTOR. 3 69) SPEED CLASSIFICATION SHALL BE AS INDICATED OR REQUIRED FOR THE SERVICE 70) AND IN ACCORD WITH THE ESTABLISHED NEMA STANDARD MG1. 3 71) MOTORS SHALL OPERATE SUCCESSFULLY AT RATED LOAD WITH MAXIMUM VOLTAGE 72) VARIATION OF PLUS OR MINUS 10 PERCENT AT RATED FREQUENCY. 3 73) MOTORS SHALL BE SIZED SO THAT THEIR VESIUN LOADS SHALL NOT EXCEED 95 74) PERCENT OF THEIR RATED LOADS. 3 75) MOTORS SHALL HAVE CODE LETTERS FOR LOCKED RUTOR KVA PER HORSEPOWER AS 76) DEFINED IN ACCORD WITH NEMA STANDARD MU1. 3 77) MOTORS SHALL HAVE NAMEPLATES ATTACHED ThEReTO THAT SHALL GIVE MINIMUM 78) INFORMATION AS DEFINED IN NEMA STANDARD MG1. WHENEVER THE MOTOR 79) NAMEPLATE IS NOT VISIBLE, A PLATE WITh DUPLICATE INFORMATION SHALL BE 80) PROVIDED WHERE IT CAN BE READILY SEEN. NAMEPLATES SHALL NOT BE REMOVED 81) FROM MOTOR. 3 82) MOTOR ACCESSORIES SHALL INCLUDE: 4 83) GREASE LUBRICATED BALL TYPE BEARINGS. 4 84) TYPE OF MOUNTING AS REQUIRED WITH STANDARD DIMENSIONS IN ACCORD 85) WITH NEMA SECTION MG1-PART 3. 4 86) JUNCTION BOX OF ADEQUATE SIZE TO TERMINATE THE INDICATED CONDUIT Lu' FOH PROVIDED IF CONNECTION.SSAR Y. SHALLB EXTENSIONS AE SHALL dk 87) JAND UNCTION. SPECIAL 88) 4 89) SOLDERLESS CONNECTORS USED ON ALL MUTUR LtADS. Approved For Release 2009/04/02 : CIA-RDP89-00244R000300150010-7 SON 15610 PAGE 3 -H 6G 13155 BP-35 11/29/63 TIME 14.443 CENTRAL INTELLIGENCE A NCY CONDENSER wA1ER PUMPS HEADQUARTERS EXPANSION BID PACKAGE 3SP SUPPLY CONTRACT - PUMPS 3 90) MOTOR COMPARTMENTS SHALL BE CLEAN ANU uRY AND ADEQUATELY VENTED 91) DIRECTLY TO THE EXTERIOR. 3 92) MOTORS SHALL BE AS MANUFACTURED BY OELLO: LIMA' REULAND; GENERAL 93) ELECTRIC; ELECTRIC APPARATUS; OR AS APPHOVCU. 3 94) A LOAD TEST SHALL BE CONDUCTED ON ALL w(JTOkS AND THE CURRENT READINGS 95) TAKEN.-UNDER NO CONDITION SHALL THE LOAD CONTRACTING NAMEPLATE 96) RATING OF THE MOTOR. IF THIS CONDITION EAISTS? 97) SHALL BE NOTIFIED IMMEDIATELY.