WORKSTATION SURVEY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00244R000200330001-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 3, 2008
Sequence Number: 
1
Case Number: 
Publication Date: 
December 20, 1982
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP89-00244R000200330001-8.pdf162.04 KB
Body: 
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 #,e Be Y % io ^ a DDS4T-4140-82 20 December 1982 MEMORANDUM FOR: Chief, Building Planning Staff, OL le Administrative Staff, DDSFT SUBJECT: Workstation Survey REFERENCE: Your memorandum dated 15 November 1982, Same subject As requested in reference, attached are the space worksheets from O/DDS&T, ORD, OSO and FBIS. If you have any questions concerning the workstation or special use requirements stated on the worksheets, please call Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 MEMORANDUM FOR: Chief, Administrative Staff, DDS&T Chief, Support Branch, ORD/DDS&T Validation of Work Stations and Special Use Space Requirements REFERENCE DDS&T 4075-82 dated 17 Nov 1982, Same Subject 1. As requested in referenced memorandum, ORD's work stations and space requirements have been verified on the attached forms. 2. Due to the nature of our work (technology development), we support various projects in-house which require additional work stations. Although our current personnel ceiling (FY-83) ism we are required to support an additional 20 work stations. 25X1 This figure may grow to 30 by FY-85 if our new business packages are approved. It should also be noted that additional space is needed for storage of miscellaneous equipment used for the various projects. 3. Three new positions were approved for ORD for FY-83- There will be a requirement for three additional work stations; however, at this time the grade level or exact location has not been determined. Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 336 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 OSO-1714 14 DEC 1982 MEMORANDUM FOR: Chief, Administration Staff, DDS~T FROM: SUBJECT: Chief, Support Staff, OSO/DDS&T Validation of Workspace and Special Use Space Requirements REFERENCE: DDS1T Memo 4075-82 dtd 17 November 82 1. Attached are the results of the requested workstation validation survey conducted by the Office of Sigint Operations (OSO). Please note that, in some cases, managers attached memoran- dums explaining reorganizations and future personnel requirements. 2. Any questions concerning the survey can be directed to Attachments: As stated OL 2 5836 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 r s~ d OSO 1679-82 MEMORANDUM FOR: Chief, Logistics Branch, OSO Chief, Area operations Division, OSO SUBJECT: Workspace Requirements 1. This is the response to your memo of 23 November 1982, requesting information to validate the workspace requirements for AOD. This response takes into account not only current personnel strengths, but also the increase already approved for Fiscal Years 1983 and 1984. Where the additional billet has been approved, but the grade level not determined, the most likely grade level has been used so that square footage esti- mates can be made. 2. AOD currently staffs three tasks forces in support of new requirements in addition to its normal organizational structure. The personnel assigned in two of these task forces require workstations which are not counted in the requirements of the organizations shown on the worksheet. For convenience, these spaces are shown on the worksheet as DCOP X OTHER EMPLOYEES. a. The Counterterrorist Staff will have authorized billets by FY83, which will be carried on AOD's authorized strength. b. The Mask Force requi res 25X1 25X1 workstat ions. c. Thel ( Task Force requires at l east 25X1 workstations, some of which wil sed by 25X1 non-Agency personnel detailed to AOD. 2~DA'I 3. Personnel in development status (e.g., career trainees, rotational assignments, etc.) require four workstations which are not reflected in the Table of Organization. These are carried on the Form as Office of the Chief Other Employees. Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 Approved For Release 2008/06/03: CIA-RDP89-00244ROO0200330001-8 SUBJECT: Workspace Requirements 4. AOD operates a training program using two in- structors and an independent contractor (two instructors are detailed from branches), whose workstations are carried under Office of the Chief Other Employees. The training program also requires a classroom equipped with and equipment storage area (150 square feet), all of which must be co-located with the instructor workstations. All of this space will be allocated to the Office of the Chief. Attachment: OSO Space Worksheet OSO 1679-82 Page 2 25X1 25X1 Approved For Release 2008/06/03: CIA-RDP89-00244ROO0200330001-8 Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 OSO-1671-82 8 December 1982 MEMORANDUM FOR: C/LOGS/SS/OSO C SWCD GSG OSO SUBJECT: Validation of Workstations REFERENCE: C/LOGS Routing and Record Sheet (w/attachments), Subject as above, dated 23 November 1982 1. The Strategic Weapons Collection Division is currently undergoing a reorganization. The attached paper reflects this reorganization and associated workstation requirements. 2. In addition to the "special space" noted on your worksheet, SWCD currently has the following space: 3. Planning for future SWCD space should include these "special space" requirements as a minimum. Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8