WORKSTATION SURVEY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00244R000200330001-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
7
Document Creation Date:
December 22, 2016
Document Release Date:
June 3, 2008
Sequence Number:
1
Case Number:
Publication Date:
December 20, 1982
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP89-00244R000200330001-8.pdf | 162.04 KB |
Body:
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
#,e Be Y % io ^ a
DDS4T-4140-82
20 December 1982
MEMORANDUM FOR: Chief, Building Planning Staff, OL
le Administrative Staff, DDSFT
SUBJECT: Workstation Survey
REFERENCE: Your memorandum dated 15 November 1982,
Same subject
As requested in reference, attached are the space
worksheets from O/DDS&T, ORD, OSO and FBIS. If you have
any questions concerning the workstation or special use
requirements stated on the worksheets, please call
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
MEMORANDUM FOR: Chief, Administrative Staff, DDS&T
Chief, Support Branch, ORD/DDS&T
Validation of Work Stations and Special Use
Space Requirements
REFERENCE DDS&T 4075-82 dated 17 Nov 1982, Same Subject
1. As requested in referenced memorandum, ORD's work
stations and space requirements have been verified on the
attached forms.
2. Due to the nature of our work (technology development),
we support various projects in-house which require additional
work stations. Although our current personnel ceiling (FY-83)
ism we are required to support an additional 20 work stations. 25X1
This figure may grow to 30 by FY-85 if our new business packages
are approved. It should also be noted that additional space is
needed for storage of miscellaneous equipment used for the various
projects.
3. Three new positions were approved for ORD for FY-83-
There will be a requirement for three additional work stations;
however, at this time the grade level or exact location has not
been determined.
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8 336
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
OSO-1714
14 DEC 1982
MEMORANDUM FOR: Chief, Administration Staff, DDS~T
FROM:
SUBJECT:
Chief, Support Staff, OSO/DDS&T
Validation of Workspace and Special Use
Space Requirements
REFERENCE: DDS1T Memo 4075-82 dtd 17 November 82
1. Attached are the results of the requested workstation
validation survey conducted by the Office of Sigint Operations
(OSO). Please note that, in some cases, managers attached memoran-
dums explaining reorganizations and future personnel requirements.
2. Any questions concerning the survey can be directed to
Attachments:
As stated
OL 2 5836
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
r
s~ d
OSO 1679-82
MEMORANDUM FOR: Chief, Logistics Branch, OSO
Chief, Area operations Division, OSO
SUBJECT: Workspace Requirements
1. This is the response to your memo of 23 November 1982,
requesting information to validate the workspace requirements
for AOD. This response takes into account not only current
personnel strengths, but also the increase already approved for
Fiscal Years 1983 and 1984. Where the additional billet has
been approved, but the grade level not determined, the most
likely grade level has been used so that square footage esti-
mates can be made.
2. AOD currently staffs three tasks forces in support of
new requirements in addition to its normal organizational
structure. The personnel assigned in two of these task forces
require workstations which are not counted in the requirements
of the organizations shown on the worksheet. For convenience,
these spaces are shown on the worksheet as DCOP X OTHER EMPLOYEES.
a. The Counterterrorist Staff will have
authorized billets by FY83, which will be carried
on AOD's authorized strength.
b. The
Mask Force requi
res
25X1
25X1
workstat
ions.
c. Thel
(
Task Force requires at l
east
25X1
workstations, some of which wil sed
by
25X1
non-Agency personnel detailed to AOD.
2~DA'I
3. Personnel in development status (e.g., career trainees,
rotational assignments, etc.) require four workstations which
are not reflected in the Table of Organization. These are carried
on the Form as Office of the Chief Other Employees.
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
Approved For Release 2008/06/03: CIA-RDP89-00244ROO0200330001-8
SUBJECT: Workspace Requirements
4. AOD operates a training program using two in-
structors and an independent contractor (two instructors
are detailed from branches), whose workstations are carried
under Office of the Chief Other Employees. The training
program also requires a classroom equipped with
and equipment storage area
(150 square feet), all of which must be co-located with the
instructor workstations. All of this space will be allocated
to the Office of the Chief.
Attachment:
OSO Space Worksheet
OSO 1679-82
Page 2
25X1
25X1
Approved For Release 2008/06/03: CIA-RDP89-00244ROO0200330001-8
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8
OSO-1671-82
8 December 1982
MEMORANDUM FOR: C/LOGS/SS/OSO
C SWCD GSG OSO
SUBJECT: Validation of Workstations
REFERENCE: C/LOGS Routing and Record Sheet (w/attachments),
Subject as above, dated 23 November 1982
1. The Strategic Weapons Collection Division is
currently undergoing a reorganization. The attached paper
reflects this reorganization and associated workstation
requirements.
2. In addition to the "special space" noted on your
worksheet, SWCD currently has the following space:
3. Planning for future SWCD space should include
these "special space" requirements as a minimum.
Approved For Release 2008/06/03: CIA-RDP89-00244R000200330001-8