SUMMARY OF NEW BUILDING PROJECT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00087R000200160020-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 27, 2016
Document Release Date: 
January 30, 2013
Sequence Number: 
20
Case Number: 
Publication Date: 
March 10, 1985
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP89-00087R000200160020-1.pdf219.65 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: /4 E CIA-RDP89-00087R000200160020-1 L SUP STA TO: (Nen& office symbol, room number, Wilding, Agency/Post) Initials Date 11.a. 2. 3. 4. & /Action File Note and Return Approval For Clearance Per Conversation As Requested A For Correction Prepare Reply Circulate For Your Infopmation See Me Comment. Investigate Signature ,Coordination Justify REMARKS yi,eze /0,4, ? %cei-"14 Abikr me_ J1/6 /44- 114,1,44,4,4?74-_7e-- /i/ougg, STAT - STAT DO NOT use this form as a RECORD of approvals, concurrences, disposals, clearances, and similar actions IrRebal STAT ?STAT I ? ?% Room No.?Bldg. /01-s" OPTINALb4FrAM 41 (Rev. 7-76) Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 STAT z/.. (1-,-1;-.- 74-9,2,4 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 ;air? 7.1 STAT STAT 4 g:44,6tsp' 4145 ? uttALL4 SUMMARY OP NOR BUIEbING PROJECT 6" ? 4 Irj ri ("er; In the spring of 1981, a iplanning group was formed to make recommendations on how best to achieve the consolidation of Agency personnel on the Headquarters Compound in. order to recognize significant cost reductions and operational benefits. In the fall of 1981, a building site on the Compound was selected and the ,Master Development Plan was approved by the National Capital.Planning Commission. In August 1982, the architectural-engineering .firm of Smith, Hipchman, and Grylls Associates, Inc. (SH&G) of Detroit was selected to design a new building, and by March 1983, the final building design was selected. Congressional funding was made available in FY-1984. In March 1984, funding for.BI-d Package frLof-J-S167500;00p was allocated for site preparation, a retaining wall, the New Building foundation, and a 2500-car parking deck. In July 1984, funding for aid-Package-f3-of--$I6T8007000 was allocated for a major upgrade of the Powerhouse. Btd-Package-#211,for-construction-of-the new-Headquarters-butt:ling-itself, was funded in the amount of ..1:1-07000700-071 - _ Regarding the New Building, as-of-the_end_of-Febnary-198'6, 100% of the structural steel is in. place and nearly 50% of the concrete floor slabs have been poured. Work is progressing on the installation of major utility systems and pl:acement-of-ttie-extrib?-11ass shell 3.-?-SCh-eduted-to . ,The Small Business Administration (SBA) requested, and received, apart of the activity on the construction site. Bid-Patk-age-11-41 covers the construction of two Security Access and Visitor Control Centers, one at the Route 123 entrance and the other at the George Washington Memorial Parkway Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 STAT STAT (1A7t113.) 'gate. In addition to signifiCant design changes to the main entrance, the contract will also include site lighting, landscaping, curbing, ana,repaving Of road and parking areas. This COnractSWas Signed in Octobe'r 9I8with Robert Clay, Inc. and 'GSA wasgiven $7100040.00 to fund the effort. Due to some. administrative delays, the contractor did not move on-site until January 1986. Pre-construction efforts have been proceeding, and actual construction activity is expected to start as soon as weather permits. claid-Package157was originally designated to be a SBA 8-A set-aside to provide for the procurement and installation of 850,000-square feet of carpeting for the New Building. However, current plans are for the Government to procure the carpet and have the Bid Package #2 contractor install it. A summary of each of the Bid Packages follows: Bid Package 1 Total Funding of $16,500,000 for site preparation, foundation, retaining wall, and 2500-car, 3-level parking deck. Bid Package 2 Total funding of $110,000,000 for construction of the New Building with 1.1 million gross square feet and 850,000 net square feet of useable space. Four-story center section for equipment, heavy files and computer centers. Two seven-story towers with DDI in the North and DDA in the South tower. The Building features raised flooring throughout, and state-of-the-art energy management system. Declassified in Part- Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 Declassified in Part- Sanitized Copy Approved forRelease2013/01/30 : CIA-RDP89-00087R000200160020-1 ' . Bid Package 3 Total funding of $16,860,000 for the upgrade of the Powerhouse to serve both the old and new Headquarters buildings. Redundant chilled water, steam, and domestic waterlines on the South side. Reworked boilers to convert from #6 bunker oil to #2 fuel and eventually natural gas. Six new chillers, cooling towers, and seven gas-turbine generators. Bid Package 4 Total funding of $7,000,000 for the construction of two Security Access and Visitor Control Centers; one at Route 123 main gate, other at George Washington Memorial Parkway gate. Also site lighting, landscaping, curbing replacement, and repaving of road and parking areas. Bid Package 5 $2,000,000 Budgeted Government procurement and installation of over 850,000 square feet of carpeting. Bid Package #1 is complete. The-Powerhouse-is-essentia1ly-75% complete7-With-flnal_completion ex:petted-in-1ate-1986". The first steel for, the superstructure was placed in early June 1985 and the "topping out" ceremony celebrating the placement of the last major piece of structural_ steel was held on 13 January 1986:? , August-I983-Is-stiTi=the cOmpletion7d5lefor=thact7-wi-th-oecupaney-to-begin-shortly ) thereafteroccupancy is-expected;to_take-up-to-18-months to accomplish. 3 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1 The New Building project brought about other necessary changes and improvements to the Headquarters Compound. Various studies of area traffic situations identified the need for significant improvements to Route 123 and to the Route 123/193 interchange, as well as lesser improvements to the GWMP. The(GWMP-project is the construction of a 1000-foot-long accelerationiane from the Parkway exit ramp to allow a safer and smoother merge of Agency traffic with the northbound Parkway traffic. This project is about 70%-icoMff1ete, but has been delayed due to winter weather conditions. Final paviTig7of the roadway surface should be totally completed by the /a0-Apri1iaTe, date. The Route 123/193 improvements have taken on a high profile, as might be expected, due to the involvement of locally elected Federal, State, and County officials, the Virginia Department of Highways and Transportation (vbH&T), and local citizen groups. Recent actions have been focusing on an acceptable final design so that VDH&T may let a contract to begin construction in the 'fall 1986. Three million dollars has been budgeted for this project. I have several slides with me: that show the construction activity taking place at this time. Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP89-00087R000200160020-1