OL/NBPO WEEKLY REPORT - PERIOD ENDING 19 NOVEMBER 1986
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00063R000200230024-5
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 27, 2016
Document Release Date:
June 16, 2011
Sequence Number:
24
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 131.95 KB |
Body:
Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230024-5
STAT- ,
the Comptroller on 20 November on the status of the New Headquarters
b. The Chief, New Building Project Office (NBPO), OL, will brief
provided to them.
OL/NBPO WEEKLY REPORT - PERIOD ENDING 19 NOVEMBER 1986
1. Progress Reports on Tasks Assigned by the Senior Management:
a. G the formal letter required to complete the
submission package for the offsite road program v, acarried to the
National Capital Planning Commission (NCPC).o'1A was s gned jointly by the
General Services Administration and the Agency, and it requested that NCPC
take action at its 4 December 14" meeting on the Agency's Routes 123/193
offsite road program . NCPC annears to be satisfied with the documents
Building Construction Budget.
Y Sr c. Effective 13 November, the New Building Project Office (NBPO),
L, Site Security Staff began opening the Turkey Run Access Road
construction gate at 0600 rather than 0630 hours. This action was
not ,e!!; necessary to alleviate the traffic hazard caused by vehicles backing up at
th
e construction gate, and to meet a commitment made by NBPO to the local
n
+STAT
STAT
STAT
STAT
Administration, Associate Deputy Director for Administration, the F.xpnii$iu
iynway Haministration (r?HWA) to correct the problem.
d. On 24 November, the New Building Project Office, OL, will
conduct a tour of the New Headquarters Building for the Deputy Director for
spaces in the compound by approximately 200. This will not have an
immediate impact since it is more than offset by the number of, new spaces
r Return of this property will reduce the total number of parking
nstallation of this fence will implement the memorandum of Understandina
/-Z aken in preparation for the installation of a *ew permanent fence.
e. The General Services Administration and a local fence company
have surveyed the area in West A parking lot which is on "loan" to the
Agency from the Federal Highway Administration (FHWA). This action was
Assistant to the DDA, and the Director of Logistics.
realized by repaving and restriping the North and South Lots.
Major Events that Have Occurred During the Preceding Week:
a. Another major milestone has been reached in the New Building
Construction Program. The first of the three old diesel generators is
being dismantled in preparation for ite. Eventually, all
three units will be transported to for use by the local
Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230024-5
Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230024-5
STAT
STAT
STAT
ND
C -r AT
STAT
STAT
public utility. The action which made release of this generator possible
was the successful load test of four of the new gas turbine generators.
b. The Director, Near Eastern and South Asian Analysis,
Directorate of Intelligence, and eight staff members toured the New
Headauartprs ng on 17 November. No significant issues were raised.
c. New Building Project Office (NBPO), OL, presented Office of
Information Technology (OIT) requirements for early occupancy for prewiring
and installation to the Security Configuration Control Committee on 14
November. This was the first such meeting in an effort to standardize and
coordinate security requirements for new construction projects. As a
follow on to this meeting, the board will tour the New Headquarters
d. New Building Project Office (NBPO), OL, met with Deputy Chief,
Printing and Photography Division and the Chief Planner, Printing and
Photography Division, to review the floor plans for the new Job Planning
Office in the New Headquarters Building first floor atrium area.
e. New Building Projec ice (NBPO), OL, gave a
slide presentation to t e Fine Arts Commission works
STAT of two professional sculptors The
Ito sculpture samples were submitt to NBPU by the employees some time ago,
with the understanding that they would be considered when the construction
STAT
flo
STAT
status reached a point where fine arts planning should be initiated. Both
sculptors work in a variety of mediums (wood, stone, metal), and had an
interesting selection of contemporary pieces.
3. Upcoming Events:
a. Preparations are underway for a major paving effort in the
mpound. The Bid Package 4 contractor hopes to pave the last section of
th Lot, the roadways. and the VIP Parking Lot during 20-22 November.
I continue to press the GSA Project Manager for more meaningful
information regarding construction schedules and change orders.
Chie , New Building Project Office
D/OL
C/FMD/OL