FACILITIES MANAGEMENT DIVISION WEEKLY REPORT PERIOD ENDING 2 JULY 1986

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00063R000200190040-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
14
Document Creation Date: 
December 27, 2016
Document Release Date: 
November 8, 2011
Sequence Number: 
40
Case Number: 
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP89-00063R000200190040-2.pdf425.33 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 FACILITIES MANAGEMENT DIVISION WEEKLY REPORT PERIOD ENDING 2 JULY 1986 1. Events of Major Interest That Have Occurred During the Precedinq Week: b. The Mail & Courier Branch, was contacted by the Deputy Chief, Security Staff, Office of Logistics, on 27 June concernin courier access problems at the Treasury Department. 25X1, ad spoken with the Treasury Department, Office of 25X1 25X1 Security, and was assured that CIA couriers, whose names appeared on an authorized courier list, and who possessed CIA Courier Credentials could avoid standing in a visitor line by going directly to the guard and identifying themselves as Agency couriers. c. FMD architects are assisting NBCPO and OIT's contractor, Contel-Page, in locating appropriate locations for numerous 5-inch core drills. These drills are necessary to run 4-inch diameter conduits between floors in the Headquarters building in support of the new secure telephone system. Problems occurred when the runs previously designed by NBCPO conflicted with main HVAC ducts, walls and underfloor electric and telephone cells. d. On 24 June, the ..idtaz -6r ctrf1 Bran ri provided special courier support to the National Security Council (NSC), ~-- t i l oca ed n the Old Executive Office Building. A total of 75 boxes were picked d to the Agency's Archives and Records Center Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 f. On Sunday, 29 June, Allied plumbers performed emergency repairs on a steam line in the North basement. The line blew a gasket which caused steam to leak and pressure to drop. An emergency unscheduled steam outage was required to repair the steam lines. Service was restored by 1800 hours the same day. No adverse impact on normal operations within the Headquarters Building was experienced. g. The Historical Intelligence show of "Donovan and the f Fighting 69th" was removed and returned to lenders on 27 June. \J\ The FAC exhibit in the 1D Exhibit Hall for July is entitled "England: Castles, Cathedrals, Countrysides;" photographs by 25X1 of P&PD. 2. Significant Events Anticipated During the Coming Week: Chief, Facilities Management Division, OL Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 STAT Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 PRINTING AND PHOTOGRAPHY DIVISION WEEKLY REPORT FOR PERIOD OF 24 - 30 June 1986 25X1 25X1 I. Items or Events of Mai or Interest that Have Occurred During the Preceding Week * A. A representative of the Office of Logistics, Printing and Photography Division (OL/P&PD) met with personnel from Polysonics, Incorporated (an outside engineering contractor) to discuss the second phase of an acoustical study of the Headquarters Auditorium. During this meeting a discussion was held as to the Agency's specific needs for improved sound distribution within the auditorium. At the end of the meeting the Polysonics engineer ran a test in order to determine the limitations of the current auditorium sound system. The first phase of this study concerned acoustical problems associated with holding events within a dome-shaped structure. Preliminary evidence indicates that sound within the auditorium will never be perfect. However, it can be much improved by treating the discs in the back of the dome with sound absorbing materials and by making some hardware changes to the sound system. In addition, it was noted that one issue of concern to senior management, the 'capturing' of questions from the audience so that all present may hear, will most likely be unresolvable due to the dome-shaped structure of the auditorium. The least expensive and overall best method of covering questions from the audience would be to reinstitute the use of manned 'shotgun' microphones. A final report with detailed requirements for improving the sound quality within the Headquarters Auditorium will be available by the end of August. Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 unclassified. Included approximately 304 pages June, 19,000 copies of completed and delivered version, which consists 25X1 July in these publications are of text and 20 area maps. On 27 the unclassified version was to the customer. The classified of 5,100 copies, is targeted for 7 C. The Office of Logistics, Printing and Photography Division (OL/P&PD) is continuing with plans for the rebuilding of the two 25-inch Miehle offset presses in P&PD. During the last several months both presses have experienced frequent breakdowns, as a result of many years of continuous production. As the dependability of these presses are essential for major production, a study prompted P&PD to consider either the purchase of two new presses or the practicality of rebuilding the presses. After investigations were concluded, P&PD felt the most feasible option in terms of cost and effectiveness, would be to rebuild both presses. During the month of July a representative from Machineagraphics of Maryland will begin the process of refurbishing the two presses. The target date for completion is expected to be late August. * D. The Office of Logistics, ]]iyi Gi n (O P&Pns-,-.~..t-?"i, received a request for the production of the "Shanghai Street Guide." This project consists of 2,800 books %Vm 9- which will include various multi-colored maps of Shanghai. Beea~e- cnm ity.-?cif .fi_ni.shing..operati,ons, approximately 5,000 bo.o_ks..,wil.1be required during production in order to provide Completion of the---^d3 is targeted for late July. E. The Office of Logistics, Printing and Photography t a Division (OL/P&PD) is continuing production of the World Factbook which consists of two versions, classified and Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Water Quality Sampling Results Result Maximum or Acceptable Range Impurity (mg/1) of Content (mg/l*) * (mg/1) - milligrams of contaminant per liter of water. F. During the month of May, the Office of Medical Services, (OMS) tested samplings of the Office of Logistics, Printing and Photography Division's (OL/P&PD) water supply to determine if impurities are affecting P&PD's photographic processing. The result (see chart) of this sampling revealed that certain levels of sulfate, sodium bicarbonate, and calcium carbonate border on the maximum acceptable limits, which technical representatives believe explain why there is a persistent scale problem in some of the color processors and water distillation units. If not properly monitored this scale build-up could result in extensive preventive maintenance or downtime of the photographic processors. Representatives from P&PD are currently investigating feasible methods to resolve this problem. Following is a chart listing the results of the water 1. pH 7.8 [units] 7.0 to 8.5 units 2. Sulfate 185 200 3. Hardness a) as CaC03 137 40-150 b) as NaHCO3 151 150 4. Magnesium 9.78 Not given 5. Lead 0.007 0.05* quality sampling: ** 0.05 mg/l is the EPA Drinking Water Standard, there are no standards for lead in water for photographic processing. 5 II. Significant Events Anticipated During the Coming Week: A. On 1 July 3966 a representative of the Office of Logistics, Printing and Photography Division (OL/P&PD) will attend a demonstration of new technology equipment never before shown to the public. The Sony Corporation of America will demonstrate its latest hardware with regard to Compact Discs (CD), user recordable two-sided video discs, and hard-copy color cathode-ray tube (CRT) imaging systems. The Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 demonstration is hosted by the Library of Congress at the Madison Building on the 1st and 2nd of July between 1000 and 1600 hours. Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 1 JULY 1986 1. Progress Report on Tasks Assigned by the DCI/DDCI: No tasks assigned during this reporting period. 2. Items or Events of Major Interest that have Occurred During the Preceding Week: A. DAS (1) On 26 June 1986, the Wang Systems Coordinator, OL, met with the Wang Systems Administrator to assist in modifying the Wang prototype document used in preparing Government Bill of Lading (GBL) forms. The GBL was recently revised, thus requiring that the glossary and prototype document used in its preparation be modified and tested prior to the 1 July 1986 date on which the new form must be used. ,i\) capability and relayed a request for help in expediting a telecommunication hookup to a member of DAS. The DAS quickly (2)I Ihas three Wang Master units in their new Wang room. They have been operational but were without a telecommunication capability. was in urgent need of this acquired the resources and coordination necessary to make telecommunication line operational. (3) Initial feedback on relocating three OL component's Wang terminals and printers first floor indicates that, at $400 per drop, some 23,600 will be needed. The cost per drop may decline. At the present time 19 drops will be required plus 40 "futures" in the OL portion of the grid. (5) The P&PD MIS has encountered operational difficulties--all of which appear to be caused by the lack of appropriate OIT support. The system is again functional under an old version of NOMAD. Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 1 JULY 1986 25X1 25X1 (6) ICS and CONIF technicians continue to retire obsolete records from these systems, in preparation for end-of-year closeout activities. Literally thousands of records have been archived from the active data base. B. Regulations (1) IMSS actions on regulations included the following: (1) The Claims Review Officer,) I gave an hour's presentation on personal property claims to CTs attending the DDS&T's Career Trainee Course at Chamber of Commerce on Wednesday, 25 June 1986. The presentation was well received. (2) On 28 May 19861 (claims assistant, filled in for 0 and gave a claims presentation at the OTE Overseas Orientation Course at Chamber of Commerce. This was Linda's first experience in giving such a presentation, and she is to be commended for a job well done. Declassified in Part - Sanitized Copy Approved for-Release-201-1/11/08 : CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 INFORMATION AND MANAGEMENT SUPPORT STAFF WEEKLY REPORT FOR PERIOD ENDING 1 JULY 1986 (3) Status of Headquarters Claims Review Board personal property claims for June 1986 is as follows: Received: 13 Adjudicated: 19 Amount Claimed: 37,081.84 Amount Paid: 19,578.54 Claims Denied: 2 Returned to originating office--under $300 2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 25X1 25X1 1. Progress Report of Tasks Assigned by the DCI/DDCI: No tasks assigned during this reporting period. 2. Items or Events of Major Interest that have Occurred During the Preceding Week: c. A meeting was held at the AT&T facilities in Washington, D.C. between the contracting officer, Production and Services Contract Branch, Procurement Division, OL; Contracting Officer's Technical Representative; and AT&T technical/program representatives, to discuss the technical re uirements, schedule, and pricing for a letter contract The letter contract calls for AT&T Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 C O N F I D E N T I A L to design, build, and install a computerized private branch exchange 25X1 25X1 25X1 (CBX) system. The Purpose of the CBX will be to support the Intelligence Community. The meeting proved to be successful as the technical requirements and schedule have been finalized. The pricing, contract terms, and conditions shall be finalized by the contracting officer after AT&T submits their proposal in mid July, 96-r f . Generai , n, OL, received a requisition from The Counterterrorism Center on 9 June of~. r t 4G?-~,,,, r.err procurement of three Portable Secure Voice Data Systems and support equipment. Af er um-rou _' +-h tlia ? i ~xa cb . 1ar~ ~.~.1~..a 3- s. o~?~irrrrr a- gbRA 1. Fhe order was placed with C. R. International, Inc., on Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 1, 30 Junee i'I'SG - efficer will be picking up partials of the items in two weeks and the remainder of the items will be delivered on or before 30 September. ~- 3. Significant Events Anticipated During the Coming Week Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 STAT Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2 Next 6 Page(s) In Document Denied Iq Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190040-2