P&PD EXPANSION STUDY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP88G01332R000800890005-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
89
Document Creation Date: 
December 27, 2016
Document Release Date: 
December 1, 2011
Sequence Number: 
5
Case Number: 
Publication Date: 
June 18, 1985
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP88G01332R000800890005-2.pdf3.11 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Rer WING AS1) TRANSMITTAL SLIP 14 JUL 1986 STAT ILLEGIB STAT "0: (Name. (price symbol, room number, building, Agency, Post) AVDDIN"?' 2. ? n4?144 & ? ' Action File ' INote and Return ' For Clearance ! Per Conversation _Approval As Requested For Correction Prepare Reply = For Your Information i See Me .....Circulate Comment Investigate Signature Coordination Justify 5041-102 OPT Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 DD A Fs imtr PPD EXPANSION STUDY SECTION I rev 6/18/85 A. This report provides a comparison of seven variations to add more space to the PUD building for office and computer equipment; a summary of the schemes is in Table 1-1. A discussion of factors and issues influencing expansion at PEIPD is in Section II. Section III provides the time schedule of activities necessary to build the expansion. Conclusions and Recommendations are in Section IV. Detailed explanations of the schemes and their estimates are found in the attachments to Section V. B. Purpose and Scope The purpose of this study is to define the feasible expansion at P&PD which could provide space for requirements anticipated by the COMPUTER STUDY PANEL in their report of 15 February 1985, and to provide some additional office space on the compound beyond that amount to be made available by 1988. page 1 L'h 1L-; u ULLLo" :)1L rVf d\.\ 1r5-17,7:, Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Alternative Number Approach STAT 1 One story addition above existing 2 Two story addition above existing 3 Two story addition adjacent to existing 4 Two story addition above plus two story addition adjacent Two story addition above plus four story addition adjacent 6 Separate New Building 7 One story addition above plus three story addition adjacent Computer Space (SF) 34,000 4.000 UPS 6,600 2,200 UPS 50,000 5,000 UPS 50,000 5,000 UPS 50,008 5.000 UPS 58,808 5,880 UPS 2.288 UPS TABLE 1-1 COST AND SCHEDULE SUMMARY Office Space (SF) Total Net SF ? 4,800 42,800* 68.000 76,800* 8,800 63,800* 76,800 131,800* 0,10. 131.808 1$6,000* 5,088 65,400 plus 43,808- Printshep Total Gross SF 49,200 87,688 85,100 Estimated Cost Design and Const. Mos. $ 9,643,110,, 35 $12.622,088$144 38 $13.487.80040 38 161.388 $30,447,814 III 235,000 88,80$ 117.20$* 151,65$ 40 1 $21,111,010 36 v $26,144,$$$40 3$ Includes 8,800 SF expansion of basement of existing building. 41/e kwy Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Plarkinl Re Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 STAT STAT STAT STAT PPD EXPANSION STUDY rev 6/18/85 SECTION II A. NCPC and Community Issues. The concerns relative to the local community and the National Capital Planning Commission (NCPC) are interlaced by issues of traffic on local feeder roads to Headquarters, the amount of parking in the compound and the neighbors' fear that growth of CIA facilities and population will diminish their property values. The Agency has made promises that parking and population will be held to levels approved for the New Headquarters Building (NHB) and has agreed that peak traffic flow through the gates will not exceed levels measured by the State in 1982. Traffic Flow: Current planning for the NHB has already exceeded the NCPC guidelines for population growth on the compound. , The larger proposals in this study increase population by to over people. Although some of this impact might be reduced by traffic management, it will be impossible for the Agency to keep its commitment to hold peak hour traffic at the 1982 level. Failure to do so will result in the Agency's escrow fund being spent to widen Route 123. Such expenditure may e on y a moderate cost impact, but local community reaction will be very extensive. Parking: Only parking spaces will be available when i NHB s completed; an estimated shortage of parking spaces is predicted. The degree to which expansion at PPD makes the shortage worse varies with each of the schemes; Table 1-1 shows the parking recommended for each. Unfortunately, more parking cannot be built without either constructing more multilevel parking structures or denuding the site of its trees - either will enflame the neighbors. The cost estimates provided in Appendix A only account for simple surface parking and not parking structures. Public Review: Expansion schemes 2 through 7 are of such size that full NCPC reviews will be required with environmental assessment hearings and master plan revisions prior to detailed project reviews. Scheme 1 may possibly be considered by NCPC to be small enough in impact to require only staff review with out public hearings. page 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PPD EXPANSION STUDY rev 6/18/85 SECTION II. B. Central Utility System Capacity. Scheme 2 can be supported by the 1987 plant capacity that is now being installed. Schemes 1,3 and 6 are borderline cases that would consume the spare cooling and electric capacity reserved for future demand in the main office buildings; some additional cooling and electric capacity should be added to preserve this spare capacity. Schemes 4,5, and 7 or a combination of 6 with any other scheme, will overrun the 1987 plant and will require a major expansion of cooling and electrical facilities estimated at 5 million dollars. That amount has been included in the total construction estimates for these schemes. C. Interference with PUD Operations Only scheme 6 would not cause adverse impact to PUD operations. Scheme 3 would minimize interruptions but would cause outages to utilities and vibration intermittently for about 8 to 10 months at the beginning of construction. Schemes 1 and 2, being equal in impact, would increase the frequency and duration of outages over those of scheme 3. Schemes 4, 5, and 7 present the greatest adversity to operations. Further study with PUD experts is necessary to fully understand the real extent of predicted impacts and to develop a plan to accomplish essential daily work elsewhere. page 3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 STAT PPD EXPANSION STUDY SECTION II rev 6/18/85 D. Rental Facilities Compared with New Construction. The feasibility of leasing custom built facilities was also investigated. Annual rents for facilities similar to those in schemes 1 - 6 range from $17.50 to $24.00 per sf in For an additional $Z per sf per year, 3.6 auto parking spaces are provided with each 1000 sf of space rented. At those rates, scheme 5 would range from 3.7 to 4.9 million dollars per year and the rental costs would equal construction cost on the compound in about 6 to 9 years. Local developers may also be interested in making lease-purchase agreements which would be attractive to the Agency. The advantages of leasing or lease-purchases are several: first, renting offers the ability to acquire parking and to avoid the community/traffic problems at Headquarters; second, overrunning the capacity of the utilities,food service and support systems at Headquarters is avoided ; third, the problem of providing major funding for lumpsum construction contracts is diffused to relatively small annual payments. page 4 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PUD EXPANSION STUDY rev 6/18/85 SECTION III A. Project Schedule. The estimates of time required to design and build the schemes are based the traditional sequential process of design development, contract documents, bidding, contract award and construction; these estimates assume that the Agency program and detailed statement of user-requirements are established beforehand. The period of 35 to 40 months could be reduced to about 28 months if fast-tracking methods of overlapping design and construction efforts would be used; however that would require assurance that all NCPC/community approvals and special arrangements with the contracting agency were in place before activities began. SECTION IV A. Conclusions: 1. All of the schemes are technically feasible, but schemes 4, 5, 6, and 7 are very costly. This is due in part to the assumed need for full RFI shielding around computer rooms and the need to expand basic utilities. Also note that the cost estimates are based on 1985 prices and will rise with inflation. 2. The 1987 facilities now under construction are planned to support )nly the population of original and new Headquarters buildings. Each of these schemes over-burden to some extent the capacity of the 1987 facilities. 3. Schemes 2, 4, 5, and 7 with their high populations impose severe burdens in the areas of traffic flow, parking and food service. Expansion of parking structures and cafeterias would be necessary with these schemes. 4. Schemes 4, 5, and 7 will require major upgrading of the utility systems. Combinations of scheme 6 with any of the others cannot be supported by the compound. page 5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 STAT STAT PPD EXPANSION STUDY rev 6/18/85 SECTION IV. A. Conclusions. 5. The relationship with the community is volatile. Public reviews of the master plan revisions and environmental assessments are unavoidable. Public reaction will be dependent on the manner in which traffic and parking problems are handled; these issues must be resolved at the conceptual stage because they have such a basic effect on the project. 6. All schemes except number 6 will have an adverse impact on P&PD production; if any of these schemes are approved for further development, a plan to accomplish necessary PPD work during the construction should be made. 7. It should be recognized that construction of any of these schemes would not fulfill the Computer Study Panel recommendation for expandable computer facilities, because facilities in this part of the compound cannot be further expanded. 8. Construction of even the largest of these schemes will not provide the amount of office and computer space that will be needed in the 1990's. B. Recommendations: In lieu of Schemes 1 through 7 , it is recommended that the Agency space requirements for the period of 1988 to 1999 be satisfied by the acquisition of facilities which can initially provide 300,000 net sf of office an 55,000 net sf of computer space. These facilities should be expandable so that the computer space may be doubled and the office space may be increased by one third after 1992. Such facilities should be acquired through lease-purchase agreements. page 6 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PUD EXPANSION STUDY SECTION V. Appendicies: Appendix Appendix A A copy of the analysis and of each scheme, which were by DICON, are attached. B A copy of the Rental Costs is attached. page 7 rev 6/18/85 estimates of prepared information Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 6'127 ALTERNATIVE DESIGN CONCEPTS AND BUDGETARY ESTIMATES FOR EXPANSION OF PRINTING AND PHOTOGRAPHY DIVISION BUILDING DICON ARCHITIICTS AND IINOINEMIAll 8133 Leosburg Plico, Suite 910 Vionna, Virginia 22180 Tel*. (703) 827 - 8370 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 ALTERNATIVE DESIGN CONCEPTS AND BUDGETARY ESTIMATES FOR EXPANSION OF PRINTING AND PHOTOGRAPHY DIVISION BUILDING SUBMITTED 6-5-85 REVISED 6-6-851 G?ti?as Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Contents SECTION DESCRIPTION Executive Summary 1 Alternative Concepts 2 Design Features 3 Estimating Procedures 4 Cost Estimates 5 Construction Schedule Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 EXECUTIVE SUMMARY Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 EXECUTIVE SUMMARY Preparation of the Alternative Design Concepts and Budgetary Estimates was commissioned by the Agency on May 30, 1985. The object has been to describe and define features of seven (7) alternatives for the expansion of the Printing and Photography Division Building. Alternative design concepts were identified by the Agency and have been developed in the detail required for reasonable cost estimates. Cost estimates were then developed from the concept designs from data on similar facilities which have been or are substantially completed by DICON's parent companies. The cost estimates recognized the different circumstances under which construction of each Alternative would take place. Although the time available for preparation of the Alternative Design Concepts and Budgetary Estimates was relatively short, four (4) days, the quality of the work in terms of program planning estimates has not suffered. DICON's parent companies have been involved in the design and construction of many similar facilities during the past five (5) years. Their specialization in the design and construction of unique defense facilities housing large data processing centers has provided a substantial data base for estimating the cost of every feature of each Alternative. Estimated costs have been adjusted to reflect the differential between the Washington, D.C. area and the several other locations in the United States used in the data source. In addition, the cost increase or decrease to accommodate special features as directed by the Agency has been recognized in the estimates. Table ES-1 shows the principal feature and the estimated cost of each alternative considered. Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Alternative Computer Number Approach Space (SF) 1 2 3 4 5 6 7 One story addition 34,000 above existing 4,000 UPS Two story addition 6,600 above existing 2,200 UPS Two story addition 50,000 adjacent to 5,000 UPS existing Two story addition 50,000 above plus two 5,000 UPS story addition adjacent Two story addition 50,000 above plus four 5,000 UPS story addition adjacent Separate New Building One story addition above plus three story addition adjacent 50,000 5,000 UPS 6,600 2,200 UPS TABLE ES-1 COST AND SCHEDULE SUMMARY *Includes 8,800 SF expansion of Office Space (SF) Total Net SF Total Gross SF Estimated Cost Design and Const. Mos. 4,800 42,800* 49,200 $ 9,643,000 35 68,000 76,800* 87,600 $12,622,000 38 8,800 63,800* 85,100 $13,487,000 38 76,800 131,800* 161,300 $30,447,000 39 131,800 186,800* 235,000 $38,194,000 40 5,000 60,000 80,000 $20,110,000 36 65,400 117,200* 151,650 $26,144,000 38 plus 43,000 Printshop basement of existing building. Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 1 ALTERNATIVE CONCEPTS Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 1 ALTERNATIVE CONCEPTS The pages that follow provide detailed descriptions of seven (7) Alternative Concepts for potential expansion of the Printing and Photography Division (P&PD) Building. These concepts vary from a minimal one story addition producing a total building area of 115,880 sq. ft. to a major vertical and horizontal expansion producing a total building area of more than 300,000 sq. ft. This selection therefore provides the reviewer with a wide range of alternatives. To support the individual descriptions, Figures 1A thru 7A provide aerial perspective sketches illustrating the physical characteristics of each Scheme and Figures 18 thru 7B provide three dimensional "Exploded Plan" Diagrams of each scheme showing the physical relationships between its expansion areas and the existing building. One special consideration, not shown on the following pages, is the effect of proposed construction on the operations that are currently conducted in the existing building. Schemes 1? 2, 4, 5 and 7, because of the vertical expansion required, will create considerable disturbance to existing personnel. Scheme 3, which involves only lateral expansion, would minimize but not eliminate such disturbance and Scheme 6, being a totally independent building would have no effect on the existing operation. 1-1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 1 This Alternative Concept would provide for addition of the following areas to the existing P&PD Building: A. One (1) additional floor on top of the existing building having exactly the same configuration as the upper level. B. A three (3) story infill of the 30' x 50' north-east corner of the existing building. C. A 10,800 sq. ft. underground expansion of the south end of the existing basement level. The new Second Floor would not adversely effect the existing superstructure since its original design anticipated the future addition of two (2) full floor levels. The additional story would provide a net increase of 34,000 SF of computer space. The basement level expansion would provide a net increase of 8,800 SF of which 4,000 SF would be allocated for UPS equipment and the remaining 4,800 SF for office space. An additional 6,400 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, Scheme No. 1 would provide New Construction totalling 49,200 Square Feet as follows: Building Area (Sq. Ft.) Computer Areas 34,000 UPS Area 4,000 Office Areas 4,800 Additional Net Area 42,800 SF Service Areas 6,400 Additional Gross Area 49,200 SF Existing P&PD Building Area 66,680 Resultant Total Building Area 115,880 SF 1-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure lA SCHEME I Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 34,000 S.F. SECOND FLOOR 8,800 S.F. 700 S.F. FIRST FLOOR EXISTING NEW Figure 1B 700 S.F. GROUND FLOOR SCHEME I Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 2 This Alternative Concept would provide for the addition of the following areas to the existing P&PD Building: A. Two (2) additional floors on top of the existing building having exactly the same configuration as the upper level. B. A four (4) story infill of the 30' x 50' north-east corner of the existing building. C. A 10,800 sq. ft. underground expansion of the south end of the existing basement level. The weight contributed by the new Second and Third Floors would not adversely effect the existing superstructure since its original design anticipated the future addition of two (2) full floor levels. The additional stories would provide a net increase of 68,000 SF of office space. The basement level expansion would provide a net increase of 8,800 SF of which 2,200 SF would be allocated for UPS equipment and the remaining 6,600 SF for computer space. An additional 10,800 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, Scheme No. 2 would provide New Construction totalling 87,600 Square Feet as follows: Building Area (Sq. Ft.) Computer Areas 6,600 UPS Area 2,200 Office Areas 68,000 Additional Net Areas 76,800 SF Service Areas 10,800 Additional Gross Area 87,600 SF Existing P&PD Building Area 66,680 Resultant Total Building Area 154,280 SF 1-3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure 2A SCHEME 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 34,000 S.F. THIRD FLOOR 34,000 S.F. SECOND FLOOR 700 S.F. EXISTING NEW Figure 2B 700 S.F. FIRST FLOOR GROUND FLOOR SCHEME 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 3 This Alternative Concept would provide for addition of the following areas to the existing P&PD Building: A. An irregularly shaped two (2) story addition abutting the north and west sides of the existing P&PD Building. B. A two (2) story infill of the 30' x 50' north-east corner of the existing building. C. A 10,800 sq. ft. underground expansion of the south end of the existing basement level. D. An irregularly shaped two (2) story stairs/elevators/entrance tower appended to the east wall of the existing building. Areas A and D, above, being new horizontal additions, will require new caisson foundations similar to those of the existing building. The building addition would provide a net increase of 50,000 SF of computer space and 5,000 SF for UPS equipment. The basement level expansion would provide a net increase of 8,800 SF of office space. An additional 21,300 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, Scheme No. 3 would provide New Construction totalling 85,100 Square Feet as follows: Building Area (Sq. Ft.) Computer Areas 50,000 UPS Area 5,000 Office Areas 8,800 Additional Net Area 63,800 Sq. Ft. Service Areas 21,300 Additional Gross Area 85,100 Sq. Ft. Existing P&PD Building Area 66,680 Resultant Total Building Area 151,780 Sq. Ft. 1-4 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure 3A SCHEME 3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 FIRST FLOOR 27,500. S.F. GROUND FLOOR SA EXISTING NEW Figure 3B 36,300 S.F. SCHEME 3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 4 This Alternative Concept would provide for addition of the following areas to the existing P&PD Building: A. An irregularly shaped two (2) story addition abutting the north and west sides of the existing P&PD Building. B. Two (2) additional floors on top of the existing building having exactly the same configuration as the upper level. C. A four (4) story infill of the 30' x 50' north-east corner of the existing building. D. A 10,800 sq. ft. underground expansion of the south end of the existing basement level. E. An irregularly shaped four (4) story stairs/elevators/entrance tower appended to the east wall of the existing building. Areas A and E, above, being new horizontal additions, will require new caisson foundations similar to those of the existing building. The vertical two story addition would provide a net increase of 68,000 SF of office space. The horizontal two level addition would provide a net increase of 50,000 SF of computer space and 5,000 SF for UPS equipment. The basement level expansion would provide a net increase of 8,800 SF of office space. An additional 29,500 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, this Scheme No. 4 would provide total New Construction of 131,800 Square Feet as follows: Building Area (Sq. Ft.) Computer Areas 50,000 UPS Area 5,000 Office Areas 76,800 Additional Net Area 131,800 Sq. Ft. Service Areas 29,500 Additional Gross Area 161,300 Sq. Ft. Existing P&PD Building Area 66,680 Resultant Total Building Area 227,980 Sq. Ft. 1-5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure 4A SCHEME 4 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 THIRD FLOOR 34,700 S.F. SECOND FLOOR 34,700 B.F. FIRST FLOOR 27,500 S.F. GROUND FLOOR U EXISTING NEW Figure 4B SCHEME 4 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 5 This Alternative Concept would provide for addition of the following areas to the existing P&PD Building: A. An irregularly shaped four (4) story addition abutting the north and west sides of the existing P&PD Building. B. Two (2) additional floors on top of the existing building having exactly the same configuration as the upper level. C. A four (4) story infill of the 30' x 50' north-east corner of the existing building. D. A 10,800 sq. ft. underground expansion of the south end of the existing basement level. E. An irregularly shaped four (4) story stairs/elevators/entrance tower appended to the east wall of the existing building. Areas A and E, above, being new horizontal additions, would require new caisson foundations similar to those of the existing building. The vertical two story addition would provide a net increase of 68,000 SF of office space. The horizontal four level addition would provide a net increase of 50,000 SF of computer space, 55,000 SF of office space and 5,000 SF for UPS equipment. The basement level expansion would provide a net increase of 8,800 SF of office space. An additional 48,200 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, Scheme No. 5 would provide New Construction totalling 235,000 Square Feet as follows: Building Area (Sq. Ft.) Computer Areas 50,000 UPS Area 5,000 Office Areas 131,800 Additional Net Area 186,800 Sq. Ft. Service Areas 48,200 Additional Gross Area 235,000 Sq. Ft. Existing P&PD Building Area Resultant Total Building 1-6 66,680 Area 301,680 Sq. Ft. Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure 5A SCHEME 5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR EXISTING NEW Figure 5B SCHEME 5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 6 This Alternative Concept would provide for construction of a separate new building as follows: A. A rectangular two (2) story building measuring approximately 125' x 320' with its long axis in a northeast-southwest orientation and located so that its easternmost corner would be approximately 275 feet due west of the north end of the existing P&PD Building. B. This Scheme assumes that there would be no new construction added to the existing P&PD Building. Being a new structure, this Scheme would require new caisson foundations similar to those of the existing building. The new structure, configured as two levels above grade would provide 50,000 SF of computer space, 5,000 SF of office space and 5,000 SF for UPS equipment. An additional 20,000 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, Scheme No. 6 would provide New Construction totalling 80,000 Square Feet as follows: Building Area (Sq. Ft.) Computer Areas 50,000 UPS Area 5,000 Office Areas 5,800 Additional Net Area 60,000 Sq. Ft. Service Areas 20,000 Additional Gross Area 80,000 Sq. Ft. Existing P&PD Building Area 66,680 Resultant Total Area of Both Buildings 146,680 Sq. Ft. 1-7 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure 6A SCHEME B Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 27,500 S. F. SECOND FLOOR 27,5530 S. F. FLOOR Figure 66 EXISTING NEW ???.. /"/ / /EXISTING P & PD BU ILDING SCHEME Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Expansion Scheme No. 7 This Alternative Concept would provide for addition of the following areas to the existing P&PD Building: A. An irregularly shaped three (3) story addition abutting the north and west sides of the existing P&PD Building. B. One (1) additional floor on top of the existing building having exactly the same configuration as the upper level. C. A three (3) story infill of the 30' x 50' north-east corner of the existing building. D. A 10,800 sq. ft. underground expansion of the south end of the existing basement level. E. An irregularly shaped three (3) story stairs/elevators/entrance tower appended to the east wall of the existing building. Areas A and E, above, being new horizontal additions, would require new caisson foundations similar to those of the existing building. The vertical one story addition would provide a net increase of 34,000 SF of office space. The horizontal three level addition would provide a net increase of 31,400 SF of office space and 43,000 SF of Industrial Photoshop space. The basement level expansion would provide a net increase of 6,600 SF of computer space and 2,200 SF for UPS equipment. An additional 34,450 SF would be required for Service Areas consisting of stairs, new elevators, toilets and circulation. In summary, Scheme No. 7 would provide New Construction totalling 151,650 Square Feet as follows: Building Area (Sq. Ft.) Industrial Photoshop Areas 43,000 Computer Areas 6,600 UPS Area 2,200 Office Areas 65,400 Additional Net Area 117,200 Sq. Ft. Service Areas 34,450 Additional Gross Area 151,650 Sq. Ft. Existing P&PD Building Area 66,680 Resultant Total Building Area 218,330 Sq. Ft. 1-8 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Figure 7A SCHEME 7 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECOND FLOOR 5Ey300 S.F. FIRST FLOOR 24,800 S.F. GROUND FLOOR EXISTING NEW Figure 7B 33,600 S.F. SCHEME 7 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 2 DESIGN FEATURES Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 2 DESIGN FEATURES 2.0 BASIS OF DEVELOPMENT: Criteria for the development of the character of the proposed expansion have been basically furnished by the Agency. DICON has, where necessary, made judgements on the conditions under which the final design would be executed. For example, bearing values were assumed and in the case of the existing building additional foundation capacity was not required. 2.1 DESIGN FEATURES: Requirements are basically the same for all seven Alternative Concepts. Schemes 1 through 5 and 7 are additions to the existing Printing and Photography Building and therefore must be compatible with this structure. Scheme 6 is conceived as a separate building and therefore may be provided with an exterior which is different. Building interiors for all schemes are required to provide space for two primary functions - offices and computer rooms. Service areas required for corridors, rest rooms, stairs, elevators, mechanical and electrical systems and equipment have been provided in addition to the spaces specified for administrative and computing functions and for UPS equipment. 2.2 CRITERIA: Criteria for the structural, mechanical and electrical features of the PP&D Building Expansion have been developed according to requirements provided by the Agency and are listed below. 2.2.1 Office Space Requirements o Floor live loading, minimum - 100 psf. o Floor finish - 8" pedestal floor, no carpet. o Exterior walls - vault-like, no windows. o Interior walls - corridor and separations between organizations to be VTR-like, 1-hour rating. o Interior partitions - relocatable gypsum wallboard, finish floor to finish ceiling, 35 STC. o Wall finishes - vinyl wall covering. o Suspended ceilings - 2 x 4 lay-in acoustic tile, non-shedding, NRC 75. o Interior doors - solid core wood, paint grade, 30 x 70. o Corridor doors - B-label, hollow metal. o Work stations - One station per 135 sf, each to have black phone, green phone, (1) CRT power & signal connection, (1) utility power outlet. o Electrical power - 4 watts per sf, minimum, including lighting; 2 watts per sf on emergency generator. o Lighting - 75 fc, switch to 50% in ceiling; task lighting at work stations. o Smoke detection - at ceiling and air plenums. o Fire protection - ordinary hazard sprinkler system throughout. o Alarms - safety and security to guard station. o HVAC - 720 + 50F., 55% + 10% RH 2-1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 2.2.2 Computer Space Requirements o Floor live loading, minimum - 150 psf. o Floor finish - 18" pedestal floor, plasilaminate. o Exterior walls - no windows, vault-like. o Interior partitions - vinyl wall covering. o Corridor walls, etc. - VTR-like, 1-hour rating. o Suspended ceiling - 2 x 4 lay-in acoustic tile, non-shedding, NRC 70-75. o Doors - 5' wide x 8' height. o Lighting - 100 fc, switch to 50 fc or 30-60-100%. o UPS - 60 Hz .07 KW per sf; 400 Hz .02 KW per sf. o Power load overall - estimate 45 watts per sf. o Smoke detection - at 3 levels; underfloor, ceiling, above ceiling. o Fire protection - drypipe pre-action sprinkler system. o HVAC - computer room type, floor standing, downflow to underfloor plenum, maintain 680 + 20F, 50% + 5% RH. House fresh air ventilation (temperedT ducted from ceiling. o Water detection underfloor. o RF shielding - "Tempest" shield 60 dB minimum, power filters, penetrations, optical isolators for signals leaving (allow 1 for 500 sf). o Alarms - safety and security to guard station. 2.3 SITE UTILITIES: For schemes 1, 2 and 3, the existing site utilities have been considered adequate. For schemes 4, 5, 6 and 7 it will be necessary to upgrade the central utilities distribution systems from the Powerhouse. Additional utilities required for these schemes include chilled water supply and return piping, fire water piping, sanitary sewer and electrical power. 2.4 STRUCTURAL AND ARCHITECTURAL CONSIDERATIONS: A. The existing building is a poured in place concrete structure with 24" x 24" concrete columns, creating 25'-0" x 30'-0" bays, supporting 10" thick two way reinforced flat plate concrete floor and roof slabs. At each column the slabs thicken 5" with 9'-0" x 10'-0" shear dropheads. It is anticipated that the same structure will be used for all building expansion in Schemes 1 through 5 and 7. Scheme 6, an independent building, could employ either a similar or independently designed structure. B. The exterior treatment of the existing building is composed of a horizontal band, at the First (top) Floor, of 5'-0" wide x 12'-91/2" high shaped precast architectural concrete framed panels with a sand blasted slightly exposed aggregate finish. It has been assumed, for estimating purposes, that relocated panels and new identical precast concrete panels will be used as architectural treatment for any horizontal expansion of the First Floor as well as for vertical addition of Second and Third Floors. The separate building of Scheme 6 may have a similar design or an independent design. 2-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 C. For the purpose of achieving a realistic estimate, the following Architectural/Structural assumptions have been made: o The concrete floor construction will have to be "stepped" to accommodate the varying depths of access flooring. o Exterior walls shall be composed of 6" thick precast concrete panels with an interior separate but adjacent to 8" thick concrete block wall. This is similar to existing building. o All door frames shall be hollow metal. o Vinyl wall covering shall be medium grade. o Relocatable walls shall be modular metal edged to allow for multiple relocations. 2.5 HEATING VENTILATING AND AIR CONDITIONING: In general, all new office spaces will be provided with a new central station, variable air volume air handling system consisting of the following components: o Supply air fan o Chilled water coil o Filter box o Return air fan o Distribution ductwork o VAV boxes o Return air ductwork o Chilled water piping o Thermal insulation for piping and ducting o Automatic temperature controls Provisions will be made for adequate fresh air make up and energy conservation features. Where Computer Room type HVAC units will be utilized these will contain chilled water coils, filters, humidifiers and reheat coils as necessary. Automatic controls will maintain required dry bulb temperature and relative humidity. Mechanical Equipment Rooms will be provided to house the central air conditioning units. Exhaust Systems will be provided to exhaust toilet rooms and mechanical and electrical equipment rooms. 2.6 PLUMBING: New toilet fixtures will be installed as required by Code. Plumbing work will include the installation of hot and cold water service piping as well as drain, waste and vent piping. Fixtures will include drinking fountains, water closets, lavatories, service sinks and urinals, including fixtures for handicapped persons. 2-3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 2.7 FIRE PROTECTION: New sprinkler risers will be installed which will tie into the existing or newly extended Fire Water Supply line. All spaces will be covered as noted previously. New alarm check valves and water flow switches will be installed, in both the wet pipe and dry pipe systems. 2.8 ELECTRICAL POWER SUPPLY: 2.8.1 Normal (Existing) Supply. The existing electrical service is provided to the Printing & Photography Building by 2 parallel 1000 KVA, 13,200 - 208/120 volt transformers located in the Electrical Room. Current loading on these transformers is estimated at only 25% (500 KVA). Therefore, even though the transformers are operating at a level far below their rated capacities, only Alternative No. 2 could safely be served by existing facilities. The other Alternatives would require additional transformer and switchgear capacity at the P&PD Building. The existing 13.2 KV cables which serve the building have an approximate combined capacity of 8500 KVA and are adequate. 2.8.2 Emergency Generator. Each scheme will require an emergency generator to provide the 2 watts per square foot needed in office spaces. The generator size will vary from 10 KW for scheme 1 to 275 KW for scheme 5. Generators will be diesel-driven and housed in the mechanical equipment room. 2.8.3 UPS Units. The size of UPS units required varies from 750 KW for Alternative No. 2 to 5000 KW for Alternatives 3 through 7. It is planned that for Alternatives 1, 3, 4, 5, 6 and 7 a new 13.2 KV feeder will be extended from the powerhouse to the P&PD Building to serve solely the UPS load. 2-4 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 3 ESTIMATING PROCEDURES _ - Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 3 ESTIMATING PROCEDURES 3.0 METHODOLOGY: Estimates of construction costs for the Alternative Concepts were developed by the simulation technique. The simulation technique develops units costs from completed facilities similar in whole or part to the proposed construction. The simulation technique differs from the averaging method by eliminating from the data base all of the costs which are not directly and specifically similar to the types and kinds of facilities and installations being estimated. For example, there is a substantial national data base on traditional commercial-type office buildings. This data is not acceptable to any of the Alternative Concepts for at least the following reasons: o Floor loadings in commercial office buildings are normally 70-100 pounds per square foot as opposed to 150 pounds per square foot specified for large areas of the PP&D Building Expansion. o Air circulation rates and air conditioning tonnage are significantly lower in standard commercial offices than will be required in the PP&D Expansion. ' o Power density allowances per square foot will be substantially greater in the PP&D Building Expansion than in commercial office buildings. DICON searched the data base maintained by the Parent Companies, and isolated facilities successfully completed, which matched closely the requirements of the PP&D Building Expansion. For example: o Data on 10 recently completed large computer facilities were used to determine electrical and air conditioning requirements and costs. o Data on reinforced concrete structures in the range of 50,000 to 200,000 square feet with floor loadings in excess of 100 pounds per square foot were evaluated to identify and estimate the structural frame. o Interior finish costs from 7 recently completed computer facilities were used for the interior finish costs. o Current market costs were obtained for items such as precast exterior elements, elevators, and other significant architectural features. Typical projects from which cost information was obtained were TRW Defense & Space System Group Facilities in Washington, D.C. and Los Angeles, and a large data processing facility now nearing completion for Farmers Insurance Company. These facilities have a high degree of similarity with the proposed expansion of the PP&D Building. 3-1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 3.1 APPROACH: The cost data described above was adjusted to reflect current costs where the data was more than 2 years old. The sample projects locations were known and costs could be adjusted on a geographical basis using national statistical indices. The impact of escalation or inflation has not been calculated. This will be a matter of programming the selected Alternative. Each of the Alternatives will be impacted differently. For example, the Alternative with the largest floor space will require the longest period of time to complete, and will therefore experience the largest escalation. 3.2 SPECIAL COST CONSIDERATION: Alternatives 1, 2, 3, 4, 5 and 7 involve additions to the existing PP&D Building. Estimated total construction cost has considered the work needed to prepare the existing PP&D Building and/or to provide the temporary construction required to make the existing building habitable during construction. It has been assumed that the existing building will accept the additional stories without the need for new foundations and/or strengthening of columns in Alternatives 1, 2, 4, 5 and 7. On the other hand, it has also been assumed that protective measures will be required to retain occupancy of the existing facility during construction. Alternative No. 3 involves a horizontal expansion and joining of the new and existing buildings. An allowance has been made to meet all of the life safety requirements for corridors, doors, etc. The need for site development work was recognized and estimated on the basis of an allowance for one automobile parking space for 320 to 400 square feet of building expansion. Site development costs include shrubs, plants, and trees in an area equal to the parking area. 3-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 4 COST ESTIMATES Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 4 COST ESTIMATES 4.0 COMPARISONS: The summary and comparison of estimated total cost for each Alternative Concept is shown below. Alternative 1 Description Estimated Cost Addition of one (1) floor $ 9,643,000 vertically 2 Addition of two (2) floors 12,622,000 vertically 3 Addition of two (2) floors 13,487,000 horizontally 4 Addition of two (2) floors 30,447,000 vertically and two (2) floors horizontally 5 Addition of two (2) floors vertically and four (4) floors horizontally 38,052,000 6 Construction of a new building 20,110,000 7 Addition of one (1) floor vertically 26,144,000 and three (3) floors horizontally Tables I through VII are cost breakdowns for the major features of each of the Alternatives. 4-1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 STAT Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE I ALTERNATIVE NUMBER 1 ADD ONE FLOOR ABOVE EXISTING CONSTRUCTION FEATURES 34,000 Sq. Ft. Computer Space 4,800 Sq. Ft. Office Space Total Gross Sq. Ft. 49,200 4,000 Sq. Ft. UPS 4 MW Uninterruptable Power Total Net Sq. Ft. 42,800 Supply Cost Code 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Estimated Costs Description ($1,000) False Work/Temporary Construction $ 200 Foundations NR Basement 701 Structure 430 Exterior Finish 200 Interior Finish 1,326 Computer Floor 795 Plumbing 40 Heating Ventilating and Air 475 Conditioning Fire Protection 120 Electrical 670 Utilities and Services 175 Special Features, UPS, etc. 500 Site Development 175 Security Features and Systems 1,000 Allowance for Upgrade of Central Utilities NR Total Direct Cost: $6,807 4-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 18 19 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) Sub Total: Contingency (15%) $ 816 7.623 1,143 Total Estimated Construction Costs: 8,766 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 877 Total Estimated Costs: $9,643 4-3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE II ALTERNATIVE NUMBER 2 ADD TWO FLOORS ABOVE EXISTING CONSTRUCTION FEATURES 6,600 Sq. Ft. Computer Space 68,000 Sq. Ft. Office Space 2,200 Sq. Ft. UPS 0.75 MW Uninterruptable Power Supply Cost Code 1 Total Gross Sq. Ft. 87,600 Total Net Sq. Ft. 76,800 Estimated Costs Description ($1,000) False Work/Temporary Construction $ 220 2 Foundations NR 3 Basement 701 4 Structure 765 5 Exterior Finish 400 6 Interior Finish 1,818 7 Computer Floor 834 8 Plumbing 75 9 Heating Ventilating and 746 Air Conditioning 10 Fire Protection 160 11 Electrical 590 12 Utilities and Services 350 13 Special Features, UPS, etc. 100 14 Site Development 350 15 Security Features and Systems 1,800 16 Allowance for Upgrade of Central Utilities NR Total Direct Cost: $8,909 4-4 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 18 19 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) $ 1,069 Sub Total: Contingency (15%) 9,978 1,497 Total Estimated Construction Costs: 11,475 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 1,147 Total Estimated Costs: $12,622 4-5 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE III ALTERNATIVE NUMBER 3 ADD TWO STORY BUILDING ADJACENT TO EXISTING CONSTRUCTION 50,000 Sq. Ft. Computer Space 8,800 Sq. Ft. Office Space 5,000 Sq. Ft. UPS 5.0 MW Uninterruptable Power Supply Cost Code 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 FEATURES Total Gross Sq. Ft. 85,100 Total Net Sq. Ft. 63,800 Estimated Costs Description ($1,000) False Work/Temporary Construction $ 75 Foundations 260 Basement 701 Structure 740 Exterior Finish 250 Interior Finish 2,202 Computer Floor 727 Plumbing 64 Heating Ventilating and 780 Air Conditioning Fire Protection 160 Electrical 661 Utilities and Services 300 Special Features, UPS, etc. 600 Site Development 300 Security Features and Systems 1,700 Allowance for Upgrade of Central Utilities NR Total Direct Cost: $9,520 4-6 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) $ 1,142 Sub Total: 10,662 18 Contingency (15%) 1,599 19 Total Estimated Construction Costs: 12,261 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 1,226 Total Estimated Costs: $13,487 4-7 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE IV ALTERNATIVE NUMBER 4 ADD TWO FLOORS ABOVE EXISTING CONSTRUCTION AND TWO FLOORS ADJACENT 50,000 Sq. Ft. Computer Space 76,800 Sq. Ft. Office Space 5,000 Sq. Ft. UPS 5.0 MW Uninterruptable Power Supply Cost Code 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 FEATURES Total Gross Sq. Ft. 161,300 Total Net Sq. Ft. 131,800 Estimated Costs Description ($1,000) False Work/Temporary Construction $ 350 Foundations 260 Basement 701 Structure 1,505 Exterior Finish 640 Interior Finish 3,726 Computer Floor 1,495 Plumbing 125 Heating Ventilating and 1,240 Air Conditioning Fire Protection 260 Electrical 1,518 Utilities and Services 400 Special Features, UPS, etc. 600 Site Development 470 Security Features and Systems 3,200 Allowance for Upgrade of Central Utilities 5,000 Total Direct Cost: $21,490 4-8 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) $ 2,579 Sub Total: 24,069 18 Contingency (15%) 3,610 19 Total Estimated Construction Costs: 27,679 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 2,768 Total Estimated Costs: $30,447 4-9 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE V ALTERNATIVE NUMBER 5 ADD TWO FLOORS ABOVE EXISTING CONSTRUCTION AND FOUR FLOORS ADJACENT 50,000 Sq. Ft. Computer Space 131,800 Sq. Ft. Office Space 5,000 Sq. Ft. UPS 5.0 MW Uninterruptable Power Supply Cost Code 1 FEATURES Total Gross Sq. Ft. 235,000 Total Net Sq. Ft. 186,800 Estimated Costs Description ($1,000) False Work/Temporary Construction $ 425 2 Foundations 390 3 Basement 701 4 Structure 2,245 5 Exterior Finish 750 6 Interior Finish 5,200 7 Computer Floor 2,100 8 Plumbing 182 9 Heating Ventilating and 1,800 Air Conditioning 10 Fire Protection 285 11 Electrical 1,550 12 Utilities and Services 450 13 Special Features, UPS, etc. 600 14 Site Development 580 15 Security Features and Systems 4,700 16 Allowance for Upgrade of Central Utilities 5,000 Total Direct Cost: $26,958 4-10 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 18 19 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) Sub Total: Contingency (15%) $ 3,235 30,193 4,529 Total Estimated Construction Costs: 34,722 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 3,472 Total Estimated Costs: $38,194 4-11 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE VI ALTERNATIVE NUMBER 6 50,000 Sq. Ft. Computer Space 5,000 Sq. Ft. Office Space 5,000 Sq. Ft. UPS 5.0 MW Uninterruptable Power Supply Cost Code 1 SEPARATE BUILDING FEATURES Total Gross Sq. Ft. 80,000 Total Net Sq. Ft. 60,000 Estimated Costs Description ($1,000) False Work/Temporary $ 50 Construction 2 Foundations 240 3 Basement NR 4 Structure 695 5 Exterior Finish 400 6 Interior Finish 2,100 7 Computer Floor 705 8 Plumbing 65 9 Heating Ventilating and 729 Air Conditioning 10 Fire Protection 130 11 Electrical 1,130 12 Utilities and Services 300 13 Special Features, UPS, etc. 600 14 Site Development 450 15 Security Features and Systems 1,600 16 Allowance for Upgrade of Central Utilities 5,000 Total Direct Cost: $14,194 4-12 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 18 19 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) $ 1,703 Sub Total: Contingency (15%) 15,897 2,385 Total Estimated Construction Costs: 18,282 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 1,828 Total Estimated Costs: $20,110 4-13 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE VII ALTERNATIVE NUMBER 7 ADD ONE FLOOR ABOVE EXISTING CONSTRUCTION AND THREE FLOORS ADJACENT FEATURES 43,000 Sq. Ft. Printshop Space 6,600 Sq. Ft. Computer Space 65.400 Sq. Ft. Office Space Total Gross Sq. Ft. 151,650 2,200 Sq. Ft. UPS 5.0 MW Uninterruptable Power Total Net Sq. Ft. 117,200 Supply Cost Code 1 Estimated Costs Description ($1,000) False Work/Temporary Construction $ 275 2 Foundations 340 3 Basement 701 4 Structure 1,450 5 Exterior Finish 500 6 Interior Finish 2,637 7 Computer Floor 805 105 8 Plumbing 9 Heating Ventilating and 1,140 Air Conditioning 210 10 Fire Protection 11 Electrical 1,465 12 Utilities and Services 375 13 Special Features, UPS, etc. 250 14 Site Development 450 15 Security Features and Systems 2,750 16 Allowance for Upgrade of Central Utilities 5,000 Total Direct Cost: $18,453 4-14 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R0008008900Q5-9 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Cost Code 17 18 19 Estimated Costs Description ($1,000) Contractor's Plant Equipment, Overhead and Profit (12%) Sub Total: Contingency (15%) $ 2,214 20,667 3,100 Total Estimated Construction Costs: 23,767 Engineering Fees-Concepts, Plans Specifications, Construction Support Services (10%) 2,377 Total Estimated Costs: $26,144 4-15 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 5 CONSTRUCTION SCHEDULES Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 SECTION 5 CONSTRUCTION SCHEDULES 5.0 ASSUMPTIONS: Scheduling of the design and construction of the expansion of the P&PD Building was based on design and construction being accomplished on a traditional Government type contract with an Architect-Engineer and a Construction Contractor being separately and sequentially retained. Overall management of the Architect-Engineer and construction program was assumed to conform to Government requirements for competitive award of contracts. 5.1 MAJOR MILESTONES AND PROJECT SCHEDULES: The overall management plan for design and construction established the control and departure milestones and schedules as indicated on the following summary sheets and diagrams for each of the six Alternatives. These milestones and schedules were selected to follow traditional standards and to provide the Agency with the review opportunities that would assure obtaining the specified functional and performance capabilities on budget without unnecessary schedule restraint. The schedules include allowances for design review by the Agency at 35%, 60%, 90% and 100% completion. 5.2 PROJECT SCHEDULES: Table VII is a Summary Schedule for the milestones described above for each of the seven Alternative Concepts. 5-1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 TABLE VII SUMMARY SCHEDULES DESIGN AND CONSTRUCTION ELAPSED TIME IN MONTHS Alternatives Milestone Description 1 2 3 4 5 6 7 1 Programming & Conceptual Design 3 3 3 3 3 3 3 2 Agency Review 4 4 4 4 4 4 4 3 Design Development 8 8 10 10 10 8 10 4 Fix Budget and Schedule 9 9 11 11 11 9 11 5 Agency Review 11 11 13 13 13 11 13 6 Long Lead Equipment Order 12 12 14 14 14 12 14 cri ' na 7 100% Completion Contract Documents 16 16 18 18 18 16 18 8 - 9 Agency Review & Design Acceptance 18 18 20 20 20 18 20 10-11 Bid Period & Award of Contract 19 19 21 21 21 19 21 12 Site Utilities Construction 21 21 24 24 24 21 24 13 Structural Frame Construction 25 27 25 27 29 27 26 14 Electrical Construction 29 32 34 36 37 32 35 15 Mechanical/Plumbing Construction 30 33 35 36 37 33 35 16 Exterior Architectural Finishes 27 30 31 31 31 30 31 17 Paving & Landscaping Construction 35 38 38 39 42 36 38 18 Interior Architectural Construction 34 36 35 38 40 34 37 19 Building Occupancy by Agency 35 38 38 39 41 36 38 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 plix) Dammam EUPAGIMORI 011 7/11/6 10/2 PROGRAMMING & CONCEPTUAL DESIGN 10/2 AGENCY REVIEW 11 /6 DESIGN DEVELOPMENT '2/28 2/28 FIX BUDGET & SCHEDULE 4/11 6/6 LONG LEAD EQUIPMENT PLACE ORDER ? 4 /1 1 11/7 AGENCYJ REVIEW AGENCY REVIEW fia CONTRACT DOCUMENTS COMPLETE SPECS. & DWGS. 11/7 1/7 1/7/87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 FINAL DESIGN y ACCEPTANCE /7/87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 8/14 9/25 1 /7 H BID PER IOD & NEGOTIATIONS 2/6 2/6/87 AW ARD OF CONTRACT 2/6 87 2/6 STRUCTURAL FRAME CONSTRUCTION 8 /1\4 2./6 SITE UT LIT IES CONSTRUCTION EXTERIOR ARCHITECTURAL FINISHES 8/14 INTERIOR ARCHITECTURAL FINISHES 9/25 5/13 MECHANIC AL & PLUMBING CONSTRUCTION 1 2'/'i.8 8./14 ELECTRIC AL CONSTRUCTION 11/20 4/10 PAVING & L ANDSC APING CONSTRUCTION 4/10 613. AGENCY OCCUPIES BUILDING 6/3/88 EILAP@ED VOINE la g3 HORIVIN INCOME) Earliest Start La Latest Finish Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/1 1 2 3 4 1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PaR3 DUMDUM EMPARICION Oil Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish PROGRAMMING & CONCEPTUAL 4 7/1/85 7/1/85 10/2/85 10/2/85 AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 DESIGN DEVELOPMENT 3 11/6/85 11/6/85 2/28/86 2/28/86 FIX BUDGET & SCHEDULE 2 2/28/86 2/28/86 4/11/86 4/11/86 AGENCY REVIEW 2 4/11/86 4/11/86 6/6/86 6/6/86 LONG LEAD EQUIPMENT PLACE 11 6/6/86 6/6/86 7/7/86 7/7/86 CONTRACT DOCUMENTS 6 6/6/86 6/6/86 11/7/86 11/7/86 AGENCY REVIEW 2 11/7/86 11/7/86 1/7/87 1/7/87 FINAL DESIGN ACCEPTANCE 0 1/7/87 1/7/87 1/7/87 1/7/87 BID PERIOD & NEGOTIATIONS 2 1/7/87 1/7/87 " 2/6/87 2/6/87 AWARD OF CONTRACT 0 2/6/87 2/6/87 2/6/87 2/6/87 !SITE UT L IT IES CONSTRUCTION 3 2/6/87 2/6/87 4/10/87 4/10/87 ; STRUCTURAL FRAME 6 2/6/87 2/6/87 8/14/87 8/14/87 ELECTRICAL CONSTRUCTION 3 8/14/87 8/14/87 11/20/87 11/20/87 i MECHANICAL & PLUMBING 4 8/14/87 8/14/87 12/18/87 12/18/87 EXTERIOR ARCHITECTURAL 1 8/14/87 8/14/87 9/25/87 9/25/87 r PAVING & LANDSCAPING , 2 4/10/87 4/10/87 6/3/88 6/3/88 k INTERIOR ARCHITECTURAL 9 9/25/87 9/25/87 5/13/88 5/13/88 0 AGENCY OCCUPIES BUILDING 0 6/3/88 6/3/88 6/3/88 6/3/88 ' 1(M, ' 0 7/1/85 7/1/85 7/1/85 7/1/85 npriassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PIPE) MUULDORIO EUPAIIMION 02 711 PROGRAMMING & CONCEPTUAL DESIGN 10/2 10/2 AGENCY REVIEW 11 /6 1 1/6 DESIGN DEVELOPMENT 2 /28 2/28 FIX BUDGET & SCHEDULE 4/11 6 /6, LONG LEAD EQU PMENT PLACE ORDER ? 4/11 ILI AGENCYJ REVIEW 1/7 AGENCY REVIEW CONTRACT DOCUMENTS COMPLETE SPECS. & DWGS. 11/7 LL 1/7/87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 FINAL DESIGN) ACCEPTANCE 1/7/87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 10/12 1 /7 BID PERIOD & NEGOTIATIONS 2/6/87 2/6 AWARD OF CONTRACT 2/6 2/6 STRUCTURAL FRAME CONSTRUCTION 10/1-2 2./6 SITE UT L IT IES CONSTRUCTION EXTERIOR ARCHITECTURAL FINISHES 12/18 10/12 MECHANICAL & PLUMBING CONSTRUCTION 4/8 ELECTRICAL CONSTRUCTION 12/18 INTERIOR ARCHITECTURAL FINISHES 3/11 4/10, 4 /1 0 PAVING & LANDSCAPING CONSTRUCTION 8/26 7/15 8/26/88 AGENCY OCCUPIES BUILDING 8/26/88 BLAMED 'FOHE a BM HUM@ ELE@EIVID Earliest Start 7 /1 Latest Finish Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 1 1 1 1 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 MOD DRIEHRIt Eg3PM311011 022 Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish PROGRAMMING & CONCEPTUAL 4 7/1/85 7/1/85 10/2/85 10/2/85 AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 DESIGN DEVELOPMENT 3 11/6/85 11/6/85 2/28/86 2/28/86 FIX BUDGET & SCHEDULE 2 2/28/86 2/28/86 4/11/86 4/11/86 AGENCY REVIEW 2 4/11/86 4/11/86 ' 6/6/86 6/6/86 LONG LEAD EQUIPMENT PLACE 1 6/6/86 6/6/86 7/7/86 7/7/86 CONTRACT DOCUMENTS 6 6/6/86 6/6/86 11/7/86 11/7/86 AGENCY REVIEW 2 11/7/86 11/7/86 1/7/87 1/7/87 FINAL DESIGN ACCEPTANCE 0 1/7/87 1/7/87 1/7/87 1/7/87 BID PERIOD & NEGOTIATIONS 2 1/7/87 1/7/67 2/6/87 2/6/87 AWARD OF CONTRACT 0 2/6/87 2/6/87 2/6/87 2/6/87 SITE UTILITIES CONSTRUCTION 3 2/6/87 2/6/87 4/10/87 4/10/87 STRUCTURAL FRAME 9 2/6/87 2/6/87 10/12/87 10/12/87 ELECTRICAL CONSTRUCTION 4 10/12/87 10/12/87 3/11/88 3/11/88 MECHANICAL & PLUMBING 5 10/12/87 10/12/87 4/8/88 4/8/88 EXTERIOR ARCHITECTURAL 1 10/12/87 10/12/87 , 12/18/87 12/18/87 PAVING & LANDSCAPING 2 4/10/87 4/10/87 8/26/88 8/26/88 INTERIOR ARCHITECTURAL 9 12/18/87 12/18/87 7/15/88 7/15/88 1 AGENCY OCCUPIES BUILDING 0 8/26/88 8/26/88 8/26/88 8/26/88 1 ' 1E6?11.0 0 7/1/85 7/1/85 7/1/85 7/1/85 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7 / 1 ; PROGRAMMING & CONCEPTUAL DESIGN 1 0 / 2 NOD DMILI EUPANSOORI 0E1 1 0 /2 AGENCY REVIEW 11 /6 11 /6 DESIGN DEVELOPMENT 4/25 4/25 FIX BUDGET & SCHEDULE 6/6 8 / 1 LONG LEAD EQUPMENT PLACE ORDER 6 / 6 AGENCY REVIEW .1 1 /7 AGENCY REVIEW CONTRACT DOCUMENTS COMPLETE SPECS. 8s MS. ILl Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 3/6/87 ---1/4---- (FINAL DESIGN ACCEPTANCE 3/6/8 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 8/14 2/12 3/6 4/10/87 BID FERIOD & NEGOTIATIONS 4/10 ARD OF CONTR ACT 4 ?1l 87 4 / 1 0 EXTERIOR ARCHITECTURAL FINISHES STRUCTURAL FRAME CONSTRUCTION 4 /10 INTERIOR ARCH ITECTUR AL FINISHES 2/12, 6/17 MECHANIC AL & PLUMBING CONSTRUCT ION 6/3 SITE UTILITIES CONSTRUCTION 8/14 ELECTRIC AL CONSTRUCTION ?1.?. PAVING & L ANDSC AP ING CONSTRUCTION 7/15 8/26 V26/88 AGENCY OCCUPIES BUILDING 8/26/89 MAME) 1TOHE 13C3 INOEIrn ENORIIID Earliest Start 7 /1 ? Latest Finish Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/i 1 2 3 4 5 6 7 9 10 11 12 13 14 1 1 1 1 1 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 NPL 13E10E10 EMPAinaKA Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish PROGRAMMING & CONCEPTUAL 4-1 7/1/85 7/1/85 10/2/85 10/2/85 AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 DESIGN DEVELOPMENT 5 11/6/85 11/6/85 4/25/86 4/25/86 FIX BUDGET & SCHEDULE 2 4/25/86 4/25/86 ,6/6/86 6/6/86 AGENCY REVIEW 2 6/6/86 6/6/86 8/1/86 8/1/86 LONG LEAD EQUIPMENT PLACE 1 8/1/86 8/1/86 9/1/86 9/1/86 CONTRACT DOCUMENTS 6 8/1/86 8/1/86 1/7/87 1/7/87 AGENCY REVIEW 2 1/7/87 1/7/87 3/6/87 3/6/87 FINAL DESIGN ACCEPTANCE 0 3/6/87 3/6/87 3/6/87 3/6/87 BID PERIOD & NEGOTIATIONS 2 3/6/87 3/6/87 4/10/87 4/10/87 AVARD OF CONTRACT 0 4/10/87 4/10/87 4/10/87 4/10/87 SITE UTILITIES CONSTRUCTION 4 4/10/87 4/10/87 7/15/87 7/15/87 STRUCTURAL FRAME 9 4/10/87 4/10/87 8/14/87_ 8/14/87 ELECTRICAL CONSTRUCTION 4 8/14/87 8/14/87 5/6/88 5/6/88 MECHANICAL & PLUMBING 5 8/14/87 8/14/87 6/3/88 6/3/88 EXTERIOR ARCHITECTURAL 1 8/14/87 8/14/87 2/12/88 2/12/88 PAVING & LANDSCAPING 2 7/15/87 7/15/87 8/26/88 8/26/88 INTERIOR ARCHITECTURAL 7 2/12/88 2/12/88 6/17/88 6/17/88 'AGENCY OCCUPIES BUILDING o 8/26/88 8/26/88 8/26/88 8/26/88 1 ' L ESE/VP 0 7/1/85 7/1/85 7/1/85 7/1/85 narinccifipri in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/1 PROGRAMMING & CONCEPTUAL DESIGN 1 0 /2 PIPE) [110111,DIEN IMPAIMI?liil 041 10/2 AGENCY REVIEW 11/6 11 /6 DESIGN DEVELOPMENT 4/25 4/25 FIX BUDGET & SCHEDULE 6/6 8/1 LONG LEAD EQUIPMENT PLACE ORDER 6/6 AGENCYJ REVIEW 1/7 AGENCY REVIEW CONTRACT DOCUMENTS COMPLETE SPECS. & DWGS. ILL 3 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 3/6/87 (FINAL DESIGN ACCEPTANCE 3/6/87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01 CIA-RDP88G01332R000800890005-2 10/12 3 /6 4/10/87 BID IOD & NEGOTIATIONS 4 /1 0 AWARD OF CONTRACT 4 ft 87 4/10_ STRUCTURAL FRAME CONSTRUCTION 10/1-2 4/21_Q. SITE UT L ITIES CONSTRUCTION EXTERIOR ARCHITECTURAL FINISHES 1/15 10/12 MECHANICAL & PLUMBING CONSTRUCTION 7/1 ELECTRICAL CONSTRUCTION 1 /15 INTERIOR ARCHITECTURAL FINISHES 8 /26 7 /i 9123/88 AGENCY OCCUPIES BUILDING 7(15 7/15 PAYING & LANDSCAPING CONSTRUCTION 9/23/88 HAMM TONE gt MEMO@ ILEECORM Earliest Start LLI Latest Finish 1-1,,,-inecifiari in Part - Sanitized Cooly Approved for Release 2011/12/01 : CIA-RDP88G01332R000800890005-2 7/i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 1 1 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 MOD DUMDUM E3Palt4311011 Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish PROGRAMMING & CONCEPTUAL 4 7/1/85 7/1/85 10/2/85 10/2/85 AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 DESIGN DEVELOPMENT 5 11/6/85 11/6/85 4/25/86 4/25/86 FIX BUDGET & SCHEDULE 2 4/25/86 _ 4/25/86 6/6/86 6/6/86 AGENCY REVIEW 2 6/6/86 6/6/86 8/1/86 8/1/86 LONG LEAD EQUIPMENT PLACE 1 8/1/86 8/1/86 9/1/86 9/1/86 CONTRACT DOCUMENTS 6 8/1/86 8/1/86 1/7/87 1/7/87 AGENCY REVIEW 2 1/7/87 1/7/87 3/6/87 3/6/87 FINAL DESIGN ACCEPTANCE 0 3/6/87 3/6/87 3/6/87 3/6/87 BID PERIOD & NEGOT I AT IONS 2 3/6/87 3/6/8.7 4/10/87 4/10/87 AWARD OF CONTRACT 0 4/10/87 4/10/87 4/10/87 4/10/87 SITE UT IL IT ES CONSTRUCTION 4 4/10/87 4/10/87 7/15/87 7/15/87 STRUCTURAL FRAME 0 4110/87 4/10/87 10/12/87 10/12/87 ELECTRICAL CONSTRUCTION 7 10/12/87 10/12/87 7/1/88 7/1/88 MECHANICAL & PLUMBING 7 10/12/87 10/12/87 7/1/88 7/1/88 EXTERIOR ARCHITECTURAL 1 10/12/87 10/12/87 1/15/88 1/15/88 PAVING & LANDSCAPING 2 7/15/87 7/15/87 9/23/88 9/23/88 INTERIOR ARCHITECTURAL 9 1/15/88 1/15/88 8/26/88 8/26/88 AGENCY OCCUPIES BUILDING 0 9/23/88 9/23/88 9/23/88 9/23/88 LESEND 0 7/1/85 7/1/85 7/1/85 7/1/85 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PEOD MUNN EUPAIRMOCRI 06 la10/2 11/6 PROGRAMMING & CONCEPTUAL DESIGN 10/2, AGENCY REVIEW 11/6 DESIGN DEVELOPMENT 4/25 FIX BUDGET & SCHEDULE 6/6 8/1 LONG LEAD EQUIPMENT PL ACE ORDER 6/6 AGENCY REVIEW ./ i2LL La AGENCY REVIEW CONTRACT DOCUMENTS COMPLETE SPECS. & DWGS. 1 /7 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 FINAL DESIGN ACCEPTANCE / 6/8 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 12/11 2/1/ / 6 4 / 1 0 / 87 BID PERIOD & NEGOTIATIONS 4/10 AWARD OF CONTR ACT 4110/87 STRUCTURAL FRAME CONSTRUCTION ' 12/i1 EXTERIOR ARCHITECTURAL FINISHES INTER IOR ARCHITECTURAL FINISHES 2 /12 10/21 MECHANICAL & PLUMBING CONSTRUCT ION 7/29 ELECTRICAL CONSTRUCTION 7/29 M 0 7/15 SITE UT L ITIES CONSTRUCTION 7/15 PAVING & LANDSCAPING CONSTRUCTION 11/25 10/24 /88 AGENCY OCCUPIES BUILDING 10/21/88 ELAIID431ED TEE Ea 41c) NO1311111@ Earliest Start.,/1 IfECIEDID Latest Finish Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 ROD C3UFLIIII1t EMINIZEOCE3 00 Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish PROGRAMMING & CONCEPTUAL 4 7/1/85 7/1/85 10/2/85 10/2/85 AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 DESIGN DEVELOPMENT 3 11/6/85 11/6/85 4/25/86 4/25/86 FIX BUDGET & SCHEDULE 2 4/25/86 4/25/86 6/6/86 6/6/86 AGENCY REVIEW 2 6/6/86 6/6/86 _ 8/1/86 8/1/86 LONG LEAD EQUIPMENT PLACE 1 8/1/86 8/1/86 9/1/86 9/1/86 CONTRACT DOCUMENTS 6 8/1/86 8/1/86 1/7/87 1/7/87 AGENCY REVIEW 2 1/7/87 . 1/7/87 3/6/87 3/6/87 FINAL DESIGN ACCEPTANCE 0 3/6/87 3/6/87 3/6/87 3/6/87 BID PERIOD & NEGOTIATIONS 2 3/6/87 3/6/87 4/10/87 4/10/87 AWARD OF CONTRACT 0 4/10/87 4/10/87 4/10/87 4/10/87 SITE UTILITIES CONSTRUCTION 3 4/10/87 4/10/87 7/15/87 7/15/87, STRUCTURAL FRAME 9 4/10/87 4/10/87 12/11/87 12/11/87 ELECTRICAL CONSTRUCTION 4 12/11/87 12/11/87 7/29/88 7/29/88 MECHANICAL & PLUMBING ,.,..? 12/11/87 12/11/87 7/29/88 7/29/88 EXTERIOR ARCHITECTURAL 1 12/11/87 12/11/87 2/12/88 2/12/88 PAVING & LANDSCAPING 2 7/15/87 7/15/87 11/25/88 11/25/88 INTERIOR ARCHITECTURAL 7 2/12/88 2/12/88 10/21/88 10/21/88 AGENCY OCCUPIES BUILDING 0 10/21/88 10/21/88 10/21/88 10/21/88 " 1 WHO ' 0 711/85 7/1/85 7/1/85 7/1/85 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PIPE) DMILLMIN EUPAHODA aa 7/111/6 10/2 PROGRAMMING & CONCEPTU AL DESIGN 10/2 AGENCY REVIEW 11/6 DESIGN DEVELOPMENT 2/28 2/28 FIX BUDGET & SCHEDULE 4/11 6/6 LONG LEAD EQUIPMENT PLACE ORDER 4/11 AGENCYJ REVIEV/ 6./6 7/7 6/6 11/7 AGENCY REVIEW CONTRACT DOCUMENTS COMPLETE SPECS. Sc DWGS. 11 /7 121---...,...?.._ 1 /7 /87 _....____ (FINAL DESIGN ACCEPTANCE Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 1/7/87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 10/12 12/18 2 /6 STRUCTURAL FRAME CONSTRUCTION 10/1-2 1/7 2 /6 /87 BID HFRI0D AW ARD OF & NEGOT I AT IONS CONTRACT 2/6 ./6 SITE UT L IT IES CONSTRUCT ION EXTER IOR ARCH ITECTUR AL FIN ISHES 1 0 / 1 2 INTER IOR ARCH ITECTUR AL FINISHES 12/18 5/13 MECHANIC AL & PLUMBING CONSTRUCT ION 4/8 ELECTRIC AL CONSTRUCTION 4/10 4/10 PAVING & L ANDSCAP ING CONSTRUCTION ILL AGENCY OCCUPIES BUILDING 7/1 /88 MANED UNE a 3513 HOEI'M illicaamo Earliest Start? /1 Latest Finish Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/i 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 MOD ima.mon mg3Paritalcm 00 Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish PROOR Al 111ING & CONCEPTUAL 4 7/1/85 7/1/85 10/2/85 10/2/85 AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 DESIGN DEVELOPMENT 3 11/6/85 11/6/85 2/28/86 2/28/86 FIX BUDGET & SCHEDULE 2 2/28/86 2/28/86 4/11/86 4/11/86 AGENCY REVIEW 2 4/11/86 4/11/86 s'6/6 /86 6/6/86 LONG LEAD EQUIPMENT PLACE 1 6/6/86 6/6/86 7/7/86 7/7/86 CONTRACT DOCUMENTS , 6 6/6/86 6/6/86 11/7/86 11/7/86 AGENCY REVIEW 2 11/7/86 - 11/7/86 1 /7/87 1/7/87 FINAL DESIGN ACCEPTANCE d 1 mei 1/7/87 1/7/87 1/7/87 2/6/87 BID PERIOD & NEGOTIATIONS 2 1/7/87 1/7/87 ._ 2/6/87 AWARD OF CONTRACT 0 2/6/87 216/87 2/6/87 2/6/87 SITE UTILITIES CONSTRUCTION 3 2/6/87 2/6/87 4/10/87 4/10/87 STRUCTURAL FRAME 9 2/6/87 2/6/87 10/12/87 10/12/87 ELECTRICAL CONSTRUCTION 4' 10/12/87 10/12/87 3/11/88 3/11/88 MECHANICAL &PLUMBING 5 10/12/87 10/12/87 4/8/88 4/8/88 EXTERIOR ARCHITECTURAL 1 10/12/87 10/12/87 12/18/87 12/18/87 P AV ING & LANDSC APING 2 4/10/87 4/10/87 7/1/88 7/1/88 INTERIOR ARCHITECTURAL 7 12/18/87 12/18/87 5/13/88 5/13/88 AGENCY OCCUPIES BUILDING 0 7/1/88 7/1/88 7/1/88 7/1/88 ' L ESENL) ' 0 7/1/85 7/1/85 711/85 7/1/85 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/1 PROGRAMMING & CONCEPTUAL DESIGN 1Q12. PQM) MIBILOgin EUP.Megall 07 10/2 AGENCY REVIEW 11/6 11 /6, DESIGN DEVELOPMENT 4 /25 4/25 FIX BUDGET & SCHEDULE LL LONG LEAD EQUIPMENT PLACE ORDER ELL 1/7 CONTRACT DOCUMENTS COMPLETE SPECS. & DWGS. LLi LL 3 /6 /87 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 IFINAL DESIGN) ACCEPTANCE 3/6/e Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 3/6 H BID PERIOD & NEGOTIATIONS 4/10 4/10/87 AWARD OF CONTRACT 4 1./8 4/10 STRUCTURAL FRAME CONSTRUCTION 4 /10 EXTERIOR ARCHITECTURAL FINISHES 2113. MECHANICAL & PLUMBING CONSTRUCTION ka SITE UT LITIES CONSTRUCTION 9111 ELECTRICAL CONSTRUCTION fiLl 7/15 2 /12 INTERIOR ARCHITECTURAL FINISHES 7 /15 PAVING & LANDSCAPING CONSTRUCTION kai 71.22 P/26/88 AGENCY OCCUP ES BUILDING 8/26/88 MANED TOME asi EC) METH@ LIEEIRE Earliest Start Z.ZI Latest Finish Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 7/1 1 2 3 4 5 6 7 9 1 11 1 1 1 1 1 1 19 2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 PeaPE) 13511[1[1.111111) IEMPAIIE1011 01I Task Name Months Earliest Start Earliest Finish Latest Start Latest Finish Fixed Cost Resource Cost Fixed Inc, PROGRAMMING & CONCEPTUAL 4 7/1/85 7/1/85, 10/2/85 10/2/85 0 0 . AGENCY REVIEW 1 10/2/85 10/2/85 11/6/85 11/6/85 0 0 DESIGN DEVELOPMENT 5 11/6/85 11/6/85 4/25/86 4/25/86 0 0 FIX BUDGET & SCHEDULE 2 4/25/86 4/25/86 6/086 6/6/86 0 0 . AGENCY REVIEW 2 . 6/6/86 ?6/6/86 ,, 8/1/86 8/1/86 0 0 LONG LEAD EQUIPMENT PLACE 1 8/1/86 8/1/86 9/1/86 , 9/1/86 0 0 . CONTRACT DOCUMENTS 6 _ 8/1/86 8/1/86 1/7/87, 1/7/87 0 0 _ AGENCY REVIEW 2 1/7/87 1/7/87 3/6/87 3/6/87 0 0 FINAL DESIGN ACCEPTANCE 0 3/6/87 3/6187 3/6/87 r 3/6/87 0 0' BID PERIOD & NEGOTIATIONS 2 3/6/87 3/6/87 4/10/87 4/10/87 0 0 AWARD OF CONTRACT _ 0 4/10/87 4/10/87 4/10/87 4/10/87 0 0 SITE UTILITIES CONSTRUCTION 4 4/10/87 4/10/87 7/15/87 7/15/87 0 0 STRUCTURAL FRAME 10 4/10/87 4/10/87 9/11/87 , 9/11/87 0 0 ELECTRICAL CONSTRUCTION 4., 9/11/87 9/11/87 6/3/88 6/3/88 0 0 MECHANICAL & PLUMBING 5 9/11/87 9/11/87 6/3/88 6/3/88 0 0 EXTERIOR ARCHITECTURAL 1 9/11/87 9/11/87 2/12188 2/12/88 0 0 PAVING & LANDSCAPING 2 7/15/87 7/15/87 8/26/88 8/26/88 0 0 1 INTERIOR ARCHITECTURAL 4 2/12/88 2/12/88 7/29/88 7/29/88 0 0 'AGENCY OCCUPIES BUILDING 0 8/26/88 8/26/88 8/26/88 8/26/88 0 0 ' LISEND ' 0 7/1/85 7/1/95 7/1/85 7/1/85 0 N- 0 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 STAT STAT STAT TRANSMITTAL SLIP --._ 28 July 1986 TO: DDA ROOM NO. 7-D-24 BUILDING Hqs. REMARKS: The Director us to provide to Mr. Donnelly. extra copies sending subsequent _))2 A AP 4 of Logistics asked a copy of the attached There are a few attached. We will be issues. JUL 1986 1981 0 31 JUL Sfi/ C _ FROM: 0L/PPD ROOM NO. 154 BUILDING P&P )N FORM NO.,, REPLACES FORM 36-8 L 1 FEB 56 4 1 WHICH MAY BE USED. Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 (47) 25X1 Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2 R Next 4 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2011/12/01: CIA-RDP88G01332R000800890005-2